ITEM NO: 3 Location: North Hertfordshire College, Cambridge Road, Hitchin, SG4 0JD Applicant: North Hertfordshire College Proposal: Construction of an all-weather pitch with associated floodlighting, acoustic bund, fencing and landscaping and footpath link (as a variation to planning permission ref 05/01262/1 dated 14 Nov 2005 ) Ref.No: 10/02345/ 1 Officer: Tom Rea Date of expiry of statutory period : 17 December 2010 Reason for Delay (if applicable) N/A Reason for Referral to Committee (if applicable) The site area exceeds 1 hectare 1.0 Relevant History 1.1 97/0690/1: Construction of sports centre for community/college use following removal of existing classroom and sports hall, new car parking, landscaping and ancillary works - granted 21/8/97 1.2 99/1015/1: Temporary building for use as changing room and siting of six 11.5 metre floodlights around football pitch, permission granted for changing room and refused for floodlighting 9/12/99 1.3 00/00499/1: Renewal of outline planning permission ref: 97/0690/1 granted 21/8/97 for the construction of a sports centre for community/college use, car parking, landscaping and ancillary works - approved 23/5/00 1.4 03/01355/1: Redevelopment of the existing site to provide a new three storey college complex plus a part basement area, to include theatre and sports hall (19,077sq.m gross external area); surface level parking; landscaping and ancillary works. All weather sports pitch with floodlighting and 2.5m acoustic fence. Demolition of all existing buildings excluding Walsworth House. Access as existing via Cambridge Road and St. Michaels Road - granted 22/1/04. Permission expired on 22/1/09. 1.5 05/01262/1: All weather sports pitch with six 13 metre floodlight columns, earth bund and acoustic fence, landscaping, access road and disabled parking spaces granted 14/1105 1.6 08/02915/1: Redevelopment to provide a replacement 3 storey building with part lower ground floor and detached sports hall for North Herts College with associated parking for 370 vehicles including 26 disabled spaces, 112 cycle spaces and other associated works, including internal access roads, landscaping and floodlit (15m high columns) all-weather pitch. Approved 27th February 2009. 2.0 Policies 2.1 Central Government Policy Guidance: PPG 17: Planning for Open Space, Sport and Recreation PPG 24: Planning and Noise Planning Policy Statement (PPS) 1 'Delivering Sustainable Development' Planning Policy Statement PPS 4: 'Planning for Sustainable Economic Growth' Planning Policy Statement PPS 9: Biodiversity and Geological Conservation Planning Policy Guidance note (PPS) 13 'Planning and Transportation' Planning Policy Statement PPS 22: Renewable Energy Planning Policy Statement PPS 23: Planning and Pollution Control Planning Policy Statement PPS 25: Development and Flood Risk 2.2 North Hertfordshire District Local Plan No. 2 - with Alterations: Policy 8: Development in Towns Policy 14: Nature Conservation Policy 21: Landscape and Open Space Patterns in Towns Policy 39: Leisure Uses Policy 55: Car Parking Standards 2.3 Supplementary Planning Guidance: Vehicle Parking Provision at New Development (adopted January 2006) Planning Obligations Supplementary Planning Document (adopted November 2006) 3.0 Representations 3.1 Environment Agency: Recommend a condition requiring a surface water drainage scheme in accordance with sustainable urban drainage principles. 3.2 Anglian Water Services Ltd: Any comments will be reported to the Committee. 3.3 Hertfordshire County Council (Highways): Comment that they do not wish to restrict the grant of permission. 3.4 Sport England: Comments received 8/10/10 Comment that Sport England raised no objection to the 2005 application. Acknowledged that the variations are consistent with the floodlit pitch approved in 2009. Sport England state that they are supportive of the application. Comment that the pitch size would meet Football Association standards and that the proposal responds positively to previous comments made by Sports England and the FA/Herts FA. Considers that the amended floodlighting scheme would seek to minimise impact on residential amenity while meeting the needs of the users of the pitch. Note that although slightly more playing field is lost the benefits associated with the increased size of the all weather pitch offset any harm. The proposal will still accord with exception E5 of Sport England's policy 'A Sporting Future for the Playing Fields of England' (1997). Accordingly, Sport England raises no objection to the proposal. Comments received 4/11/10: Confirm that the provision of a 106x71m pitch instead of a 101x63m pitch is clearly preferable because this size allows the pitch to be used for 11-a-side senior and under17/under 18 matches as confirmed in the Football Association's Guide to Artificial Turf Pitches (2009) - page 10. A 101x63m pitch represents the recommended dimensions of an all weather pitch that is designed for hockey use. While these dimensions can also accommodate 11-a-side youth football they are not large enough for 11-a-side senior football. As the all weather pitch on the application site is being designed principally for football use, providing dimensions that will offer the flexibility for matches to be played for all age groups is clearly preferable for both college and community use especially as the college's students (the principal users) will be in the senior or under17/18 age group. Advise that the FA would always prefer a 106x71m pitch to a 101x63m pitch