Ndlambe LED Strategic Plan 2009 – 2014 Final Document Contents 1 Factors influencing LED strategies .................................................................................................. 1 2 Local Imperatives............................................................................................................................... 2 2.1 3 4 5 6 Strategic Implications.............................................................................................................. 3 Strategic Pillars .................................................................................................................................... 6 3.1 Pillar 1 – Sector Prioritisation ................................................................................................. 6 3.2 Pillar 2 – Strategic Infrastructure Development ..................................................................... 7 3.3 Pillar 3 - Business Support Initiatives ...................................................................................... 7 3.4 Pillar 4 - Skills Development .................................................................................................... 8 3.5 Pillar 5 – Social Upliftment ...................................................................................................... 8 Strategic Enablers ............................................................................................................................ 10 4.1 Robust Project Un-bottlenecking .......................................................................................... 10 4.2 Assessment of Municipal and Public Assets ......................................................................... 10 4.3 Institutional Development .................................................................................................... 11 4.4 Partnership Building .............................................................................................................. 12 4.5 Strategic Approach................................................................................................................ 12 Organisational Strategy .................................................................................................................. 14 5.1 Towards a LEDA or LED unit .................................................................................................. 14 5.2 Recommendations ................................................................................................................ 15 5.2.1 Strengthening of the LED units ..................................................................................... 15 5.2.2 Towards Establishing a LEDA ........................................................................................ 15 Knowledge Management Strategy ............................................................................................. 18 6.1 Developing Internal Capacity ................................................................................................ 18 6.2 Developing Critical Partnerships ........................................................................................... 19 6.3 Managing Information & Documents ................................................................................... 19 7 Financing Strategy ........................................................................................................................... 21 8 Project Categorisation .................................................................................................................... 24 8.1 9 Interventions by Category..................................................................................................... 24 Project Implementation Plan ......................................................................................................... 26 Ndlambe LED Strategy 2009 Page i LED Strategic Planning: Context Contents 1 Factors influencing LED strategies 1 2 Local Imperatives 2 LED...is about local activities to make markets work better (Dr Jörg Meyer-Stamer, GTZ) 1 Factors influencing LED strategies A range of generic factors have a bearing on the focus and content of LED strategies. The policy guidelines for implementing LED in South Africa distinguish between ‘supply side’ and ‘demand side’ drivers for LED in the context of a developmental state. Supply-side measures involve what national and provincial government do within district and metropolitan areas, and are captured in: National policies and programs Provincial priorities (articulated in the PGDP) Demand-side measures refer to what district and local municipalities together with local role players do to grow the local economy. These include: Understanding the socio-economic environment Institutional capacity The local development agenda Current programs of local municipalities as expressed in their IDPs The challenge for municipalities, when developing an LED strategy, is to ensure the correct / desirable balance between the 2 sets of measures. Strategies are currently dominated by the supplyside measures (availability of funding or the need to comply with legislation, for example). Unless the appropriate balance is achieved, strategies will continue to be mechanistic, and lack the local responsiveness that will give them dynamism and lead to positive LED results. The following figure outlines the influencing factors of an LED Strategy: Figure 1 - Influencing Factors Ndlambe LED Strategy 2009 Page 1 2 Local Imperatives The development of this LED strategy is guided by the existing policies of the Ndlambe Municipality, as well as the District, Provincial and National frameworks. These include: Ndlambe IDP (Review 2008/09) Ndlambe Spatial Development Framework (2006) Ndlambe Responsible Tourism Sector Plan (2008, draft Review of Situation Analysis) Cacadu Area Based Plan and Land Availability Audit (2008) EC Provincial Growth & Development Plan National Spatial Development Perspective In alignment with the NSDP and PGDP, the Ndlambe Municipality projects are assessed in terms of the following principles: Contributes towards economic growth and poverty alleviation Government spend – over and above basic services provision – is directed towards the stimulation of sustainable economic development and income-generating / employment opportunities The developmental efforts of the municipality are focused on people rather than places – this may include capital investment, human resource development and social transfers Nodal and corridor development which supports the aim of redressing the spatial distortions of development Increasing the opportunity for meaningful stakeholder participation From the Ndlambe IDP, we recognize the following priorities which have a direct bearing upon the LED Strategy: Addressing Infrastructure issues: Sanitation backlogs Road condition Business infrastructure – including light industry & commerce The implementation of effective development planning and implementation, – especially as the upper-income residential, holiday home and tourism construction sector play such a vital role in Ndlambe’s economy Addressing internal capacity issues Ndlambe LED Strategy 2009 Page 2 Promoting effective management of Council assets through the implementation of critical systems Improving the role of the Municipality with regards to economic development – with specific reference to Tourism Increasing disaster management capacity The IDP further outlines some of the critical challenges facing the Ndlambe Municipality with regards to LED. Whilst the section