Public Consultation on Enfield’s Transport Strategy www.enfield.gov.uk 02 Public Consultation on Enfield’s Transport Strategy 01 Enfield’s Transport Strategy This document summarises Enfield’s Transport Strategy, which assesses the challenges we face and how we propose to address them with specific goals and actions. The Transport Strategy has been developed to help deliver the Council’s fundamental commitments: Fairness for all Understanding our community’s needs and serving the whole borough fairly while targeting services at those that need them most; Growth and sustainability Building a strong future for our residents, environment and economy with a ‘can do’ attitude and support for businesses and the voluntary sector; Strong communities Listening to local people, giving them more opportunities to get involved in decision making – we will be strong community leaders in championing the needs of Enfield. All London boroughs are legally required to produce a Local Implementation Plan (LIP), showing how they intend to implement the Mayor of London’s Transport Strategy (MTS) at the local level. Enfield’s next LIP will include specific transport proposals that will be implemented in the three year period from April 2011 to March 2014, and will also include a vision for the development of transport in the borough in the longer-term. The core of the Transport Strategy is Enfield’s next Local Implementation Plan (LIP), which sets out how the Council proposes to help implement the Mayor of London’s Transport Strategy (MTS) within Enfield. The LIP also details where money for transport improvements comes from, and how we propose to spend it. The latest MTS was published in May 2010, and the Mayor of London has set five overarching goals which all boroughs are required to pursue through the LIP: • Supporting economic development and population growth; With limited funds available it is now more important than ever to ensure that every pound is used effectively. I believe that the package of measures summarised in this document provides value for money, is well balanced and will help meet the transport needs of the borough in the coming years. However, this consultation gives you the opportunity to let me know what you think, so please either fill out the form at the back of this leaflet or complete the on-line form at www.enfield.gov.uk/transportstrategy by 21st April 2011. • Enhancing quality of life; • Improving safety and security; • Improving transport opportunities for all; • Reducing transport’s contribution to climate change, and improving its resilience. Cabinet member for Environment, Street Scene and Parks Contents 3 How are transport improvements funded? 4 Strategy be implemented? chance to comment 14 6 The goals of Enfield’s Transport Strategy How will the money be spent? Local transport improvements 7 5 How will the Transport Measuring our performance 12 Enfield’s Transport Strategy is designed to satisfy the requirements of the Mayor and to best meet local needs in the context of a growing population – an additional 18,700 people are expected to be living in the borough by 2026. There is a particular emphasis in the Transport Strategy on linking transport with the Council’s wider agenda for the economy and regeneration, education, employment, health, equality and social exclusion, crime and the environment. Enfield’s Transport Strategy is designed to satisfy the requirements of the Mayor of London and to best meet local needs in the context of a growing population Councillor Chris Bond Enfield’s Transport Strategy 1 The need for a Transport Strategy 2 The need for a Transport Strategy Your Public Consultation on Enfield’s Transport Strategy 03 The goals of Enfield’s Transport Strategy 04 How are transport improvements funded? The overall goals of Enfield’s Transport Strategy are the same as those of the MTS, summarised in the previous section. Within the context of these overall goals, a number of specific local transport aims will be addressed by programmes included in the Transport Strategy. Over the next three years, Enfield plans to spend £52.2m on improving transport in the borough. Of this money, 30% (£15.7m) is expected to be provided by Transport for London (TfL) through the borough’s LIP process. These aims are as follows: The remainder is funded directly by the Council and contributions from developers and other third parties, as indicated in the graph below. • Creating a transport network that is accessible and safe for all; • Encouraging the use of sustainable modes of transport to reduce congestion and parking stress, and responding to the local causes and impacts of climate change; • Smoothing traffic flows and providing good access to the strategic road network while protecting the amenity of residential neighbourhoods; • Improving the street scene and access to green and open areas; • Improving poor bus links between strategic growth areas and town centres; • Supporting proposed improvements to the West Anglia Mainline in the Lee Valley; • Providing good quality orbital public transport links to improve access to jobs and services, and better access to public transport in the east of Enfield; • Enhancing the environment and improving links to the Upper Lee Valley to support growth. Developer contributions and third-party sources (£2.3m) LIP allocation expected from TfL (£15.7m) Council capital / revenue funding (£34.2m) The overall goals of Enfield’s Transport Strategy are the same as those of the Mayor of London, and specific local transport aims will be addressed Public Consultation on Enfield’s Transport Strategy 05 How will the money be spent? Money received from TfL for Enfield’s LIP is divided into three broad categories, and the graph below indicates how the Council plans to supplement this allocation with its own resources and third party contributions. 