because of the additional flexibility it would provide as set out in the guidance. Advise that both a 106x71m pitch and a 101x63m could accommodate three five-aside pitches as the dimensions for small sided football on all weather pitches are flexible as set out on page 10 of the FA's guidance. Urge the Council not to consider imposing any restrictions on the pitch in terms of pitch markings or five-a-side use. First, it has not been demonstrated that the noise associated with the operation of three five-a-side pitches (30 players) would be substantially greater than that associated with a single 11-a-side pitch (22 players) to justify restrictions being imposed. Second, it would be unreasonable to prevent five-a-side pitch markings given that a large proportion of the use will be during the day when noise will be less of an issue for residential amenity. Third, it would be difficult to enforce as in the absence of markings, pitches are usually delineated in other ways e.g. cones. Fourth, there are no restrictions on the 2005 or 2009 permissions in this regard although the pitches in both schemes would allow three five-a-side pitches to be marked out without restrictions. In terms of the hours of use of the all weather pitch, it is expected that a similar approach to be taken to the 2009 planning permission as a pitch of this size has already been permitted in the same location. The same would apply to the floodlighting proposals as these are the same proposals that were approved as part of the 2009 permission. 3.5 Hertfordshire Football Association: Support the application. Comment that the proposal will be a much needed modern facility will provide a significant boost to the prospects of continued development and investment in young people and sport in North Hertfordshire. Comment that the College has forged excellent links with the community as well as many organisations such as ourselves. This facility will enable the community to benefit from access to excellent new facilities, currently not available anywhere else in Hitchin. Indeed the local artificial pitches in nearby Baldock and Stevenage are currently over-subscribed, so the addition of this facility will greatly enhance access. The College will of course also benefit from the facility and with the scale of sports courses offered this type of project will only succeeded in ensuring that applications for these courses remains as high as in recent years. Whilst those fortunate enough to take the courses will see massive benefits from being able to use the modern and safe surface throughout the year. The Hertfordshire FA is very fortunate to have an excellent relationship with the College, best evidenced through the delivery in partnership of coach education courses. One of the limiting factors for us when producing our annual course programme is access to high quality facilities. We would be delighted to work with the College to provide such courses during holiday periods and at weekends to ensure that the grassroots coaches of North Hertfordshire also benefit from the facility. Considers that the pitch will be heavily subscribed but would not displace users from other sites and that there is a clear need for this facility in the Hitchin area. Strongly advise that pitch conforms with the Football Association’s artificial pitch recommendations (106m x 71m). 3.6 Landscape and Urban design officer: Raises no objections to the scheme. 3.7 Environmental Health officers: Any additional comments will be reported to the meeting 3.8 Herts & Middlesex Wildlife Trust: Comment that they have no objection to the development and recognise the distance of the pitch from the Purwell Meadows, acknowledge the native wildflower strip and the recommended EPS condition. 3.9 Hertfordshire Biological Records Centre: Recommends that if NHDC is minded to grant permission that consideration is given to the following: that the type and design of the floodlights minimises light spillage and glare as much as possible that the hours of use for the floodlights are restricted such that they are turned off at 10pm throughout the year consideration is given to a sustainable drainage system the adjacent wildlife site is given protection. 3.10 Response to Statutory Site Notice, Press Notice and Neighbour Notifications: Letters received from the occupiers of no. 94, 95, 96, 99, 100, 101, 118 Coleridge Close and 19 and 22 Campbell Close raising the following points Existing pitches are used less than 15 hours per week and is not for curriculum training. Floodlighting is not necessary curricular activities. Query weather the pitch is to be used for curricular or commercial purposes or both. Height of columns are above the roof apex of nearby properties Concern at noise from new pitch to the detriment of local residents amenity Concern at justification of expenditure in current economic climate Funds should be used to replace/refurbish buildings rather than sports facilities If AWP is to be approved then consideration should be given to a reduction in hours from 0900 – 1800 weekdays, 0900 – 1400 Sept – June weekends 0900 – 1200 July – August on Sundays and no permitted use on Sundays or Bank Holidays Pitch should be used for one football match only and not 5-a-side matches and a separate light switches to reduce light spillage. Lighting height should be restricted to 13m Acoustic barrier with fence and tree planting required and pitch moved as far as possible from residential properties. Lighting would influence local landscape character Loss of residential amenity Suggest separate lighting arrangements Noise and light pollution to nearby property College has not consulted residents Acoustic barrier should be increased and earth bund should be extended Query the reasoning for the enlarged pitch Previous restrictions should apply AWP should be moved further away from residential property Previous correspondence still relevant Concern that noise issue has not been fully evaluated Restrictions should be placed on the College to correct any adverse impact with the development. Old AWP pitch should be removed. 