on Institutional Development focuses in more detail on these issues, some key points include: Limited institutional capacity to deliver on LED – although one expects this to increase somewhat with the appointment of the LED Manager (April 2009) Lack of meaningful participation from stakeholders Existing municipal assets are not sufficiently used to promote the local economy The municipality is currently not ma The key economic sectors upon which the municipality would wish to focus are: Tourism Agriculture Entrepreneurship development & the small business sector 2.1 Strategic Implications This study has served to highlight a number of key strategic issues, and provides a basis upon which to develop the strategic interventions necessary to enhance local economic growth in the Ndlambe region. In particular, the following is noted: The region is dominated by the coastal assets, agricultural and tourism sectors; The economy is primarily a seasonal one – being influenced by both the seasonal tourism market and the seasonal agricultural market The population is largely an urban one – only 22% of the population being rural, residing mostly on private farming operations Agriculture is the key employment sector – employing some 32% of the workforce Tourism, property development and trade are the key drivers of the local economy, accounting for some 46% of the local economy Ndlambe has rich natural resources, including the agricultural produce (pineapples, chicory & livestock), the coastline. These are further enhanced by the involvement of a wide range of organisations, such as the Hospitality School (EISS), the Air School (43 Air School) and involvement of Rhodes University in the region. The Ndlambe economy is very diverse and unlike most of the rest of the Province, is not heavily reliant on the Public Sector Ndlambe LED Strategy 2009 Page 3 There are a significant number of projects already in the pipeline, at various stages of actualisation. These range in size, significance and sector, suggesting that the Ndlambe Municipality is already working towards sustainable economic development. However, for a range of reasons, the Municipality is having limited success with many of these projects Although a wide range of opportunities exist, the positive developmental outcomes are largely not being realised. In assessing the current status quo, it was noted that there are a number of key projects which are in the pipeline. In order for the Municipality ensure that the resources available are utilised responsibly and effectively towards economic growth, it is imperative that a rigorous de-bottlenecking of projects be undertaken. In this regard, it is important that those factors which are inhibiting the progress and actualisation of projects be addressed as a matter of priority. Some of the critical bottlenecks which are generic to many of the projects include: Incomplete, or non-existent feasibility studies Insufficient funding procured Resource management/co-ordination – including management, etc. land management, beneficiary The fundamental objective of this strategy, therefore, becomes to build on the work which has already been done at Ndlambe, and to direct and enhance the current resources to promote sustainable and effective economic development at the local level. Ndlambe LED Strategy 2009 Page 4 Strategic Framework Contents 3 Strategic Pillars 6 4 Strategic Enablers 10 3 Strategic Pillars 3.1 Pillar 1 – Sector Prioritisation The following criteria are useful considerations to be taken into account when deciding which sectors should be regarded as priorities for the allocation of resources: Is there a strong, positive linkage between the sector and the area’s Natural Resource Base? Does the identified sector have strong linkages with current economic activities o For example, agriculture Is there direct/indirect linkage to existing value chains? Does this sector have notable employment potential? Is there market potential for the end product, or for products at various points along the value chain, either locally or globally? Does the area currently have the necessary skills base to develop this sector, both currently and in the future? If not, is it possible to attract the necessary skills? Can we make use of State assets in the expansion of this sector? Can this sector create sustainable jobs? Would focus on this sector be supported by the principles outlined in the IDP, PGDP and NSDP? Based on the above, the following priority sectors were identified in Ndlambe: Tourism Agriculture Entrepreneurship & SMME Social Upliftment Given the wealth of projects and interventions which are already in the pipeline, the strategy must focus on giving life to the identified projects which meet the Strategic aims of the Ndlambe Municipality. Ndlambe LED Strategy 2009 Page 6 3.2 Pillar 2 – Strategic Infrastructure Development Infrastructure plays a critical role in promoting economic growth through enhancing productivity, improving competitiveness, reducing poverty, linking people and organisations through telecommunications and contributing to environmental sustainability. The importance of infrastructure in creating an enabling environment for Local Economic Development cannot be overlooked. Infrastructure delivery must be optimized in such a manner as to enhance economic development and sustainability. In particular, the following strategic infrastructure must be in place in order to develop the priority sectors as identified above: Adequate potable water to meet the demands of the local residents, the influx of holidaymakers and a certain amount of future expansion of the existing urban settlements Roads infrastructure – it is imperative that the roads infrastructure is seen as a strategic asset. The road network enhances the accessibility of the municipal area as a tourism destination, whilst also facilitating transport of goods to/from/through the area Adequate sewerage infrastructure to meet current and future demands 3.3 Pillar 3 - Business Support Initiatives In order to arrive at a situation where SMMEs are sufficiently developed to access and exploit the opportunities identified, significant resources need to be mobilised in respect to building capacity and providing ongoing support. The general purpose of SMME development and business support initiatives are depicted in the diagram below. Information dissemination to SMME’s Access to finance & financial services Facilitate skillstransfer & capacity building services Facilitate and provide infrastructure support Promote access to markets SMME-enabling environment thru’ policies & procedures Guidance to quality control, product development & marketing Facilitate communication between stakeholders & SMMEs Figure 2 – Purpose of Business Support Initiatives Ndlambe LED Strategy 2009 Page 7 Support can be offered through both training and direct services. Training programs set out to equip emerging entrepreneurs with the necessary skills to contribute to and benefit from the economy. A range of capacity building programs could be offered, usually covering the following general and specific skill sets: Writing a business plan Market intelligence Retail: Buying, Costing, Pricing, Selling Money management Stock control Financial management Business communication Budgeting Record-keeping to meet SARS and CIPRO requirements A mechanism should be introduced to provide entrepreneurial support services which would assist emerging entrepreneurs to manage and overcome the most common obstacles to economic participation. Such services could include: On-site business advice and support Supervision during the drafting of a business plan Business counselling Mentorship services 3.4 Pillar 4 - Skills Development The identification, development, management and continuation of investment all require the availability of competent personnel in the local municipality, as well as the District municipality and within communities and among private sector investors. Capacity gaps are currently most evident at the municipal level, where officials grapple with interpreting, implementing and enforcing legislation in the context of a complex set of regulatory requirements, whilst also carrying larger-thannecessary loads due to the number and type of unfilled posts. Communities too, are often disadvantaged by the complexities of the regulatory environment. They are further often unable to fully exploit the potential benefits of investment as a result of limited skills. Skills development must, therefore, address both the municipal and private sectors. It is essential that investment and skills are systematically linked with the overall direction that the municipality has identified for the economic growth of its region. 3.5 Pillar 5 – Social Upliftment Social Upliftment programmes are generally associated with Poverty Alleviation and not often with local economic development. However, the potential to make a significant impact through social upliftment projects is so great that it is deemed a pillar in the LED Strategy. Indeed, the current Ndlambe LED Strategy 2009 Page 8 levels of poverty provide an opportunity for the Municipality to lobby for increased public sector input into this region. Whilst the social upliftment projects in themselves will have a beneficial impact on the beneficiaries, there will be significant spin-offs which are likely to contribute to the development of the local economy, if the projects, programmes and policies are correctly implemented. Ndlambe LED Strategy 2009 Page 9 4 Strategic Enablers There are four strategic enablers which provide the platform for effective local economic development, these being: Robust Project Un-bottlenecking Assessment of Municipal Assets Institutional Development Strategic Relationship Building 4.1 Robust Project Un-bottlenecking As has been identified throughout this study, there are a number of seemingly good projects which have simply failed to progress for a variety of reasons. A key in unlocking the economic potential of the Ndlambe region, therefore, is in Un-bottlenecking the projects which are already in the pipeline. This would include: The consolidation of projects and the identification of the genuine developmental potential; Rigorous project and even sectoral prioritization based upon thorough cost-benefit assessments, assessments of potential and a thorough unpacking of the value chains; Identification of the spatial focus and configurations of the key projects It is not enough to simply create a wish list of projects – a thorough feasibility of each project is required, upon which the possibility of securing the necessary funding becomes far more likely. Through a detailed assessment of each project, unique bottlenecks and potential stumbling blocks will also more readily be avoided or dealt with. Through the process of developing this Strategy, Ndlambe has received in-principle offers of help in this process from ECDC, National Development Agency, and DEDEA. The municipality must enter into formal arrangements with these and other institutions in aggressively tackling the bottlenecks. 4.2 Assessment of Municipal and Public Assets The Municipal and Public Sector assets include natural (coastline, sea, rivers, land), infrastructure (including buildings) and institutional resources (including skills, people, institutional memory and networks). Whilst some preliminary assessment of the existing resources is contained in this document and other associated documents (Asset Audit, Ndlambe SDF, Cacadu Area Based Plan & Land Availability Audit), it is essential that the Municipality comes to terms with (a) what it owns and (b) how this can benefit the economy of the region. The assessment would therefore include: The identification of all the resources owned by the municipality and the LED potential which they have. This could involve some or all of the following processes – land audit, asset inventory, Participatory Appraisal of Competitive Advantage (PACA), etc Ndlambe LED Strategy 2009 Page 10 Enhancement of the work begun in this process with regards to consolidating and strengthening the institutional capacity of the municipality – this should focus on the potential of creating a Ndlambe Local Development Agency, and the associated risks and opportunities which this poses The formulation and assessment of empowerment and ownership models which would open and maximise access to the local economy and resources 4.3 Institutional Development Based on this research, through our discussions with both internal and external stakeholders, institutional capacity is a critical area of intervention. Institutional capacity speaks to two major areas: 1 LED Research and Planning 2 General LED-associated capacity (such as management, farming, etc) LED Planning requires an accurate, relevant and accessible information base. This requires good data-management so that existing information can be easily accessed for planning purposes. Our experience during the course of developing this LED Strategy suggests that the municipality has not consciously developed a LED databank which could feed into the planning. In addition, the institutional memory is weak, given the limited Knowledge Management systems, and the fact that those systems which are in place are not being utilized effectively. There are three ways of addressing this problem: Building the internal capacity of the LM to undertake focussed research in relevant areas; and/or Developing an additional “arm” of the municipality, in the form of a Development Agency, which can undertake significant LED interventions and become the primary research organ; and/or Build strategic partnerships with research institutions both in the pubic and private sector, which would provide information support to the LM. We propose a combination of all three of the above: It is strategic and imperative that the Municipality develops the capacity to undertake “actionresearch” which would ensure that lessons are drawn from the day-to-day experiences. Planning could then be based on an ongoing analysis of data. However, given the success rate to date, it is unlikely that the municipality will attract critical highlevel skills in the areas of research and general LED-associated fields. There is therefore a strong case for the establishment of a strong Development Agency, which would be a municipal owned entity, run on business principles. The experiences of many regions suggest that such an agency would Ndlambe LED Strategy 2009 Page 11 benefit Ndlambe – if the process is well managed and the Terms of Reference for the Agency are well developed. Over and above the internal arrangements, the municipality must also build alliances with institutions such as ECSECC, RuLiv, NMMU, Rhodes University, GCIS, CSIR, etc. as these organisations already have existing databanks of information relevant to the mandate of the local municipality. Key information and research areas should focus on the priority sectors, in order to develop a full and clear picture of the potential and constraints of each sector. For example, a clear picture of the make-up of the commercial agricultural sector may point to opportunities for the future purchase of farms. Information management is also a key intervention which will enable the municipality to make use of resources which are already in existence. With regards to General Capacity, the Ndlambe Municipality is in the fortunate position that a number of seasoned professionals have chosen to retire to the area. It is therefore a resource which is waiting to be maximized on, as many retirees would be only too willing to provide assistance to the Municipality, which will be an effective way of providing mentorship opportunities to municipal and associated staff. In addition, the development and strengthening of the voluntary sector is also a critical component as this sector can often be involved in small, yet significant LED projects which the municipality does not have the resources to be involved in, as they often require significant hand-holding. 