ALAN BRUBAKER P.E., P.S. _____________________________________________________________________________________________________________________________ _____ SUMMIT COUNTY ENGINEER FOR IMMEDIATE RELEASE July 29, 2017 Summit County Engineer’s Office Contact: Heidi Swindell Phone: 330 643-8170 http://summitengineer.net Summit County Engineer’s office has summer road work planned Akron, Ohio – Alan Brubaker, P.E., P.S., Summit County Engineer has finalized the summer road work plans to take place in various locations around the County for 2011. Despite decreasing revenues, the Summit County Engineer’s office has allocated $1.49 million for pavement maintenance in the Capital Improvements Program this year, an increase of 24% over the 2010 pavement maintenance allocation. This is due to cost saving administrative and personnel changes, allowing more room in the budget for improving the County’s roads and bridges. The Summit County Engineer’s office bid process was opened up to other communities in Summit County. The larger purchasing power created by bidding for pavement maintenance items as one unit had lead to a smaller per unit costs for all participants, while the municipalities still maintain local control over the projects. The Summit County Engineer’s office will administer the County-wide program. “Times are tough financially for local governments and the taxpayers,” said Engineer Brubaker. “As a result we, as elected officials, must identify ways to cooperate to reduce the costs of services. It just makes sense to develop this new collaboration among Summit County communities. A regional approach can save money and promote efficiency in our road programs without reducing the level of services. It's a win-win-win situation for the County, municipalities, and the townships.” Many officials were involved in the creation of the County-wide program. The Summit County Engineer’s office would like to thank Summit County Council, the Summit County Executive, and participating officials from Bath, Copley, Coventry, Northfield Center, Sagamore Hills, Springfield, and Twinsburg Townships as well as the cities of Akron and New Franklin and the village of Richfield. “It has been my general philosophy to go back to the basics”, said Brubaker. “That means we reduced overhead costs, cut unnecessary projects that would require us to borrow more money and instead live within our means to perform our fundamental job function – maintenance and repair of County roads and bridges”. Please find below the upcoming projects in your area: 2011 Summit County 405 and 409 Resurfacing Program Owner Road From To Summit County Engineer (405 and 409) Boston Mills Rd. Richfield Corp. Line Black Rd. Summit County Engineer (409) Columbia Rd. Myersville Rd. Minor Rd. Black Rd. Green Corp. Line Medina Line Rd. Riverview Rd. Krumroy Rd. Cleve-Massillon Rd. Bath Township (405 and 409) Lakeview Dr. Knollwood Ln. N. Revere all #2056 All Bath Township (409) Lakeview Dr. Big Spruce Dr. Harvest Dr. Idlebrook Dr. Woodhaven Blvd. Ranchwood Spur Rolling View Dr. Tee Dr. Retreat Dr. Heather Hills rd. Spring Crest Dr. Bittersweet Rd. Derrwood Dr. Cliff Spur Dr. Briar Hill Spur Fox Chase Dr. Green Dr. Fairway Dr. Montrose Ave Clouse St. #2056 all all all Boltz Rd All All All all All all all all all all all all all all all all all all all all All All All All All All All All All All All All All All All Copley (409) N. Plainview Rd. SR 162 dead end. Coventry Township (409) Aqua all All Carr Dorwil