4.0 Planning Considerations 4.1 Site & Surroundings 4.1.1 The North Hertfordshire College Hitchin Centre site, including playing fields, extends to approximately 7.7 hectares (19 acres) and is sited between the Purwell Meadows Nature Reserve to the north-east and residential property within the Poets Estate to the south east and south west. The A505 Cambridge Road runs along the northern boundary of the site providing one of the two vehicular and pedestrian accesses into the site the other being directly off St. Michaels Road 30m south of the Cambridge Road roundabout. The college site is located approximately 0.3 km from Hitchin railway station and 1 km north east of Hitchin Town Centre. The Centre for the Arts (CfA), also part of North Hertfordshire College, is located 400 metres to the east of the Hitchin Centre. 4.1.2 A public footpath (FP81) runs from the St. Michaels Road entrance to the College for a distance of 520m along the length of the south western boundary of the site. The site slopes down from the St. Michaels Road entrance to the Purwell Meadows boundary (approximately 5 metres) in the northern part of the site. Beyond the existing sports hall the playing fields slope gently down towards Purwell Meadows and are located up to 5 metres below the level of the public footpath FP 81 which rises above the level of the playing fields towards Chaucer Way. A hedge runs along the south west and south east boundaries at approximately 2m in height. Beyond the public footpath are two storey dwellings forming part of Gibson Close, Coleridge Close, Campbell Close and Browning Drive. Several of the properties which adjoin the footpath boundary are sited with their flank walls facing the college site. The south eastern boundary of the site adjoins the rear garden boundaries of properties in Chaucer Way. 4.1.3 The site is within the Hitchin settlement boundary as defined on the District Local Plan Proposals Map. The Green Belt boundary follows the boundary of the college site with Purwell Meadows and the playing fields which form part of the college site south east of the existing sports hall are covered by Policy 21 of the local plan (Landscape and Open Space Patterns in Towns). 4.1.4 The application is accompanied by the following reports: Design and Access statement External Lighting Design Acoustic Planning Report 4.2 Proposal 4.2.1 The application seeks to vary a planning permission granted on 14th November 2005 (reference 05/01262/1) for an all weather sports pitch (AWP) with six 13 metre high columns, earth bund and acoustic fence, landscaping, access road and disabled parking spaces. 4.2.2 Permission is sought to vary the size of the AWP from one with a Total Playing Area (TPA) of 101m x 63m to one with a TPA of 106m x 71m. The new pitch would be therefore 8 metres wide (4 m either side) and would have an additional length of 5 metres. Permission is also sought to vary the height of the floodlight columns from 13 metres to 15 metres. 4.2.3 For clarity, the car parking and hardstanding area previously proposed in the 05/01262/1 application adjacent the new pitch is not now proposed as existing car parking on the site adjacent the existing sports hall is considered sufficient. 4.2.4 The proposed AWP is sited in the same location as the AWP approved in the 2005 permission and there is no proposed change to the hours of operation/use (i.e. use restricted to between the hours of 9.00am and 8.00pm Monday to Friday and 2pm on Saturdays and Sundays and 12pm on Sundays during July and August and at no time on Public of Bank Holidays). 4.2.5 A landscaping bund incorporating a 2m high acoustic screen is also proposed along the southern boundary of the site. The bund is to include semi-mature and extra heavy tree planting within a 1.5m depth of topsoil. 4.3 Key Issues 4.3.1 It is considered that the key issues for consideration are as follows: The principle of the provision of a floodlit all weather sports pitch Design of the AWP and impact on neighbouring property and visual amenity Access, parking and traffic generation Landscaping and Ecology 4.3.2 Principle of an all weather pitch (AWP) Given the recent planning history where the Local Planning Authority has granted planning permissions in 2003, 2005 and 2009 for a floodlit all weather pitch in this location it is considered that in principle there can be no objection to this proposal. It should be noted that the still extant planning permission 08/02915/1, albeit a much larger redevelopment scheme, proposed the same size pitch, in the same location with the same number (6) and height (15m) of floodlighting columns. 4.3.3 It is noted that Sport England is supportive of the proposals. They consider that although part of the current playing field will be lost there would be no net loss of natural turf playing pitches. As such the proposals meet the exceptions policy E5 of the agency when assessing applications that result in loss of playing fields. 