4.4 Partnership Building Central to the ability of the Ndlambe Municipality to implement this LED Strategy is the ability to create strategic partnerships with key stakeholders. There are two types of partnerships which are identified: 1. Strategic relationship – where the LM would draw from the broader resource base of existing organisations, for purposes of augmenting the municipal capacity 2. Operational relationship – drawing operational support from third party in order to directly support the LM’s own objectives This distinction is made as the two types of relationship have different requirements in terms of accountability, types of support received, etc. 4.5 Strategic Approach Based on the above, the overall approach to local economic development should be to increase public-sector spending in the area, which in turn would be a catalyst for private-sector investment. Furthermore, the focus of public-sector spending on social infrastructure will have direct economic spin-offs. It is therefore imperative that the Ndlambe Municipality forges strong intergovernmental relationships in order to maximize the potential input into the region. Ndlambe LED Strategy 2009 Page 12 Institutional Arrangements Contents 5 Organisational Strategy 14 6 Knowledge Management Strategy 18 7 Financing Strategy 21 5 Organisational Strategy As described in the Status Quo Report, there are some critical capacity constraints in the Ndlambe Municipality, which are negatively impacting upon the Municipality’s ability to deliver adequate and appropriate support within the LED realm. In addressing these constraints, there is one question which must be asked: What is the most effective and efficient vehicle likely to be in driving, implementing and supporting Local Economic Development in Ndlambe? There are two options which must be explored: The first is the establishment of a Local Economic Development Agency (LEDA) and; the second is the up-skilling and further capacitation of the existing LED Unit within the Municipality. It is noted at the outset that these two options are not mutually exclusive – it would be quite possible, and indeed favourable, to embark upon both options simultaneously, in order to develop the strongest possible LED capacity in the region. 5.1 Towards a LEDA or LED unit In assessing the need for a LEDA or a LED Unit, there are critical issues that must be considered before such a decision can be taken: Issues Size of the municipality Considerations In which category does the municipality fall? Resource base of the municipality What is the size of the budget? Infrastructure and assets of the municipality? Human Resource capacity of the municipality? Planning capacity Size of investment that the municipality have a potential to attract? Current investments? Investment opportunities Economic sectors Viable economic sectors Population size How big is the population Mortality rate Number of skilled people Number of semi-skilled people Ability to attract and retain scarce skills Skills base Economic Planning On answering the above questions, it will become apparent that the Ndlambe Municipality may be ideally positioned to have both a LEDA and an LED Unit, as it has the resources to be an effective LED role-player. Furthermore, Ndlambe is a region which is economically diverse – in a good and bad way: it is diverse in the sense that the economy is not reliant on any one industry for its survival, but it is also diverse in the sense that there are huge disparities between the rich and the poor. As a result, the LED arm of the Municipality must have the ability to deal with grassroots initiatives, whilst also having the muscle to interact with high-level players in what is essentially a global economy. Ndlambe LED Strategy 2009 Page 14 5.2 Recommendations It is imperative that the Municipality plays a pivotal role in the LED environment, in order to ensure that the local economy is stimulated, whilst addressing the needs of both the small businesses and the larger businesses. In doing this, it is important that Ndlambe draws upon all the resources available. The recommended strategy, therefore, is threefold: 1. Strengthen existing and develop new relationships with key role-players; 2. Strengthen the existing LED Unit and build capacity; and 3. Establish a LEDA which can interact at a high level and work on large, cross-cutting projects which are likely to have a significant impact on the economic landscape of Ndlambe. 5.2.1 Strengthening of the LED units Ndlambe Municipality has recently embarked upon a process to strengthen the human resource capacity of the LED Unit – specifically through the appointment of the LED Manager. Whilst this is certainly a critical step towards the strengthening of the LED Unit, it is unlikely to be sufficient. It is also critical that the process of filling vacant positions – notably the administrative assistants – be completed as a matter of priority. It then becomes a matter of strategic intervention to provide access to the necessary training and resources to build additional capacity within the Municipality. It is unlikely that the LED Unit will be able to become a significant resource to the region without engaging with other key role-players. Therefore, in providing access to the necessary resources, it becomes imperative that the LED Unit build strong relationships with the wide variety of stakeholders who have already indicated a willingness to be of assistance – this includes (but is not limited to) the Nelson Mandela Metropolitain University, ECSECC, the local Chamber of Business, RuLiv, ECDC, and other organs of state. Additional relationships must be forged and developed, with organisations such as Rhodes University and the South Africa Association of Retired Persons, who already have a presence in the region, as well as those who could be brought into the area – such as SEDA. Such relationships will provide access to key resources in the areas of data collection and anlaysis, research, project management, project planning, financial management and much more. 5.2.2 Towards Establishing a LEDA What exactly is a LEDA? According to the IDC, a LEDA is: An entity with public interest and accountability but which uses private sector tools and strategies; A specialized entity essential to fill the gap between the crafting of development plans and the implementation thereof; A delivery tool owned by the municipality to co-ordinate and manage public resources, potential investors and regional investment opportunities in accordance with the identified development objectives; Tasked with pursuing key strategic projects, which are catalytic in