35.0 Unlike the other categories, TfL funding for Major Schemes is allocated to boroughs based on a bidding process, applying to a fund of £80m available across London over the next three years. Although the Council has bid for a total of £14.8m of Major Scheme funding during this period, it is unlikely that all of the projects will be funded. 30.0 2.3 20.0 15.0 Maintenance Major Schemes Road and bridge maintenance priorities are identified following detailed technical engineering assessments and there is little flexibility in where the Council spends this money. Each Major Scheme costs over £1m, and generally aims to provide a range of integrated improvements on an area-wide basis. In addition, the Council plan to resurface some 20km of carriageway and 4km of footways per year on the local road network. 29.7 10.0 1.2 4.3 0.5 1.1 9.0 4.0 0.0 Using the available funding over the next three years, we are proposing practical programmes to meet the goals of Enfield’s Transport Strategy summarised in Section 3. The main priorities for maintenance of the main road network in Enfield include schemes of carriageway resurfacing and reconstruction on the A1010, A110 and A1055 in addition to structural maintenance of a number of bridges across the borough. 25.0 Total funding allocation for 2011/2-2013/4 (£m) Of the overall maintenance budget, £2.3m is available from TfL over the next three years specifically for busy main roads and bridges in the borough. The remaining £29.7m of funding is provided by the Council for the maintenance of all roads and footways in the borough and assumes that the £9.9m capital/ revenue programme for 2011/12 is maintained in the following two financial years as well. LIP (expected) Council Third party 06 How will the Transport Strategy be implemented? Maintenance Major Schemes Local Transport improvements (corridors, neighbourhoods and supporting measures) The Council has decided to link Major Scheme funding to planned growth and regeneration in five key areas: North East Enfield (including Ponders End and Hertford Road), Edmonton Green, Central Leeside (including Meridian Water), New Southgate and Enfield Town. The eight specific Major Schemes in the table below are planned to serve our regeneration priorities. The table indicates the schemes that have currently received TfL approval in the LIP bidding process, and those still subject to TfL approval. Major Scheme Description Towpath Road Upgrading Harbet Road/Towpath Road section of the River Lea Towpath Lytchet Way Improvements to safety, security and pedestrian access Silver Street Station Accessibility and streetscape improvements Ponders End Improved access to Southbury Station together with public realm and operational improvements to South Street and the A1010 Hertford Road Edmonton Green New public realm for the A1010 Fore Street Hertford Road, EN3 New Southgate Meridian Water Improving access, streetscape and movement along the A1010 Hertford Road New public space outside Arnos Grove Station, and streetscape improvements around New Southgate Station New transport hub at Angel Road Station, Conduit Lane Funding status Fully funded (2011/12) Bids subject to TfL approval (2012/13 and 2013/14) Public Consultation on Enfield’s Transport Strategy 07 Local transport improvements This section summarises the key priorities for local transport improvements in the borough: Safety Cycling Safety and security are major concerns of people everywhere, and Enfield Council is determined to ensure that the transport network in the borough is as safe as it possibly can be. In particular, the Council is committed to reducing death and serious injury on its roads; reducing collisions involving vulnerable road users such as pedestrians, cyclists, and motorcycle/moped-users; and reducing the number of collisions involving children. We are also committed to improving security to ensure that people feel safe when using the transport network. The cycle network in Enfield is planned to provide safe and attractive routes linking residential areas and key destinations, but infrastructure and facilities need to be improved in a number of locations. The Council would like to encourage cycling in the borough, particularly for trips of 5km or less. The Council plans to spend approximately £2.2m on improving cycling over the next three years, and we believe that the main priorities are: The Council plans to spend approximately £4.0m on improving safety and security over the next three years, and we believe that the main priorities are: • To improve road safety around schools through a range of engineering measures (including 20mph zones); • To improve road safety on key corridors (A105 and A1010) and at key junctions with a high collision record through a range of engineering measures; • To undertake education, training and publicity programmes on road safety. • To provide a network of ‘Greenway’ cycle and walking routes using parks, open spaces, quiet traffic routes, and 20mph zones; • To increase the provision of cycle routes and cycle parking generally; • To improve cycle routes to schools; • To work with the NHS to promote the health benefits of cycling; • To work with the Lee Valley Regional Park Authority to improve cycle facilities and infrastructure. Walking Almost all journeys involve walking in a local neighbourhood or town centre. Although some areas in Enfield, particularly in the northwest, are very pleasant to walk in, others are difficult to navigate on foot. In the east, the Lee Valley rail line, strategic north-south roads and the A406 North Circular Road act as significant barriers making the Lee Valley Regional Park relatively inaccessible by foot. On top of the funding set aside for maintenance of footways, the Council plans to spend approximately £600,000 on improving walking over the next three years, and we believe that the main priorities are: • To improve the public realm around stations