4.3.4 Design of the AWP and impact on neighbouring property and visual amenity The introduction of a floodlit all weather pitch (AWP) has perhaps previously been the only controversial issue associated with previous planning applications on this site with the two main areas of concern raised by local residents being the proposed floodlighting and noise from the sports pitches. Before considering the details proposed in this application it should be noted that the Local Planning Authority has approved on three occasions in recent years applications for a full size all weather floodlit pitch in a similar location as that now proposed. The 2004 permission proposed an AWP running parallel with the south east boundary slightly to the north west of the proposed AWP and at a distance from the Coleridge Close properties of 33 metres at its nearest point. The 2005 permission (extant until 14/11/10) proposed a floodlit pitch at right angles to the Coleridge Close properties in a very similar location to that now proposed and at a distance of 38 metres to the nearest properties. The currently extant planning permission granted in 2009 (ref: 09/02915/1) proposed a pitch in the same location, of the same dimensions and with the same number of floodlights (and 15m column height) as the variation now sought permission. All of the previous applications proposed an acoustic screen, earth bund and landscaping. The size of the AWP has increased slightly over the size of the 2005 consent– 5m to the overall length and 8m to the width – this being required in order for the college to meet the requirements of Hertfordshire Football Association and the standard required of the Football Association. 4.3.5 With regards to the lighting the proposal is for six 15 metre high floodlit columns – 3 on each side of the AWP. The main concerns of residents appear to be the height of the columns and glare/light spillage. The proposed lights would be 2 metres higher than those permitted in 2005 although of the same height and position as permitted in 2009. The problems of glare and light spillage from sports floodlights has been well documented in recent years and this has led to the development of more technically advanced systems that address these concerns. In this case it is understood that the higher columns enable the lamps to be set horizontally thus directing light downwards reducing light spillage. Lower columns require a higher level of illumination as there is greater light spill and to avoid issues such as overshadowing. The acceptability or otherwise of the floodlighting is whether light spillage can be minimised and this is demonstrated in the External Lighting Design report which demonstrates that at boundary level the level of illumination is generally 1 lux with a marginally higher level of 2 lux which falls on the existing separately illuminated footpath. The light levels would be 1 lux at adjacent residential gardens. The Institute of Lighting Engineers recommends that in locations such as this (relatively dark urban locations) a level of 5 lux into adjacent windows is acceptable.(see ILE Table 1 Obtrusive Light Limitations for Exterior Lighting Installations) The proposed lighting levels will be significantly below this as indicated on the plan no. 60045529/E/SK001 (Rev A1) shown in the floodlighting report. Conditions attached to the previous 2005 planning permission require that at the site boundaries the lux levels do not exceed 1 lux. Members of the Planning Control Committee considered this issue at length during its consideration of the 2008 application and resolved via a planning condition (No. 25) that any floodlighting spillage should not exceed 1 lux at adjacent residential windows. It is recommended that the same condition is re-applied if permission is granted. 4.3.6 With regard to noise generated by the use policy guidance PPG 24 (Planning and Noise) recognises that the impact of noise from new development can be a material planning application. The application is accompanied by a Noise Report and this advises that the proposals would be within the British Standard (BS 8233 1999) guidelines for outdoor amenity space (gardens) and the majority of external spaces which also reflects the advice from WHO (World Health Organisation). The report advises that first floor windows on adjoining property may receive slightly higher levels of noise (40 Aeq [dB] (internally) than the recommended 35Aeq [dB]) and therefore, in order to mitigate against this, the proposals include the earth bund acoustic timber screen and planting which will reduce noise levels to within the recommended guidelines. In conclusion the noise consultants consider that with the mitigation measures there will be a reduction in noise levels to within recommended guidelines and will provide the greatest practicable protection against noise from the all weather pitch to the adjacent residences. It is recommended that the same condition imposed on the 2008 application in respect of the submission of full details of the noise barrier and its acoustic performance in the interests of the amenity of nearby residential occupiers is applied to this application. Circular 11/95 advises of the use of conditions in determining planning permissions where they can be reasonably enforced and I consider that in this case the Local Planning Authority can, in conjunction with Environmental Health officers, monitor and enforce the conditions if required. 