Dorwil Ct. all all all All All All Dot Ct. Durst Edgepark all all all All All All Heath Hummel N. Viona all all all All All All Oak Grove Peninsula Rhine S. Viona UHL Vaughn Trail (part) W. Willowview Wrico Springfield (405 and 409) Klagges Blvd. Fenn Rd. Springfield (409) Broadview Rd. Canova E. Pace E. Willowview Hohman Hottle Monte Vista Overland Parnell Port Wagoner all all all all all All All All All All all all all All All All Monroe Falls Ave. Tallmadge Corp Ln Tallmadge Corp Ln Portage Lakes Dr. all all all all Canova all Canova Canova all Fenn Rd. dead end dead end Port All All All All End All End End All 409 resurfacing is also known as Seal Coat or Chip Seal. The contractor places an emulsion on the roadway, spreads gravel on top of the emulsion, compacts the stone into the emulsion with a roller, and then sweeps the excess gravel from the road the same day and then again after about a week. 409 is much less expensive than hot mix asphalt, prevents water from causing cracks and potholes in the pavement, and increases tire traction. 405 resurfacing is also known as Motor Paving. The contractor uses a portable mixer on-site to prepare the asphalt mixture, places it on the roadway, and then compacts it with a roller. 409 is then placed on top of the 405. 405 is less expensive than hot mix asphalt but is used in conjunction with 409 when the roadway crown or edges need to be re-established. A further advantage is that 405 is more flexible than hot mix asphalt and can resist small movements in the road base that would crack hot mix asphalt. Lytle Construction is the contractor for this year’s combined 405/409 contract. This contract includes the Summit County Engineer’s Office and Bath, Copley, Coventry, and Springfield Townships. The value of this year’s contract is $830,784.50 and will be performed in August and September. 2011 Summit County 448 Resurfacing Program North Owner Road From To Summit County Engineer Bath Rd. Old Mill Rd. Revere Rd. Revere Rd. Twinsburg C.L. Bath Rd. Shade Rd. Ravenna Rd. Shade Rd. Maple Leaf Hill Reserve Dr. Rain Tree Rd Olentangy Dr. all all all all all all All All Rainbow Lane Logwood Rusticwood Timberwood all all all all All All All All Willow Lake Dr. Countryside Dr. Edge Lake Oval all all all All All All Bath Twp Richfield Village Sagamore Hills Twp 448 resurfacing is also known as Hot Mix Asphalt. The asphalt is prepared in an asphalt plant, transported to the site in heated trucks, placed on the roadway in the desired thickness, and then compacted with a roller. 448 is the most durable (and most expensive) asphalt pavement and resists cracking and rutting more than 405 and 409 resurfacing. It is used in locations that have heavy traffic and a high percentage of truck traffic. Karvo Paving Company is the contractor for this year’s 448 contract in the northern half of Summit County. This contract includes the Summit County Engineer’s Office and Bath, Richfield, and Sagamore Hills Townships. The value of this year’s contract is $1,040,523.10 and will be performed in August, September, and October. 2011 Summit County 448 Resurfacing Program South Owner Road From To Albrecht Rd. Pickle Rd. Edith Green Corp. Line Portage Line Killian Rd. W. Rhine W. Pace W. Olden Cargo Snow Gable E. Olden all all all all all all all all all all all all all all Summity County Engineer Coventry Twp. Rome all all Westview Dr. Silver Ridge Greensfield Ln Westmount Dr. Conestoga Tr. all all all all all all all all all all Copley Twp 448 resurfacing is also known as Hot mix Asphalt. The asphalt is prepared in an asphalt plant, transported to the site in heated trucks, placed on the roadway in the desired thickness, and then compacted with a roller. 