Application of Space Technology in Rural Road Projects under PMGSY Centre on GeoInformatics Applications in Rural Development National Institute of Rural Development & Panchayati Raj Use of Satellite Imageries for Planning and Execution of PMGSY Roads A proof of Concept under PMGSY was undertaken By the Ministry in Mehboobnagar District, Telangana by NRSC & NIRD, Hyderabad Ministry Entered into an MOU with CGARD on 16-12-2015 for using the Application of Space technology for following Activities: a. Check the feasibility of the proposed alignment for its cost effectiveness and other Geomorphological Constraints b. Check the progress reported by the States(OMMAS) 1. Road Alignment i.e. Habitations Covered 2. Reported Physical Progress of Construction Study Objectives: • Check the progress reported by the States (manual or OMMAS) with respect to; Reported alignment, i.e. Habitations covered. • To facilitate real-time monitoring of PMGSY Roads using satellite imageries and bring a comparative statement showing deviations, if any. • To assess the Physical Progress of the Roads using the Satellite imageries by CGARD, NIRD&PR. • To mark the Culverts and Causeways from the Imagery and crosscheck with the DPR Assam Rajasthan Chhattisgarh Telangana Rajasthan Chhattisgarh Orissa Telangana Assam Orissa Methodology Based on the information given by the State government officials the alignment of Road is Captured. Satellite data was procured based on the GPS coordinates of the road. The image analysis is done based on the Images of Cartosat data procured from NRSC ,Komsat data and other high resolution satellite data . The length of the road under BT and CC portion is calculated from the imageries and compared with the OMMAS data of the respective road. The width of the road is calculated from the imagery using the image processing software and the numbers of culverts constructed were captured from the imagery along with the length. Methodology Data Sets Used • Geo-Referencing • Cartosat I Satellite Imagery • Subsetting Study Area • Komsat Satellite Imagery • Image Enhancement • High Resolution images • Image Analysis using GIS • GPS • Change Detection • Open source GIS and Image Processing software's Conclusions based on Satellite Image Analysis: Based on the satellite image analysis of the roads in fives states covering 10 districts, the following findings were drawn: A total of 243 roads were taken up for the study out of which 124 roads are analyzed based on the availability of satellite data. The Procurement of satellite data for remaining roads is in process. Roads Details of Five States State District No. of Roads Completed Ongoing Kamrup 29 28 1 Darrang 32 32 0 Jaipur 10 In progress In progress Alwar 30 28 2 Korba 32 28 4 Raigarh 37 33 4 Karimnagar 15 9 6 Nalgonda 27 15 12 Nayagarh 20 20 0 Puri 11 1 10 Assam Rajasthan Chhattisgargh Telanagna Odisha List of roads having variations as per Study Analysis State Assam Rajasthan Chhattisgargh Telanagna Odisha Total Variation in Variation in Road length Habitation Variation in CC Road length Variatio n in BT Road length District No. of Roads Kamrup 20 2 2 0 2 Darrang 28 4 5 0 3 Jaipur In progress - - - - Alwar 20 13 5 5 7 Korba 8 5 3 2 6 Raigarh 22 4 3 4 6 Karimnagar 6 1 1 - - Nalgonda 6 1 1 - - Nayagarh 13 8 2 4 3 Puri 1 1 0 - - 10 124 39 22 15 27 From the above table, it may be seen that out of 124 road woks (all completed), variations in (i) length reported in 39 roads (31%), (ii) habitation connectivity in 22 road (18%), (iii) CC road length in 15 cases (12.1%). Proof of Concept in Alwar District Rajasthan Name of Road: Toolera to Ahir Bas Name of Block : Umrain Habitations Covered: Ahir Bas, Bhuru Bas, Bhopat ka bas, Chander yadav bas Year of Sanction: 2013 Road Length sanctioned: 1.60 Kms Sactioned Cost: 41.21 Lacs Actual Alignment of Road Network A Concrete Cement Road as shown B Black top road as seen from the image Satellite Image (June 2014). C B B Black top road is from B to C during June 2014 Non-Black top road is from B to C during May 2013 C C A Concrete Cement road is from A to B during June 2014. A B Non- CC road is from A to B During May 2013. State Govt. vs NIRD Toolera to Ahir Bas OMMAS Habitation connected Road length completed in