4.3.7 The previous permissions restricted the hours of use of the AWP to between 09:00 – 20:00 Monday to Friday and 09:00 – 14:00 Saturdays and Sundays and 09:0012:00 Sundays and during July and August. Several residents have requested that the same conditions are attached to this application as were attached to the 2005 permission. The applicants have not requested any changes to the hours of use. It is noted that one resident has requested that the hours of use are in fact reduced during weekdays to 6pm from the approved 8pm. I do not consider this request reasonable given the documentary evidence submitted with the application which demonstrates that there would be no material harm to residential amenity and the fact that the Local Planning Authority has recently approved 8pm as the terminal hour. Furthermore and taking into account the advances in lighting technology, the Council has permitted in the district several other planning applications involving AWP and floodlighting with extended hours of operation. These applications include: 08/00640/1: Meridian School, Royston – Floodlighting permitted up to 21:30 Monday to Friday and up to 18:30 Saturday, Sundays and Bank Holidays. 05/01420/1: Knights Templar School, Baldock - Floodlighting permitted up to 21:30 Mondays to Fridays and up to 18:30 on weekends 05/00857/1: Tennis Courts, Bury Lane, Codicote – Floodlighting permitted up to 22:00 hours Monday to Friday and 21:00 hours Saturdays, Sundays and Bank Holidays 08/01610/1: King George Recreation Ground, Whitwell – Floodlighting permitted until 22:15 hours on any day. 4.3.8 There are several key concerns raised by residents with regard to the following: whether there is a curricular need for the facility the need for a larger pitch than the 2005 permission whether there should be multi-game five-a-side football permitted In response to these comments I consider that these concerns have been addressed to a large extent in the comments provided (above) by Sport England and Hertfordshire Football Association. The applicant advises that the provision of the new pitch will underpin its curricular activity whilst also providing the resource for students to operate their own coaching and personal training enterprises within the College environment. It is clear that a larger pitch is needed to meet FA requirements for senior football. Finally, the previous permissions have not excluded the use of the pitch to accommodate 5-a-side and I would concur with the view that there is no evidence to suggest that 2- 3 games of 5-a-side would generate any more noise than a full 11-a-side match. 4.3.9 In view of the technical information submitted with the application and the analysis above it is concluded that the proposed AWP together with suggested mitigation measures would have an acceptable relationship with adjoining residential occupiers and that there would be no significant harm to the visual amenities of the locality. 4.3.10 Landscaping and Ecology A key feature of this proposal is the introduction of a wildlife meadow strip along the north eastern boundary with Purwell Meadows which will be of significant landscape and biodiversity benefit to the site. The creation of a landscape bund and tree planting along the south eastern boundary in the vicinity of the all weather pitch will add to the landscape diversity across the site and provide further wildlife habitat. The landscape bund will include a variety of deciduous and evergreen species and the specification including subsequent maintenance is set out in the softworks drawing no. PL972.M.104 E. It is recommended that a condition is attached requiring the development to be carried out in accordance with these details. No substantial areas of hardsurfacing are proposed other than the footpath access to the AWP and therefore there is an improvement on the 2005 permission in this respect, particularly in terms of any traffic noise that could potentially have affected neighbours. The Environment Agency has requested that a surface water drainage scheme, based on sustainable drainage principles, is submitted and approved prior to the commencement of works and it is recommended that such a condition is attached if permission is granted. 4.3.11 In conclusion on the landscape aspect of the scheme, it is considered that the applicants have designed a scheme that is sensitive to and integrates with the landscape character of the site and addresses the fundamental relationship of the college site and the AWP to the Purwell Meadows wildlife site. 4.3.12 In assessing planning applications Local Planning Authorities are obliged to have regard to Planning Policy Statement PPS 9 'Biodiversity and Geological Conservation' particularly to ensure the protection and enhancement of local biodiversity. The applicants have previously carried out a Phase I Habitat Survey which revealed that the majority of the site has low ecological value consisting mainly of managed amenity grassland, planting and hardsurfacing. The scheme now before the Committee does not include the large scale demolition of the college buildings and removal of a number of mature trees that could potentially have affected wildlife and their habitat and the Hertfordshire Biological Records Centre have not requested that any further survey work is carried out. Hertfordshire and Middlesex Wildlife Trust have however suggested that a further protected species survey would be appropriate. It is considered that the college has had regard to wildlife