nature; and Ndlambe LED Strategy 2009 Page 15 A central receptacle for funding, technical assistance and skills. The LEDA’s main objectives are to: Promote and develop economic potential on a local/regional basis by building on opportunities which recognize the unique competitive strengths of a region’s economy; Leverage public and private resources for development linked to opportunities which offer economic and spatial development potential; Manage the spatial organization of the area, in a socially efficient manner, particularly through the use of public land and targeted private projects; Develop and foster entrepreneurial potential and innovative activities which supports and drives economic growth; and Strengthen the respective areas, real and perceived environment so that they can compete effectively for capital investment necessary to develop their full economic potential. The manner in which a typical LEDA functions is illustrated in Figure 3, below: Figure 3 – A Typical LEDA Source: IDC Initial discussions have been held with IDC, with a view towards establishing a LEDA in Ndlambe. The intention is to explore the possibility of establishing a LEDA which focuses specifically on larger, Ndlambe LED Strategy 2009 Page 16 cross-cutting initiatives, which would potentially have a massive impact on the region. In doing so, and in taking advantage of the support offered by the IDC, it would be possible to create an organisation which will attract a highly skilled and motivated group of employees. In moving forward, the IDC offers three grants: a Pre-Establishment Grant, which will be utilised to undertake a rigorous assessment of the viability of the establishment of a LEDA. Once it is agreed that the establishment of a LEDA is a suitable vehicle for the Ndlambe Municipality, it will be necessary to apply for the Establishment Grant and then the Operational Grant – which is typically a 3-year grant. Ndlambe LED Strategy 2009 Page 17 6 Knowledge Management Strategy Wikipedia (www.wikipedia.com) defines Knowledge Management as: … compris(ing) a range of practices used in an organisation to identify, create, represent, distribute and enable adoption of insights and experiences. Such insights and experiences comprise knowledge, either embodied in individuals or embedded in organisational processes or practice. Within the context of the Ndlambe Municipality – specifically the LED Unit – this entails: Identifying knowledge (information, data, etc) which exists, either within the organisation or externally, as well as identifying that which is lacking and must be created for successful planning; Developing the capacity to understand, research, distribute and promote this knowledge for adoption; and Developing the capacity or relationships to create new, targeted knowledge – in the form of new statistics, new research, etc. The above must be grounded in a useful system, through which the relevant information/knowledge is made available to the municipal role-players. The aim of this section is to provide a strategy for strengthening the Knowledge Management capacity of the Ndlambe Municipality. 6.1 Developing Internal Capacity Before one can begin to address the issues of what information, data or knowledge is required, there must be a certain capacity within the institution. There must be someone who has the skills necessary to take the information presented and draw from it the relevant material and conclusions, with specific reference to the work being undertaken. From the Institutional Review we note that this capacity is largely lacking in Ndlambe. It is therefore critical that Ndlambe Municipality seeks out support from a variety of institutions to build internal capacity. This may require that an additional staff member is employed in the capacity of “researcher” or “knowledge manager”, who will be able to draw on information and knowledge from a variety of sources and package it in such a manner as to make it available to the LED officials and decision-makers. It is also possible that this function be left to the Development Agency, although we still believe that there must be some internal capacity within the LED Unit to at least make sense of the information which is all around them. Some of the partners who would be able to assist the municipality in this regard are: Development Bank of Southern Africa – for example DBSA (Vulindlela Academy) is currently collaborating with Global Insight on statistical training. Whilst these courses are being held outside the Eastern Cape, Ndlambe Municipality should prioritise such training for its staff; Ndlambe LED Strategy 2009 Page 18 RuLiv & GTZ – who have run a number of successful training events and work closely with local municipalities in capacity development Nelson Mandela Metropolitan University (NMMU) – having been involved in this project, NMMU has already committed themselves in principle to assisting the municipality with capacity building. This relationship needs to be further developed. It may also be possible to engage with Rhodes University for additional training support. 6.2 Developing Critical Partnerships There is little doubt that it is impossible for a municipality such as Ndlambe to go it alone when trying to navigate the sea of knowledge & information; and to try to do so would be a waste of resources. Rather, the intention is to build Critical Partnerships with institutions whose primary purpose lies in the fields of knowledge management and information gathering/dissemination. During the course of developing this strategy, Ndlambe has already had some very positive interactions with: ECSECC – who have agreed in principle to support the municipality with relevant information on an ongoing basis. The priority now is for the Municipality to take the lead in accepting the offer and reaping the benefits; NMMU – as discussed above, the offer in principle has been made. As an institution for higher learning, NMMU has access to significant volumes of information which they could easily package into useful tools for the municipality. RuLiv – there is an in-principle agreement that they will assist the municipality with social mobilization and the building of social capital (community focused). Other institutions, such as Rhodes University who already have a relationship with the area, should also be approached to provide support in this arena. Lastly, government institutions such as GCIS and CSIR are invaluable sources of information and relationships with these institutions should also be sought out. 6.3 Managing Information & Documents At an institutional level, our research shows that there is some organisation and management of information through the Archives Unit. However, a key point which was pointed out by the Director: Community Services is that not all data reaches the archives, and therefore not all data is made accessible to the majority of the officials who may require this data. Another institutional challenge is the manner in which the departments seem to work in silos, with little sharing of knowledge on a regular basis. Whilst the municipality does have a very effective information/document management system, this system can only be as effective as the operators. In addressing the institutional issues surrounding how information is managed, the following is highlighted: Ndlambe LED Strategy 2009 Page 19 All documents should be copied to archives as a matter of policy or directive from the Municipal Manager’s office Within the LED Unit, an electronic document repository or mini-library should be created. All