LESS project updates 2nd Project Management Board Meeting M. Sitko 2/02/2017 LESS Project Updates 1 LESS procurement Components Company Ordered Delivered Transferred to UK YES YES YES Lenses and supports Thorlabs Mirrors Layertec YES YES YES Supports and mounting elements Newport (MicroControle) YES YES YES Displacement sensor Micro-Epsilon YES YES YES Stages Aerotech YES YES YES Laser Coherent YES NO (9 FEB) NO Optical fibre GLOphotonics YES NO (13 MAR) NO 2/02/2017 LESS Project Updates 2 Visit in Dundee • The laser bench for segmented COLDEX beam screen is working • Instructions on cleaning of the laser bench and handling the COLDEX segmented tubes has been given • Treatment is done in nitrogen (laminar flow) 2/02/2017 LESS Project Updates 3 First results • First treatment trials of the dummy sample were tested E. Garcia-Tabares Valdivieso 2/02/2017 LESS Project Updates 4 COLDEX treatment progress 1x + 8x Courtesy R. Salemme TBD #8 OK #7 NOK #2 OK #3 NOK #1 OK #5 NOK #6 OK @CERN @CERN @CERN @CERN @CERN #4 OK @CERN Welding direction 2/02/2017 LESS Project Updates 5 COLDEX treatment progress Tube #3: bright spots observed of unknown origin Tube #5: surface scratches created due to nitrogen tube touching the surface Tube #7: problems with autofocusing #3 #3 2/02/2017 #5 LESS Project Updates 6 Functional specifications No changes with respect to the version presented in Paris. SEY<1 for primary electron energy below 1 keV No dust particles larger than 25 µm, influence of multiple smaller particles to be studied Outgassing rate: increase of a factor 100 after 10h of pumping is considered acceptable Impedance: a factor ~2 increase is considered acceptable Exposure to radiation damage over the 15 year lifetime of the HLLHC Properties of LESS surface shall not be changed by mechanical loads induced by magnet quenches Documents in EDMS: #1747550: Requirements for Laser Engineered Surface Structures (LESS) Treatment of Inner Triplet and D1 Vacuum Chambers in IR2 and IR8. #1752638: Requirements for Laser Engineered Surface Structures (LESS) Treatment of COLDEX Beam Screen. 2/02/2017 LESS Project Updates 7 Summary 1. Procurement for the laser bench is finished. 2. Segmented COLDEX beam screen treatment is going well. 3. First results obtained from the dummy sample are very promising. 4. COLDEX installation previewed in March. 5. No changes in functional specifications BUT the test campaign should be planned to study LESS properties (outgassing, impedance, dust, irradiation, mechanical) and to choose optimal laser parameters. 2/02/2017 LESS Project Updates 8
© Copyright 2025 Paperzz