Attachment 3 Page 1 of 4 30027 Procurement Plan I. General 1. Project information: Kenya, Energy Sector Recovery Project Project Implementing Agencies: Ministry of Energy (MoE), Kenya Electricity Generating Company (KenGen), Kenya Power and Lighting Company (KPLC). 2. Bank’s approval Date of the Procurement Plans: May 28, 2004 3. Date of General Procurement Notice: June 1, 2004 4 Period covered by these Procurement Plans: July 2004 – December 2005 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement. 2. Procurement Method 1. 2. 3. 4. ICB (Supply & Installation) NCB (Supply & Installation) ICB (Goods) NCB (Goods) Prior Review Threshold (US$ equivalent) 500,000 500,000 250,000 50,000 & 250,000 Comments ALL First Two Contracts ALL First Two Contracts 2. Prequalification. Bidders for: (i)Turnkey EPC Contract (Olkaria II Generating Extension); (ii)Supply and Installation of Substations (Lot 1) and (iii) Supply and Installation of Distribution Lines (Lot 1) shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for ….. (as per paragraph. 3.17 of the Guidelines: N/A. 4. Reference to (if any) Project Operational/Procurement Manual: Items to be financed under ….. procured in line with rules in the Operational Manual: N/A 5. Any Other Special Procurement Arrangements: N/A Attachment 3 Page 2 of 4 6. Procurement Packages with Methods and Time Schedule (Summary) 1 2 3 Ref. No. 1. 2. 3. 4. 5. Contract (Description) Turnkey EPC Contract (Olkaria II Generating Extension, including Turbine Generating Unit of 35 MW, 45 MVA 11/220kV Step up Unit Transformers, Switchyard & Powerhouse Extension, Steam Gathering Systems) Substations & Transformers Lot 1: Supply and Installation of Substations. Lot 2: Supply of Transformers Distribution Lines Lot 1: Supply and Installation of Distribution Lines. Lot 2: Supply of Distribution Cables Energy Meters (Supply Only Testing and Monitoring Equipment for Petroleum Product 4 Procurement Prequalificat Method ion (yes/no) 5 6 7 8 Domestic Preference (yes/no) Review by Bank (Prior / Post) Expected BidOpening Date Comments/ Completion Date ICB YES NO PRIOR 01/04/05 03/2007 ICB YES NO PRIOR 11/19/04 11/2009 ICB NO NO PRIOR 02/18/05 02/2008 ICB YES YES PRIOR 12/13/04 12/2009 ICB NO YES PRIOR 03/18/05 03/2008 ICB NO NO PRIOR 01/14/05 01/2008 ICB NO YES PRIOR 12/14/04 07/2005 Note. ICB: International Competitive Bidding NCB: National Competitive Bidding III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method 1. 2. 3. 4. 5. QCBS (Firms) Single Source (SS)/Firms/ Individual Individual Consultants (IC) Consultant Qualification (CQ) Training Prior Review Threshold (US$ equivalent) >100,000 All >50,000 N/A ALL Comments ALL ALL ALL TOR ALL 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $200,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. This may include the "Environmental audit" at the end of the project and "M&E study" 3. Any Other Special Selection Arrangements: N/A Attachment 3 Page 3 of 4 4. Consultancy Assignments with Selection Methods and Time Schedule 1 Ref. No. 2 Description of Assignment 3 4 5 6 Selection Method Review by Bank (Prior / Post) Expected Proposals Submission Date Comments/ Completion Date QCBS PRIOR 09/16/05 04/2006 QCBS PRIOR 08/05/04 12/16/04 QCBS PRIOR Contract Awarded Completed CQ POST Completed CQ POST QCBS PRIOR QCBS PRIOR Contract Awarded Contract Awarded Contract Awarded 08/10/04 QCBS PRIOR 09/16/04 09/2009 QCBS PRIOR 07/2004 CQ POST Contract Awarded Contract Awarded QCBS PRIOR 07/28/04 10/2006 CQ POST 01/19/04 01/2005 QCBS PRIOR 04/22/04 06/2005 I/C PRIOR 07/28/04 10/2006 IC PRIOR 11/18/04 06/2005 QCBS PRIOR 10/14/04 10/2005 I/C POST 10/21/04 10/2006 QCBS PRIOR 01/19/05 01/2006 KENGEN 1. 2. 3. 4. 5. 6. 7. Business Plan for Geothermal Development Company (KenGen) Study for Geothermal Reservoir Optimization (KenGen) Feasibility Study of Kipevu Combined Cycle Power Plant (KenGen) Environmental Impact Assessment of Kipevu (KenGen), Einvironmental Impact Assessment of Olkaria II 3rd Unit (KenGen) Design of Functional Specification for Olkaria II 3rd Unit (KenGen) Supervision of Turnkey EPC Contractor for Olkaria II 3rd Unit (KenGen) 06/2004 08/2004 03/2008 KPLC 8. 9. 10. 11. Distribution Supervision Services (KPLC) Distribution Upgrade Feasibility Study (KPLC) Environmental and Social Impact Assessment of Distribution Upgrade (KPLC) Management Services for KPLC Recovery Program (KPLC) Completed MoE 12. 15. Environmental Impact Assessment for LPG Import (MoE) Study of LPG Demand in Kenya and the Region (MoE) Project Coordinator and Power Engineering Advisor (MoE) Petroleum Sector Regulation(MoE) 16. Regulator (ERB) 17. Advisory Services (MoE) 18. Design of LPG Import Handling, Storage and Bottling (MoE) 13. 14. MOE, KenGen, and KPLC will send IDA their annual training plans for IDA’s no-objection. Note. QCBS CQ L/S I/Q S/S = = = = = Quality-and Cost Based Selection Selection Based on Consultants' Qualification Lump Sum Individual Qualifications Single Source Attachment 3 Page 4 of 4 IV. Implementing Agency Capacity Building Activities with Time Schedule 1. In this section the agreed Capacity Building Activities (some items could be from CPAR recommendation) are listed with time schedule No. Expected outcome / Activity Description Estimated Duration Start Date 1 The PITs staff will attend short training courses on contract administration and management, and one or more of the World Bank external procurement workshops held in the region. Selection of Project Coordinator and Power Engineering Advisor for MoE PIT. One month Nov. 2004 Continuous Prior to project effectiveness Continuous 2 Comments/ Completion Date Dec. 2004 3 Staff who will be processing procurement under the project should familiarize themselves with the new WB-Procurement Guidelines, procurement plan and SBDs dated May 2004. Continuous By Project Launch Continuous 4 Continuous Immediately Continuous 5 Each PIT will incorporate Procurement Data Management/Filing Assistants who will be responsible for filing and monitoring all procurement documents KPLC Management Training Program Continuous Immediately Continuous 6 KenGen Training Program Continuous Immediately Continuous 7 The PITs staff will acquaint themselves with the National Procurement Regulations. Continuous Immediately Continuous 8 MoE Training Program Continuous Immediately Continuous 9 Study Tours for ERB Staff Continuous Immediately Continuous 10 KPLC Staff Development Program Continuous Immediately Continuous ProcurementPlan Ext
© Copyright 2026 Paperzz