448 is the most durable (and most expensive) asphalt pavement and resists cracking and rutting more then 405 and 409 resurfacing. It is used in locations that have heavy traffic and a high percentage of truck traffic. Northstar Asphalt is the contractor for this year’s 448 contract in the southern half of Summit County. This contract includes not only the Summit County Engineer’s Office, but also Coventry Township and Copley Township. The value of this year’s contract is $597,890.00 and will be performed in August, September, and October. Akron-Peninsula Road Resurfacing Akron-Peninsula Road will be improved this year from 1,200’ south of Truxell Road to Orchard St. in Village of Peninsula. The existing road will be milled, pavement repairs will be performed, new asphalt will be placed, and new pavement markings will be applied. The Shelly Company is the contractor for this project. The value of this contract is $453,252.65. This work is being funded 100% by federal funds. The work is currently underway and should be complete by July 15, 2011. Lockwood Road Resurfacing Lockwood road from SR 619 to State Road will be improved this year. The existing road will be pulva-mixed. This process grinds the existing pavement and then compacts it back in place to form a stable road base of recycled from the original road material. Next, an intermediate course of 405 will be placed. This will allow the crown of the road and proper cross slopes to be formed to ensure adequate road drainage. Finally, a surface course of 409 will be applied and the lanes will be striped. Lytle Construction is the contractor for this project. This contract is a joint effort by the County Engineer and the City of Barberton. The value of this contract is $191,440.50. SCE local funds will pay for 67% ($128,875.94) of the project and the City of Barberton local funds will pay for the remaining 33% ($62,564.56) of the project and the work will be performed in August and September. Asphalt Rejuvenating Owner Road From To Jacoby Rd. Swartz Rd. N. Turkeyfoot Rd. Waterloo Rd. Krumroy Rd. Summit Rd. Darnell Dr. Vaughn Trail Portage Line Rd. SR 241 Ridgewood Rd. 800' w of Arlington 500' w of S. Main St. SR 224 Pressler Rd. Easr Ave Edward Ave. Tanglewood Dr. 12th St. SW Lexington Ave. Independence Av Belden Ave. Piedmont Ave. Lawton St. Noah Ave. Greenwood Ave. Lawton St. Crosier St. Quayle Dr. 16th St. SW 19th St. SW Linden Ave. Roscoe Ave. East Ave. Selzer Ave. Shatto Ave. Kenmore Blvd. Cuyahaga Falls Ave. De Valera St. De Valera St. Independence Ave. Storer Ave Stoner Ave. Diagonal Rd.. Packard Dr. Inman St. Hilbish Ave. Battles Ave. Chester Ave. Birchwood Ave. Joy Ave. Mallison Ave Howard St. N. Hawkins Ave. Chester Ave. Riverside Dr. Home Ave. Home Ave. Annapolis Ave. Diagonal Rd. Slosson St. Lawton St. Storer Ave. Talbot Ave. Woodstock Rd. Indian Tr. Indian Tr. Riverside Dr. Bittaker Arbour Green Dr. Autumn Leaves Mallard Pond Dr. Darlington Dr. Medina Line Rd. West end cul-de-cac Arbour Green Dr. Arbour Green Dr. North end cul-de-sac East end cul-de-sak Heatherleigh Dr. Autumn Leaves Dr. Anthony Lane Bavaria Rd. Boyle Curry Lane Harvard St. Jane's Ct. Lynne Dr. Oak Meadow Dr. Pine Trail Pine Trail Cir. Ruby Spruce Lane St. Mikala Twinsburg Corp Ln Macedonia Corp. Ln