Kms 1 Toolera NIRD & PR 1 Toolera 2 Ahir Bas 2 Ahir Bas 1.60 0.86 BT Road- 1.23 CC Road- 0.37 BT Road- 0.52 CC Road- 0.34 Against OMMAS report of 1.60 Km, the NIRD & PR analysis showed (0.21+0.44+0.13+0.08) 0.86 Kms Proof of Concept in Nayagarh District Odisha Name of Road: MDR-76 To Basudia Name of Division : Ranapur Sub Division Habitations Covered: Ranapur, lakopada, Basudia Year of Sanction: 2014 Road Length sanctioned: 5.50 Kms Sanctioned Cost: 304.570 Lacs Actual Alignment of Road Network with Culverts Ranapur 1 2 Satellite Image of February 2015 1m 1m BT Road 3 8m CC Road 4 2m Basudia D C D Black top road is from C to D during Feb 2015 Concrete Cement road is from D to E during Feb 2015. D C D Non-Black top road is from C to D during March 2014 Non-CC road is from D to E during March 2014. E E Temporal Changes in Cross Drainage & BT Road Observed by Satellite Imagery 3 3 8m Cross Drainage & CC Road Observed in February 2015 No Cross Drainage & Earthen Road Observed in March 2014 State Govt. vs NIRD MDR- 76 to Basudia Habitation connected OMMAS NIRD & PR 1 MDR-76 1 MDR- 76 2 Basudia Road length completed in Kms 2 Basudia 5.20 3.74 BT Road- 3.00 CC Road- 2.20 BT Road- 2.57* CC Road- 1.17 Against OMMAS report of 5.20 Km, the NIRD & PR analysis showed (0.64+0.16+1.93+1.01) 3.74 Kms * BT and CC Road Include Culvert With length of 1m, 1m, 8m & 2m. Proof of Concept in Korba District Chhattisgarh Name of Road: T – 03 to Ghotmar Name of Block : Korba Habitations Covered: Ghotmar Year of Sanction: 2012-13 Road Length sanctioned: 2.7 Kms Sactioned Cost: 158.88 Lacs Alignment of Road Network with Culvert 15 m BT Road Satellite Imagery of November 2015 Black top road is from A to B during November 2015 A Non-Black top road is from A to B during November 2013 B B 15 m Cross Drainage & BT Road Observed in Nov 2015 No Cross Drainage & Earthen Road Observed in Nov 2013 A State Govt. vs NIRD T- 03 to Ghotmar OMMAS Habitation connected Road length completed in Kms 1 T - 03 NIRD & PR 1 T - 03 2 Ghotmar 2 Ghotmar 2.7 1.93 BT Road- 2.7 CC Road- 0.00 BT Road- 1.93* CC Road- 0.00 Against OMMAS report of 2.7 Km, the NIRD & PR analysis showed (1.93) 1.93 Kms * BT Road include one culvert with length of 15m. Proof of Concept in Darrang District Assam Name of Road: Nadrikash to Mowamari Name of Block : Dalgaon Sialmari Habitations Covered: No.1 Puniagaon, Ghenamari Thekerabari Year of Sanction: 2008-09 Road Length sanctioned: 8.231 Kms Sactioned Cost: 406.63 Lacs Actual Alignment of Road Network (C) Puniagaon Satellite Image November 2015 (b) Ghenamari BT Road (a) Thekerabari A Black top road is from A to B during November 2015 B A Non-Black top road is from A to B during December 2010 B State Govt. vs NIRD Nadrikash to Mowamari Habitation connected Road length completed in Kms OMMAS NIRD & PR 1 Nadrikash 1 Nadrikash 2 Mowamari 2 Mowamari 8.231 8.05 BT Road- 8.231 CC Road- 0.00 BT Road- 8.05 CC Road- 0.00 Against OMMAS report of 8.231 Km, the NIRD & PR analysis showed 8.05 Kms. Proof of Concept in Nalgonda District Telangana Name of Road: MRL29-Pulimamidi to Marepally via K.K.Kalvuva: Name of Division : Anumula Habitations Covered: Marepally,Kummarikunta Year of Sanction: 2014 Road Length sanctioned: 4.08 km. Sanctioned Cost: 215.36 Lakhs. Actual Alignment of Road Network with Culverts 4m 4m 1 2 1m CC Road 1m 4m BT Road Other Road 4m 3 8m 4 2m Satellite Imagery Feb 2015 4m B B C B C Black top road is from B to C during February 2016 Non Black top road is from B to C during January 2014 A A B B Non CC road seen from A to B during April 2011 CC road as seen from A to B during March 2016 Temporal Changes in Cross Drainage & BT Road Observed by Satellite Imagery 3 3 8m Cross Drainage & BT Road Observed in February 2016 No Cross Drainage & Earthen Road Observed in State Govt. vs NIRD MRL29-Pulimamidi to Marepally via K.K.Kalvuva OMMAS Habitation connected 1 MRL29-Pulimamidi to Marepally via K.K.Kalvuva 2 Marepally, Kummarikunta Road length completed in Kms NIRD & PR 1 MRL29-Pulimamidi to Marepally via K.K.Kalvuva Marepally,Kummarikunta 4.08 4.08 BT Road- 0.00 CC Road- 0.00 BT Road- 3.09* CC Road- 0.99 Against OMMAS report of 4.08 Km, the NIRD & PR analysis showed (3.09+0.99) 4.08 Kms THANK YOU
© Copyright 2026 Paperzz