and borough ‘gateways’; • To improve the provision of maps and information, lighting, and disabled access on the pedestrian network generally; • To improve the condition of footways and footpaths, reduce street clutter and improve the public realm; • To work with the NHS to promote the health benefits of walking; • To work with the Lee Valley Regional Park Authority to improve pedestrian facilities and infrastructure. Public Consultation on Enfield’s Transport Strategy Keeping Traffic Moving Traffic congestion in Enfield is a growing problem and the A406 North Circular is particularly congested between Bounds Green and Green Lanes. Traffic congestion causes poor air quality, noise pollution, rat running and safety issues for other road users. Enfield Council does not manage some of busiest roads in the borough (such as the A406 North Circular and the A10, which are managed by TfL, or the M25, which is managed by the Highways Agency). However, the Council can lobby or campaign for improvements to be provided by these organisations. Environment Buses The Council plans to spend approximately £750,000 on improving traffic flow in Enfield over the next three years, and we believe that the main priorities are: The Council is aware of the importance of improving the local environment in the borough and mitigating for the impacts of noise, air pollution, and climate change. • To smooth traffic flow through the adjustment of traffic signal timings and the introduction of traffic signal efficiency technology; The Council plans to spend approximately £330,000 on improving the environment over the next three years, and we believe that the main priorities are: Poor bus links between strategic growth areas and town centres in Enfield is a significant problem, while bus priority needs to be improved generally to speed up journeys and make buses more reliable. • To co-ordinate street works to reduce delays and disruption; • To introduce and enforce proportionate waiting and loading restrictions; • To work with TfL to improve strategic roads, particularly the A406 North Circular; • To improve key junctions on the A1055 and other strategic routes; • To assess the road network in Central Leeside and the rest of the Upper Lee Valley. Parking The supply of parking in the borough, especially on-street kerb-side space, is under growing pressure with increasing car ownership. The Council plans to spend approximately £1.1m on improving parking over the next three years, and we believe that the main priorities are: • To manage parking better to reduce congestion; improve safety; and ensure a turnover of spaces to help maintain the viability of town centres; • To review existing Controlled Parking Zones on a regular basis and to consult with residents on the introduction of new Controlled Parking Zones in areas with high levels of parking stress; • To prioritise enforcement to achieve our parking management aims. • To introduce electric vehicle charging points in key locations; • To monitor air quality in 12 strategic locations and implement mitigating measures if necessary; • To plant trees along streets to improve the urban environment; • To produce Action Plans for noisy roads, as per the European Noise Directive. Enfield Council does not provide or operate bus services in the borough, which are the responsibility of TfL. However, the Council can lobby and campaign for improvements in bus services to be provided by TfL. The Council plans to spend approximately £550,000 on complementary measures to improve bus services over the next three years, and we believe that the main priorities are: • To improve bus reliability and journey times with new bus priority measures, particularly on routes 121, 191, 259, 279 and 341; • To lobby for new services in areas with poor public transport; • To improve the accessibility of bus stops, particularly for the disabled; • To plan for new services in Central Leeside and the rest of the Upper Lee Valley to support future growth. 10 Public Consultation on Enfield’s Transport Strategy 08 Smarter Travel There is a relatively high level of private car use in Enfield compared with other London boroughs (nearly 50% of residents travel to work by car, compared to an average of 36% across London). Increasing car ownership is resulting in growing levels of traffic congestion and pressure on available parking space. 11 As a result, the Council believe that it is important to raise awareness of alternative forms of transport and to promote the use of non-car modes, particularly walking and cycling. The Council plans to spend approximately £1.2m on encouraging people to walk and cycle where possible and to reduce car use over the next three years, and we believe that the main priorities are: Measuring our performance The following summarises the key priorities for local transport improvements in the borough: Rail Every borough is required by TfL to measure performance against five strategic indicators. Enfield Council are discussing the targets indicated below with TfL. Final targets will be agreed later for each of these indicators to measure local progress against the Mayor’s objectives. Enfield as a whole is relatively well served by rail and underground links to central London, although there are poorer services in the east of the borough consisting of infrequent local trains and poor quality, inaccessible stations along the Lee Valley rail corridor. Sustainable (non-car) transport Road casualties Current situation Current situation 2008: 50% of journeys to work by walking, cycling and public transport 2008: 969 casualties per year (of which 93 killed or seriously injured) Target Target 60% of journeys to work by 2026 33% reduction by 2020 Bus reliability CO2 emissions from local transport • To promote the use of lower carbon modes and eco-driving practices; Enfield Council does not provide or operate rail services in