Enterprise Pkwy W. End (Cul-de-Sac) Case Oak Meadow Dr. Twinsburg Rd. S. End Round Stow Rd. Pine Trail Harvard Pine Trail Adam Run E. Dead End Enterprise Pkwy Highland Rd. Trisch Cir. Eton E. End Round Curry Waynesboro Spruce Lane Spruce Lane E. Dead End Ravenna Rd. E. End (Cul-de-Sac) Summit County Engineer City of Akron Bath Township Twinsburg Township Trisch Cir. Waynesboro Wildel Woodland Glen Curry Bradford Park Twinsburg Darrow Rd. Wildel Oak Meadow Trisch Cir. E. End Round Asphalt Rejuvenating agent is applied to hot mix asphalt that was placed one or two years ago. The agent restores flexibility and water resilience that the asphalt surface lost due to weathering and the passage of time. Forty-five minutes after the rejuvenating agent is applied, sand is placed over the agent to absorb excess agent and provide enhanced vehicle traction. One week later, the excess sand will be swept from the road surface. Pavement Technology, Inc. is the contractor for this year’s Asphalt Rejuvenating This contract includes the Summit County Engineer’s Office, City of Akron, and Bath and Twinsburg Townships. The value of this year’s contract is $174,986.80 and will be performed in August, September, and October. 2011 Crack Sealing Program for Summit County Owner Road From To Cleve-Massillon Rd. Summit Rd. Portage Lakes Dr. State St. Springside Dr. Cleveland-Massillon Rd. S.Turkeyfoot Rd. SR 93 Ghent Rd. Jacoby Rd. S. Main St. New Franklin Corp Line Brittian Rd. Bellevue Ave. G. Washington Blvd. Cramer Ave. Springfield Center. Rd. Wilbeth Rd. Schocalog Rd. Woodridge St. Triplett Blvd. Independence Hawkins Ave. Triplett Blvd. Hoover Ave. Wedgewood Dr. I-77 Ridgewood Rd. Winston St. Arlington Rd. Cuyahoga Falls Corp. Hardesty Blvd. Springfield Lake Blvd. Hilbish Ave. dead end east Arlington Rd. Covington Rd. Hancock Ave. Hilbish Ave. Pin Oak Rd. Aspenwood Rd. Ridge Dr. Willow Ln. Stone Gate Blvd. Shaw Ext. Wye Rd. Roberts Ridge Charles Lane Sandin Rd. Woodhaven Blvd. Pin Oak Rd. Reserve Dr. Ridge Dr. Medina Line Rd. Hametown Rd. Cleve-Massillon Rd. Ira Rd. Roberts Ridge Ranchwood Rd. Ext. Cul-de-Sac Cul-de-Sac Cul-de-Sac Stone Gate Blvd. Cul-de-Sac Cul-de-Sac Cleve-Massillon Rd. Cul-de-Sac Cul-de-Sac Shaw Rd. Extention Summit County Engineer City of Akron Bath Twp Robinwood Hills Dr. Inner Circle Dr. Candlewood Ln. Arbour Green Dr. Autumn Leaves Dr. Mallard Pond Dr. Darlington Dr. Shaw Rd. Robinwood Hills Dr. Ira Rd. Medina Line Rd. west Cul-de-Sac Arbour Green Dr. Arbour Green Dr. Robinwood Hills Dr. Cul-de-Sac Cul-de-Sac Cul-de-Sac east Cul-de-Sac Heatherleigh Dr. Autumn Leaves Dr. Fairington Ave. Remmington Ave. Wilshire Dr. Maralroy Way Ansley Court Quincy Dr. Shillings Way Devereux Dr. Greensfield Lane Greensfield Cir. Ridgewood Rd. Fairington Ave. Medina Line Rd. Remmington Ave. Wilshire Dr. Shillings Way all all Westview Dr. Greensfield Lane Remmington Ave. Cul-de-Sac Remmington Ave Dead end Cul-de-Sac Cul-de-Sac All All both Cul-de-Sacs. Cul-de-Sac. Anchor Lane Barry Lane Beacon Hill Blvd Brookfield Ln. Brookgate Way Brookhaven Ct Brookledge Ct Brookline Ct. Brookpointe Circle Brookrun Ct. Brookside Ln. Brookwood Ct. Buoy Ct. Charlton Circle Charter Dr. Country View Pkwy. Crestwood Ln. Dory Dr. East Oakmont Way Fairhaven Dr. Fantail Dr. Foghorn Ln. French St. (off Aurora) French St. (off Sp Crk) Golden Link Blvd. Hazel Dr. Hill Ct. Twinsburg Rd. Olde 8 Rd. Brandywine Rd. Meadow Brooke Way Twinsburg Rd. Meadow Brooke Way Brookgate Way Meadow Brooke Way