documents which are not available electronically can be scanned and kept here. Ndlambe LED Strategy 2009 Page 20 7 Financing Strategy It is critical that a multi-faceted approach to funding LED is crafted. Reliance on single-source funding reinforces the undesirable situation of dependency, improper or insufficient budgetary allocations, and inability to achieve sustainability in respect of interventions. There are 4 main elements to the financing strategy. Accessing the potential resources represented by each requires significant research to ensure alignment of objectives and intent. This is only possible if the municipality is very clear as to its own policy and strategic direction. An indicative list of resources attached to each element is presented here: National Grants and Subsidies The Foundation for Research and Development Credit Guarantee Insurance Corporation Khula Regional Industrial Development Board National Economic Development and Labour Council (NEDLAC) Industrial Development Corporation (IDC) Department of Trade and Industry (dti) Department of Transport subsidy program SDIs National Housing Programme MIG Social Fund Lotto Existing and Own Revenue Local collections Traffic fines Rentals Free Basic Services Grant Equitable Share Programmatic Support Crafts and Tourism program (Department of Arts, Culture, Science and Technology) Employment and Skills Development services (Department of Labour) Community Development Funds (Department of Social Development) Land Care Program (Department of Land Affairs) Extended Public Works Programme Working for Water (Department of Water Affairs and Forestry) Ndlambe LED Strategy 2009 Page 21 Municipal Services Partnerships (dplg) National Heritage Council Dept Environment & Economic Affairs Project Consolidate (dplg) Private Sector and Donor Funding Loan financing International donor community, especially DANAID, USAID, EU, UN, and DFID Grants of in-kind support to community organisations Joint Ventures Private Sector investment Agencies from which to seek Technical Support GTZ & DED – German Government support programmes Difd – British support programme USAid – American support programme Development Bank of Southern Africa AusAid – Australian support programme Sida – Swedish support programme Swiss Development Corporation Ndlambe LED Strategy 2009 Page 22 Implementation Plan Contents 8 Project Categorisation 24 9 Project Implementation Plan 26 8 Project Categorisation In moving forward, it is important to understand the nature of the projects which the municipality is involved in, as each will require a different set of skills and resources from the Municipality and other stakeholders. In certain instances, it is possible that the projects will cut across more than one category. Nonetheless, the projects can be broadly categorised as follows: Strategic Projects – these projects have an economic and social impact which is wider than Ndlambe alone. They are also projects which cut across many sectors and link into regional, national and international value chains Nodal Projects – these projects are very area specific – they seek to regenerate the local area and take advantage of the local assets and resources Social Projects – these projects are primarily low key projects whose main aim is income generation for a relatively small group of beneficiaries Nationally/Provincially Driven Projects – in some instances, projects come into being as a direct result of national or provincial imperatives, and take advantage of the resources made available by these tiers of government. 8.1 Interventions by Category Strategic Pillars Strategic Project Tourism Agriculture Entrepreneurship & SMME Social Upliftment Albany Coast Bulk Water Supply Scheme Pineapple Industry Natural Fiber Initiative- Ndlambe Natural Industrial Products (NNIP) Chicory Nodal Project Bathurst Eco-Tourism Hub Ndlambe Heritage Route Essential Oils Bio-Fuels Marine Tourism Forest Hill Farm Hospitality & Tourism Dairy Agro-Tourism Real Estate Development Sector Support Agro-Tourism Economic Revitalisation of Alexandria Social Project Ndlambe LED Strategy 2009 Piggeries / Poultry Nomzamo Business Hive Ndlambe Tourism & Cultural Village Tourism - SMME Development & Training Vegetable Gardens (Bathurst) Piggeries / Poultry Bathurst Commonage Bathurst Commonage National/Provi ncially Driven Project The above matrix outlines the different types of projects in Ndlambe. It is noted that there is very little said about the Social Upliftment sector. However, the Bathurst project and most of the agricultural sectors have a strong social upliftment component although they are essentially agricultural/nodal projects. The full project plan also outlines additional relationships which the Municipality should seek to forge and strengthen which would address the issue of Social Upliftment in a more holistic and deeper manner. Ndlambe LED Strategy 2009 9 Project Implementation Plan Project 1. Albany Coast Bulk Water Supply Scheme. Project Outcomes Addressing the major water problem (limited ground water, poor water quality, high salinity in water), in the area. Providing bulk potable water. Improving economic development in the area. Improving tourism potential in the area. Creating 13 000 jobs by 2030. Project activity Tapping water from the Gariep-fish river water transfer scheme. Building a second water treatment plant at the James Kleynhans Water treatment Works. Cost R880 Million, funding to come from a government grant, and Absa DevCo. Next steps and timeframes Ndlambe LED Strategy 2009 This project has been put on ice. The main reason for this is that they are waiting for the confirmation and allocation of the R400 million government grant. Private sector funding has been secured. Those initially opposed to the project seem to have reached agreement on project benefits for the area A high level meeting with relevant government departments (DWAF, DPLG, DLGTA) and other role-players (DBSA) needs to happen to secure public sector funding for the project Institutional driver ABSA’s development company – Absa DevCo Bigen Africa – a multidisciplinary Company specializing in engineering and management consulting. Ndlambe Municipality. Local and National Government. Page 26 Project 2. Pineapple Beneficiation Project Project Outcomes Revitalizing the Pineapple Industry in the province. Growing the agroprocessing sector in the Eastern Cape. Securing approximately 1 500 jobs, and creating an additional 1500 new jobs. Innovation with green energy and technology Black economic empowerment Facilitating black commercial pineapple farming and land redistribution. Project activity Ndlambe LED Strategy 2009 Relocating Summerpride Pineapples from East London to Bathurst. Securing of lease and re-zoning of Mount Pleasant Farm in Bathurst. Establishing the agriprocessing operation, that will focus on juicing and fibrous byproducts. Generating electricity, steam, and organic fertilizer through an anaerobic digestor. Establishing a black empowerment trust that will have a 26% equity stake in NNIP. Establishing a black commercial pineapple farming industry, integrated into an active land redistribution programme. Cost This 5 year project is estimated to cost R500 million, which includes the development of the Bathurst plant at an estimated cost of R260 Million. Some funding has been secured but significant additional funding is required. Next steps and timeframes The first phase - PGA purchasing Summerpride Pineapples has been completed in 2008. The next phase is the relocation of the factory from