considerations as part of this scheme having carried out a previous survey and they have responded by incorporating a wildlife meadow along the western boundary of the site and providing further habitat through the landscaped bund and there are no proposals to remove hedgerows adjacent Purwell Meadows. In this case the developers have made a reasonable assessment of the ecological impact of the development which reveals that the majority of the site has low ecological value. In the light of the Wooley judicial review case however and having regard to the Council's obligations under the Conservation Regulations 1994 and the EU Habitat Directive (1992) it is considered that a further protected species survey is required. In any event the applicants will have to apply for a licence from Natural England before any works that could disturb protected species. 4.3.13 Access, parking and traffic generation There are no changes to the vehicular access to the site and there are no proposals to provide an additional access road, disabled parking spaces or turning area adjacent the new pitch as was proposed with the 2005 permission. It is considered that likely that there will be some additional car parking demand as a result of the provision of the AWP however the college has capacity for up to 322 car parking spaces together with 14 disabled parking spaces and cycle storage spaces. Given the sustainable location of the site and recognising its accessibility to Hitchin station and bus interchange, bus stops outside of the site and cycle parking provision it is considered that there is adequate parking provision within the site to accommodate the new use. The decision not to include a vehicular access right up to the pitch and only a pedestrian access from the existing sports hall would result in far less hardsurfacing being provided and no traffic movement close to the Campbell Close and Coleridge Close properties. 4.4 Conclusion 4.4.1 In view of the above analysis of the application against planning policy guidance, development plan policy and the submitted technical information I conclude that the AWP pitch scheme would not have a significantly adverse impact on the living conditions of adjoining residents nor would it detract from visual character of the area or the natural environment. The scheme is a limited revision of an earlier permission and the pitch and floodlights are of the same size and position as an extant permission (08/02915/1). There have been no material changes in circumstances from the original grant of permission or the permission granted in 2009. As such it is recommended that permission is granted subject to conditions. 5.0 Legal Implications 5.1 In making decisions on applications submitted under the Town and Country Planning legislation, the Council is required to have regard to the provisions of the development plan and to any other material considerations. The decision must be in accordance with the plan unless the material considerations indicate otherwise. Where the decision is to refuse or restrictive conditions are attached, the applicant has a right of appeal against the decision. 6.0 Recommendation 6.1 That planning permission be GRANTED subject to the following conditions: 1. The development hereby permitted shall be begun before the expiration of 3 years from the date of this permission. Reason: To comply with the provisions of Section 91 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. 2. The development hereby permitted shall be carried out wholly in accordance with the details specified in the application and supporting approved documents and plans listed above. Reason: To ensure the development is carried out in accordance with details which form the basis of this grant of permission. 3. The approved details of landscaping and earth bund works shall be carried out in accordance with the submitted details and prior to the first use of the All Weather Pitch hereby approved. Any trees or plants which, within a period of 5 years from the completion of the development, die, are removed or become seriously damaged or diseased, shall be replaced during the next planting season with others of similar size and species, unless the Local Planning Authority agrees in writing to vary or dispense with this requirement. Reason: To safeguard and enhance the appearance of the completed development and the visual amenity of the locality. 4. Development shall not commence until a surface water drainage scheme for the site, based on sustainable drainage principles, has been submitted to and approved in writing by the Local Planning Authority. The scheme shall subsequently be implemented in accordance with the approved details before the development is completed. The scheme shall also include details of how the scheme shall be maintained and managed after completion. Reason: To prevent the increased risk of flooding, improve and protect water quality, enhance habitat and amenity value and ensure future maintenance. 5. The use of the all weather sports pitch hereby approved shall be restricted solely to the playing of football and shall not be used for any other sport or activity without the prior written approval of the Local Planning Authority. Reason: To prevent the pitch being used for another form of sport or activity which could give rise to noise problems prejudicial to the residential amenities of adjoining occupiers. 