Brookfield Lane Brookside Lane Brookfield Lane Brookgate Way Charter Dr. Bayberry Dr. Olde 8 Rd. Twinsburg Rd. Morningside Dr. Scupper Lane Skyhaven Rd. Olde 8 Rd. all Schooner Lane SR 82 Springcreek SR 82 SR 82 Meadow Brooke Way Scupper Lane Kathy Lane Dorwick Dr. Cul-de-Sac Cul-de-Sac Cul-de-Sac Cul-de-Sac Cul-de-Sac Cul-de-Sac Cul-de-Sac Dead end Cul-de-Sac Cul-de-Sac Cul-de-Sac Anchor Lane Joey Lane Dead end Cul-de-Sac Cul-de-Sac Morningside Dr. All Scupper Lane Dead end Dead end Macedonia Corp Line dead end Cul-de-Sac Copley Twp Northfield Center Karen Ln. Kathy Ln. Kenwick Dr. Laurie Ln. Ledgemont Rd. Litehouse Trail Lowell Ln. Lucy Ln. Meadow Brooke Way Morningside Dr. Natalie Blvd. North Oakmont Dr. Northfield Ave. Oakmont Dr. Outrigger Ln. Oviatt Dr. Pebble Brooke Court Pin Oak Circle Pleasantview Dr. Rolling Brooke Way Schoepf Rd. Schooner Ln. Scupper Ln. Skyhaven Rd. Skylane Dr. South Oakmont Rd. Springcreek Rd. Surry Vesta Ave. Olde 8 Rd. south Cul-de-Sac Lowell Lane Barry Lane Skyhaven Rd. Olde 8 Rd. Beacon Hill Blvd. Olde 8 Rd. all Fairhaven Rd. Springcreek Oakmont Rd. Olde 8 Rd. Olde 8 Rd. Anchor Lane Olde 8 Rd. Brookside Lane Olde 8 Rd. Highland Rd. Meadow Brooke Way from hill to the north Foghorn Foghorn E. Oakmont Way Pleasantview Dr. Oakmont Rd. Sagamore Twp. Line Morningside Dr. Northfield Ave. Kathy Lane dead end Dorwick Dr. Kathy Lane dead end Foghorn Lane Marwyck Dr. dead end All dead end Cul-de-Sac Cul-de-Sac dead end N. Oakmont Rd. Fantail Dr. Shady Lane Cul-de-Sac Cul-de-Sac Beacon Hill Blvd. Cul-de-Sac Cul-de-Sac Anchor Lane Anchor Lane N. Oakmont Rd. Cul-de-Sac E. Oakmont Way Cul-de-Sac Brandywine Rd. SR 82 Adam Run Anthony Lane Bavaria Rd. Boyle Pkwy. Bradford Park Buchtel Case Curry Darien Enterprise Pkwy Estate Eton Evans Way Hadden Harvard Isabel Jane's Ct. Katz Twinsburg Corp. Limit Twinsburg Corp. Limit Macedonia Corp. Limit Enterprise Pkwy. Waynesboro Harvard Harvard W End (Cul-de-Sac) Evans Way W. Dead End SE End (Cul-de-Sac) Harvard Adam Run Highland Case Marwell Oak Meadow W. Dead End Evans Way E. Dead End Enterprise Pkwy Highland Rd N. End Round Hadden Yale Trisch Twinsburg Corp. Limit Twinsburg Corp. Limit Twinsburg Rd.. Hadden Liberty Twinsburg Corp. Limit Eton Twinsburg E. End Round Lynne Twinsburg Twp. Lynne Dr. Marwell McCausland Myrna Oak Meadow Pam Ct. Park Ridge Pine Trails Pine Trails Cir. Ridgetop Ruby Sara Fletcher Ct. Spruce St. Mikala Ct. Timber Trisch Cir. Wayneboro Wildel Woodland Glade Twinsburg Estate SE End (Cul-de-Sac) Marwell S. End Round S. End (Cul-de-Sac) Ridgetop Stow Pine Trail Twinsburg Havard S. End Round Pine Trail Adam Run Marwell Curry Twinsburg Twinsburg Darrow Curry Darrow N. End Round Twinsburg Waynesboro Evans Way E. End (Cul-de-Sac) Spruce Spruce N. End (Cul-de-Sac) E. Dead End. Estate Ravenna E. End (Cul-de-Sac) Twinsburg Curry McCausland Trisch Cir. E End Round Crack Sealing is used to close small cracks in hot mix asphalt roads. This prevents water from entering the pavement and causing pot holes or damaging the road base. The engineer’s estimate for this year’s contract is $245,810.00 and bids will be opened on July 6, 2011. This project involves the County Engineer, the City of Akron, and Bath, Copley, Northfield, and Twinsburg Townships. The work will be performed in September, and October. 