East London to Bathurst. For the next 6 months the PGA is busy with the feasibility study and securing of the funding for the project (building and establishing of the agri-processing operation). The PGA is negotiating with the IDC, the DBSA, the Doa and private equities. Securing of 50 year proposed lease agreement from the Ndlambe Municipality. Rezoning the property – Mount Pleasant farm. Institutional driver Pineapple growers Association (PGA). ECDC CSIR Ndlambe Muncicipality DoA DBSA IDC Page 27 Project 3. Chicory Project Outcomes Ndlambe LED Strategy 2009 Reviving the Eastern Cape Chicory Industry. Scaling-up chicory production Capitalizing on the health benefits of chicory. Developing and empowering black emerging farmers, linked to land redistribution Making the most of the market that Chicory SA can provide. Making use of the technical assistance that Chicory SA are willing to provide. Project activity Initiating two chicory farming projects on the Municipal owned farms, Brakfontein, and Forest Hill farm. Possibly scaling up black chicory production linked to active land redistribution Cost The Department of Social Development has allocated R500 000 for the Forest Hill farm project. The Ndlambe Municipality has submitted a proposal for R800 000 for the Brakfontein chicory project (with NDA). Next steps and timeframes Both projects are up and running. To date farmers have been working the land, preparing the soil and fencing. Planting is due to start in April this year. Follow-up with NDA and other funders needs to be made to accelerate implementation of Brakfontein project. Institutional driver Ndlambe Municipality Chicory SA Department of Social Development NDA Page 28 Project 4. Essential Oils Project Outcomes Ndlambe LED Strategy 2009 Utilizing the Eastern Cape’s natural suitability towards cultivating essential oils. Empowering the elderly in the community. Establish sustainable black commercial farmers, integrated into essential oils value chain Realize competitive advantage of area for essential oil production Project activity Essential oil project on Mill Farm. Cultivate geranium, lemon balm, camomile and lavender. Negotiate with Forest Hill farm for distillation, Acquire more commercial agricultural land for land redistribution linked to essential oils production Cost Project has received R500 000 funding from DEDEA. Next steps and timeframes The first phase of the project has been completed. This phase focused on water and electricity provision to the farm. The project is ready for soil preparation and planting. In the process of negotiating a service agreement with the owner of Hill Side farm for the distillation process. Needs more active linkages to other small essential oils projects to realize economies of scale and product quality to secure markets access (linked to clusters) Institutional driver Ndlambe Municipality DEDEA ECDC CSIR DoA Page 29 Project 5. Bathurst Project Project Outcomes Unlock the dormant potential of the Bathurst. Commonage. Protect the commonage’s environmental and ecological heritage. Create tourism and economic development opportunities for the benefit of the disadvantaged Bathurst community opportunities. Project activity Ndlambe LED Strategy 2009 Implement the Bathurst Community Conservancy Project, in partnership with the SA Biodiversity Institute. Develop ecologically sustainable and viable development projects such as a Craft and Tourism Hub, Medicinal plant nursery, Nguni cattle farming project, Aloe sap project, pineapple growing project (Linked to NNIP) among others Consolidate existing projects on commonage such as the raft learnership program, and the Masipatisane Community Garden Project. Cost An amount of R208 000 has been allocated by the SA Botanical Institute (which produced the feasibility study and project identification). Individual projects need to be properly packaged and costed as a basis to leverage funding Next steps and timeframes The potential projects proposed in the 2006 feasibility study need to be packaged into bankable business plans to leverage necessary (public sector and private) funding and technical support. Institutional driver Ndlambe Municipality SA Botanical Institute Bathurst Commons Sustainable Land Use Project SA Biodiversity Institute RULIV Rhodes UniversityEnvironmental education unit, DEAET Dept Social Development NDA Eastern Cape Parks Board IDC ECDC Page 30 Project 6. Forest Hill Farm Project Outcomes Developing sustainable black commercial farmers linked to active land reform and mixed land use production (chicory, maize, pineapple, soya and livestock) Project activity Ndlambe LED Strategy 2009 The farm is currently being used for Beef Cattle farming – grazing and dipping. The Ethemba Trust Chicory Project has received funding from the Land Bank and off-take agreements have been secured. The second chicory project has R500 000 secured from the Department of Social Development and is due to be launched. A soya bean project linked to biofuel production is about to be launched (see below). Cost Both chicory projects have received funding. Funding for bio-fuel and pineapple projects should be relatively easy to secure given that market off-take is guaranteed Next steps and timeframes Bankable business plans need to be developed to secure funding for the pineapple and bio-fuel projects (within 6 months); The livestock project needs to be more actively linked into an Nguni Livestock value chain project for the broader area (for stock improvement, product development, marketing etc) Institutional driver Ndlambe Municipality Department of Social Development Landbank Chicory SA Fort Hare University – Nguni program DoA PGA (Pineapple Growers Association. Page 31 Project 7. Biofuel project Project Outcomes Mass production of raw soya beans linked to biofuel production in Coega IDZ. Creating 200 permanent jobs. Development and growth opportunities for emerging farmers. Empowering women and youth. Project activity Ndlambe LED Strategy 2009 This project is set to be rolled out in Bathurst at Mill Farm, Forest Hill farm and Brakfontein farm (near Alexandria). This project involves the mass production of raw soya beans. A Coega based Biofuel company has agreed to buying the raw soya beans from emerging farmers. Setting up a section 21 company to manage and facilitate this project. Special focus on employing women and youth. Cost The budget to set up this project is R1.5 Million rand. Funding is currently being sourced for the project. Next steps and timeframes The project is currently in its first phase the concept development phase. This phase is estimated to take approximately one year. The project is set to kick of in March 2010. First crop should is set to be harvested at the end of 2010. Bankable business plan is being developed for fund-raising (3 months) Institutional driver Ndlambe Municipality Coega IDZ DoA IDC ECDC Dept Social Dev NDA Land Bank Page 32 Project 8. Poultry, Piggery and Dairy Projects Project Outcomes Setting up poultry, piggery and dairy projects. Creating opportunities for emerging black farmers. Project activity Ndlambe LED Strategy 2009 Ndlambe municipality is planning to set up a poultry project on Brakfontein farm with 8 beneficiaries, The Ndlambe Municipality is planning to set up a dairy farming project on the Kruisfontein farm in Alexandria. The Ndlambe Municipality is planning to set up a piggery project in Alexandria. Cost It is estimated that approximately R500 000 per project is needed to set up each of these projects. Next steps and timeframes These projects are all