6. The use of the all weather sports pitch hereby approved and the associated floodlighting shall be restricted to between the hours of 9 a.m. and 8 p.m. Monday to Friday, 9 a.m. and 2 p.m. Saturdays and Sundays, 9 a.m. and 12 p.m. on Sundays during July and August and at no time on Public or Bank Holidays. Reason: To safeguard the residential amenities of adjoining occupiers from the use of the pitch and floodlighting outside the stated times. 7. Prior to the construction of the all weather pitch hereby approved, full details including details of the pitch surface and means of enclosure shall be submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details. Reason: To ensure that the All Weather Pitch includes a suitable surface and means of enclosure for the type of sport to be played. 8. No part of the development shall be occupied until there has been submitted to and approved in writing by the Local Planning Authority details of all external lighting, including lighting required for the pedestrian walkways, parking areas and security lighting, and there shall be no external illumination erected, installed or operated on any part of the site other than in accordance with these approved details. No part of the development shall be brought into use or occupied until the works as approved have been carried out and completed. Reason: To safeguard and enhance the appearance of the completed development and to exercise control over these details having regard to the relationship of the site to the adjoining Purwell Meadows Local Nature Reserve. 9. Prior to the commencement of the development hereby permitted details of all hardsurfacing within the site including footpaths shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the approved details. Reason: To ensure that the development does not detract from the appearance of the locality. 10. Before any part of the development of the all weather pitch hereby approved is first commenced, full details of the location, appearance and construction of the noise barrier and earth bank and its acoustic performance in relation to noise emanating from the site and measured at the adjacent residential gardens shall be submitted to and approved in writing by the Local Planning Authority. In addition full details of the construction of the all weather pitch and all associated items including height and design of floodlight columns shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the details as approved. Reason: To safeguard the amenity of nearby residential occupiers. 11. The floodlighting of the all weather pitch hereby approved shall not result in any spillage of lighting exceeding 1 lux at adjacent residential windows. Reason: To safeguard the amenity of nearby residential occupiers 12. Within 28 days of the all weather pitch hereby approved first becoming available for use, the use of the existing all weather pitch for sport activities on the submitted plans shall be permanently discontinued. Reason: To prevent the level of activity associated with the use of 2 all weather pitches in the interests of safeguarding the amenities of local residents. 13. All building work associated with the development hereby approved shall be restricted to between the hours of 7.30am and 6.00 pm Mondays - Fridays and between the hours of 8.00 am and 1.00pm on Saturdays and no time on Sundays or Bank Holidays. Reason: To safeguard the general amenities of the nearby occupiers. 14. If within a period of nine months following the first use of the All Weather Pitch hereby permitted, the Local Planning Authority requires realignment or shielding of the lights to be adjusted or the acoustic screening to be modified, this shall be carried out with an agreed scheme before the continuation of the use. Reason: To safeguard the residential amenities of occupiers of adjoining and nearby properties. 15. Prior to the commencement of the development hereby approved, a protected species survey shall be carried out to ascertain the presence or otherwise of European protected species including bats, badgers, reptiles and great crested newts on the site. The survey report shall include detail with regard to the possible impacts on riverine habitats and water voles. Written reports, including relevant mitigation strategies, method statements, works schedules and licence requirements, shall be submitted to and approved in writing by the Local Planning Authority. The development shall be carried out in accordance with the details as approved. Reason: To ensure proper consideration of the impact of the development on nature conservation interests. . Reason for Decision In the opinion of the Local Planning Authority, the proposed development would maintain a high standard of design and layout and would not have an adverse impact on the residential amenities enjoyed by adjacent occupiers nor would the development be detrimental to the landscape character and ecology of the locality. Furthermore, the development would not have any significantly adverse impact on highway safety. As such, the development accords with the provisions of the development plan the relevant policies of which are summarised below: North Hertfordshire District Local Plan No. 2 - with Alterations: Policy 8: Development in Towns Policy 14: Nature Conservation Policy 21: Landscape and Open Space Patterns in Towns Policy 39: Leisure Uses Policy 55: Car Parking Standards Supplementary Planning Guidance: Vehicle Parking Provision at New Development (adopted January 2006) Planning Obligations Supplementary Planning Document (adopted November 2006)
© Copyright 2025 Paperzz