2011 Summit County Spot Paving Program Owner Road From To S. Main St. (center lanes only) Quick Rd. Cleveland-Massillon Medina Line (various locations) Everett Rd. Bridge deck Graybill Rd. Bridge deck Reimer Rd. bridge deck Warner Rd. Top of hill Turn Lane at Lowes SR 18 over Riding Run over Heckman Ditch over Van Hyning Mallard Point to 2000' east Curry Lane Darien Lane Evans Way Pam Ct. Park Ridge Ave. Ridgetop Dr. Widel Dr. At 1815 Curry Lane As Marked out At 3151 and 3161 Evan Way At 9465 and 9473 Pam Ct. At 7893 Park Ridge Ave. At 1466, 1477, 7845, 7855 At Twinsburg Rd. Summit County Engr Twinsburg Twp SR 303 The Spot Paving Program addresses pavement deterioration that is more extensive than a pothole but still does not require complete resurfacing. Additionally, this contract is used to resurface bridge decks. Karvo Paving Co. is the contractor for this year’s Spot Paving Program. This contract includes the Summit County Engineer’s Office and Twinsburg Township. The value of this year’s contract is $185,825.00 and will be performed in August, and September. Pavement Technology, Inc. is the contractor for this year’s Asphalt Rejuvenating This contract includes the Summit County Engineer’s Office, Bath Township, Twinsburg Township, and the City of Akron. 2011 Summit County Pavement Marking Program The Pavement Marking Program involves applying new centerline and edge lines to roads as required. J.D. Striping & Services, Inc. is the contractor for this year’s Pavement Marking Program. This contract includes the Summit County Engineer’s Office and Copley, Sagamore Hills, and Twinsburg Townships. The City of New Franklin has also expressed interest on joining this program and will be added to the contract as a change order. The value of this year’s contract is $81,173.40 and will be performed in September and October. Northampton Road Bridge Replacement This project removes and replaces the Northampton Road Bridge over Mud Brook located in the City of Cuyahoga Falls. The existing bridge was built in 1930 and is nearing the end of its useful life. Workman Industrial Services is the contractor for this project. The value of this contract is $542,415.80 and will be performed in August, September and October. 80% ($433,932.64) of the cost of the project is federally funded and the remaining 20% ($108,483.16) of the project is funded by local Summit County Engineer funds. The bridge will be closed for approximately 60 days and traffic will be detoured. Twinsburg Road Culvert (SCE) This project replaces the road culvert under Twinsburg Road between Brandywine Road and Schoepf Drive in Northfield Center Township. This office is currently in the process of selecting a contractor. The Engineer’s Estimate for this work is $21,976.55. We anticipate that the work will be performed in September. The contractor has the option of closing the road and detouring traffic for up to 60 consecutive hours. 2011 SCE Culvert Replacement Program This project is in the final stages of design. The following culverts are under consideration for replacement this year: - Culvert under Cottage Grove Road between Klinger and Cope in Coventry Township - Culvert under Boyden Road just north of Barton Road in Sagamore Hills Township - Culvert under Boyden Road just north of Barton Road in Sagamore Hills Township - Culvert under Medina Line Road just south of SR 303 in Richfield Township The value of this work is estimated to be $120,000.00 and the work should be performed in October and November. (NOTE: Unless otherwise stated, traffic will be maintained and 100% local funds (SCE/Townships/Cities) will be used for each project listed above.)
© Copyright 2026 Paperzz