in the early planning stages. The Ndlambe Municipality is in the process of sourcing funding for these projects. The Department of social Development has already committed some funding towards the poultry project. Institutional driver Ndlambe Municipality Department of Social Development ECDC DoA Rhodes University NDA Page 33 Project 9. SMME - Business hives Project Outcomes Establishing a viable SMME business hive in Port Alfred Increasing the development potential of emerging small businesses. Project activity Ndlambe LED Strategy 2009 The Nomzamo business Hive was established in 2001, on the 43 Air School premises. Most of the original businesses closed, and one of the main reasons for this is the location (too far from the main road and CBD), as well as inappropriate product choices, and uncompetitive business practices. The Ndlambe Municipality plans to move the hive to a better, bigger venue, closer to the markets. The new venue is a Municipal owned venue in the Port Alfred. Township Cost The Nomzamo Business hive was established in 2001 and was funded by the National LED fund (1,3 Mil). The move and setting up some additional business support will cost approximately R1,5 million Next steps and timeframes The business hive is planned to move to its new premises by October 2009. Institutional driver Ndlambe Municipality ECDC SEDA Page 34 Project 10. Ndlambe Tourism and Cultural Village Project Outcomes Establishing a Tourism and Cultural village on the R72 on the Bushmans River. Providing a one-stopshop which will provide a market outlet for traditional arts and crafts and tourism products. Project activity Ndlambe LED Strategy 2009 The project was conceptualized in 2005 by the Ndlambe Municipality. The project proposed the development of a Ndlambe cultural and tourism village. The Tourism and Cultural village will be situated on the R72 on the Bushmansriver. The Tourism and cultural village is proposed to have and art and craft shop, a conference centre, tourism information and booking office, work spaces where traditional artists and crafters can work and restaurants. Cost The project has been allocated a budget of R5 million by DEAT. Next steps and timeframes The project is in the planning phase. The implementing agent is working on the business plan. Land still needs to be re-zoned. The aim is to have the venue open to the public before the 2010 soccer World Cup. Institutional driver Ndlambe Municipality DEAT ECDC ECTB DSRAC Page 35 Project 11. Tourism SMME Development – training. Project Outcomes Address the narrow skills base. Skills development Training programs in the tourism and hospitality industry Project activity Ndlambe LED Strategy 2009 This training project started in 2008, and is a joint venture with the Ndlambe Municipality and the Eastern Cape tourism Board and TEP. The training program includes business administration and tourism training, communications and tourism, web site planning, and SA host training (an internationally accredited program). Cost This project has an annual budget of approximately R250 000, which has been paid by TEP. The Ndlambe Municipality has been providing the trainees accommodation. Next steps and timeframes They are currently working together with Fair Trade Tourism South Africa (FTTSA) on planning the next training program. The next training program will include training on sustainable tourism development, B +B establishment training, tourism awareness campaigns, tour guide training, and eco tourism and its benefits. Institutional driver Tourism SETA Ndlambe Municipality ECTB TEP (Tourism Enterprises Program) FTTSA (Fair Trade Tourism south Africa) Dept of Labour Page 36 Project 12. Ndlambe Heritage Route Project Outcomes Develop and package a Ndlambe heritage route. Honoring and showcasing our natural and cultural heritage. Project activity Ndlambe LED Strategy 2009 This project was initiated in 2007. The project entails identifying all the heritage sites in the area, and developing, designing and packaging Ndlambe Heritage route. This project is a joint venture between, the Ndlambe Municipality and Rhodes University and the National Heritage Council. Cost The National Heritage Council has earmarked R200 000 to fund this project, but has only provided R50 000. The additional funding needs to be secured to facilitate implementation Next steps and timeframes The project is still in the research phase (Rhodes University is doing research on all the sites). Funding bottlenecks with the NHC need to be addressed urgently The heritage route needs to be up and running by 2010. Institutional driver Ndlambe Municipality Rhodes University National Heritage Council (NHC) DSRAC ECTB Page 37 Project 13. Marine Tourism Project Project Outcomes Developing a range of tourism activities alongside the Kowie River. Skills development, especially local youth in aquatic activities. Project activity Ndlambe LED Strategy 2009 This project is a joint project between the Ndlambe Municipality and the Rhodes’s University Fishery Department. This project proposes Canoe hiring, bird watching, cultural tours, fishing excursions, hiking and horse trails, and establishing a skills development centre. This project needs to link with the SMME Tourism Training project mentioned above. Cost The project still requires to be properly packaged and costed Next steps and timeframes This project is in its initial phase, and to date Rhodes University has prepared a concept document which was presented to ECDC at the end of 2008. Business plans require to be developed to acquire funding Institutional driver Ndlambe Municipality Rhodes University ECDC ECTB Page 38 Project 14. Hospitality and Tourism Project Project Outcomes Developing township tourism opportunities. Project activity Ndlambe LED Strategy 2009 This project is based on the concept of the successful Kwam e Makana hospitality project (which resulted in 40 bed and breakfasts in Rini township linked to township tours). Ndlambe Municipality is aiming to establish a similar project, working with those beneficiaries who have already received previous tourism and hospitality training through the municipality. The project will mobilize funding for B&B owners, and provide business and quality assurance support to these SMME’s Cost It is estimated that an amount of approximately R920 000 will be needed to get this project of the ground. The Ndlambe Municipality has approached the EU for possible funding. Next steps and timeframes The project is in its initial planning phase. The Ndlambe Municipality has already approached the Dutch Hospitality school EISS for training support the project. Institutional driver Ndlambe Municipality ECTB ECDC EISS DSRAC EU Dept of labour DEDEA Page 39 Project 15. Economic Revitalization of Alexandria Project Outcomes The economic revitalization of Alexandria and surrounds Project activity Ndlambe LED Strategy 2009 Alexandria and its immediate surrounds show high economic potential. Ndlambe Municipality has indicated its intention to revitalize the area. Focus should be on developing agriculture through the establishment of an agricultural development zone. This project will involve the revamping of all the existing infrastructure in the area Cost Costs are still being calculated Next steps and timeframes This project is in its concept phase. The Ndlambe Municipality has developed a project framework. They are now looking at developing the business plan/feasibility study. Institutional driver Ndlambe Municipality ECDC Dept. of Agriculture Chicory SA. PGA Page 40
© Copyright 2026 Paperzz