the borough. Network Rail are responsible for overground rail infrastructure (including track, signalling and stations) while services are currently provided by First Capital Connect and National Express East Anglia. London Underground is responsible for underground services and infrastructure in the borough. However, the Council can lobby or campaign for rail improvements to be provided by these organisations. • To support the expansion of car clubs and encourage their use of ultra low carbon vehicles; We believe that the main priorities for rail are to work with Network Rail, the train operating companies and other partners: • To work with businesses to promote public transport, walking, cycling and car sharing. • To achieve a minimum four train per hour service at all stations; • To provided cycle training, including free cycle training for children; • To establish “Road Rangers” in primary schools to promote road safety and sustainable travel to school; • To make all stations accessible to people with disabilities, starting with Edmonton Green station; • To improve the environment around stations and walking routes to stations. Current situation 1999/2000 to 2008/09: passenger waiting time for busiest bus services fell by 53% Target Maintain 2008 standard Current situation 2008: CO2 emissions from surface transport were estimated at 336 tonnes per year. Target 45% reduction by 2025 Condition of roads and streets Current situation 2008: 7% of the borough road network was in poor condition Target Not more than 3% in poor condition by 2025 In addition, Enfield has elected to set three additional targets: • Significantly improving journey times on four poor performing bus routes – 121, 191, 259 and 279; • Significantly increasing the proportion of accessible bus stops on borough roads; • Significantly increasing the provision of cycle training. 12 If you need this document in another language or format call Customer Services on 020 8379 1000, or email [email protected] 09 Your chance to comment We would welcome your comments on our proposed Transport Strategy. Please answer the following questions (using the space at the end of the form to tell us why you disagree with any proposals) and return this form to us at the following address: Transport Strategy Consultation, Enfield Council, Civic Centre, Silver Street, Enfield EN1 3XY. Alternatively complete the on-line form at www.enfield.gov.uk/transportstrategy. The information collected will be stored in accordance with the Data Protection Act, and all responses must be received by no later than 21st April 2011. a) Do you agree with the overall goals and local aims of Enfield’s Transport Strategy, identified in Section 3? [please tick one box only] Strongly agree Disagree Agree Strongly disagree Neither agree nor disagree Don’t know b) Do you agree with the overall balance of money allocated to each category of transport proposal in Section 7? [please tick one box only] Strongly agree Disagree Agree Strongly disagree Neither agree nor disagree Don’t know c) Do you agree with the priorities and proposals identified for improving transport in each of the following categories in Section 7? [please tick one box only in each row] Category Strongly agree Agree Neither agree nor disagree Disagree Strongly disagree Don’t know Major Schemes Safety Cycling Walking Keeping traffic moving Parking Environment Bus services Contact Enfield Council Civic Centre Silver Street Enfield EN1 3XY Tel: 020 8379 1000 www.enfield.gov.uk Rail services Smarter Travel d) Do you agree with the choice of three local performance indicators identified in Section 8? [please tick one box only] Strongly agree Disagree Agree Strongly disagree Neither agree nor disagree Don’t know 14 e) If you have any other suggestions of objectives that you think need to be included in Enfield’s Transport Strategy, or any other comments, please tell us below. f) To make sure that we are hearing from all of Enfield’s diverse communities, it is important that we ask you a few questions about yourself. If you do not wish to answer these questions, that is fine. All personal information is confidential and will only be used in relation to this consultation. Please indicate your ethnic origin below: A - White Please indicate your gender and age below: C – Asian or Asian British Gender: British Indian Female Irish Pakistani Male Greek Bangladeshi Transgender Greek Cypriot Sri Lankan Prefer not to say Turkish Any other Asian Background, please specify below Turkish Cypriot Italian Polish Russian D – Black or Black British Age: 0-4 45-49 5-9 50-54 10-14 55-59 Kurdish Caribbean 15-19 60-64 Traveller Ghanaian 20-24 65-69 Gypsy/Romany Nigerian 25-29 70-74 Any other White background, please specify below Any other Black background, please specify below 30-34 75-79 35-39 80-84 40-44 85+ B - Mixed E – Other Ethnic Groups White and Black Caribbean Chinese White and Black African Any other ethnic group, please specify below White and Asian Prefer not to say Do you have any physical or mental impairment that has a substantial and longterm adverse effect on your ability to carry out normal day-to-day activities? Yes Any other Mixed background please specify below No I do not wish to state my ethnic origin Prefer not to say It is anticipated that there will be many responses to this consultation and we regret that we cannot enter into individual correspondence or provide detailed replies. It is planned to submit the final version of the LIP to the Mayor in May 2011. This will include details of responses to the consultation, an explanation of how the responses were considered and, where relevant, how the draft LIP was reshaped on account of the responses. When the LIP is approved by the Mayor of London, the Council will be publishing the approved LIP and a final summary document setting out Enfield’s Transport Strategy.
© Copyright 2026 Paperzz