Public Notice Advertising Costs for EPA-issued Permits (FY13 to FY15) Permit Applicant Permit Type (NSR, TV, OCS) Cost FY13 Cost FY14 Cost FY15 partial (5 months) Region 1 No EPA permits reported Region 2 Energy Answers – Puerto Rico NSR $3,018.00 Region3 Permit 1 (unspecified) NSR $858.08 Region 4 Permit 1 (unspecified) Permit 2 (unspecified) Permit 3 (unspecified) Permit 4 (unspecified) Permit 5 (unspecified) Permit 6 (unspecified) Permit 7 (unspecified) Permit 8 (unspecified) Permit 9 (unspecified) Permit 10 (unspecified) Permit 11 (unspecified) Permit 12 (unspecified) Permit 13 (unspecified) Permit 14 (unspecified) Permit 15 (unspecified) Permit 16 (unspecified) Permit 17 (unspecified) Permit 18 (unspecified) Permit 19 (unspecified) Permit 20 (unspecified) Permit 21 (unspecified) OCS OCS OCS OCS OCS OCS OCS OCS OCS OCS OCS OCS OCS OCS OCS OCS OCS OCS OCS OCS OCS $555.42 $603.50 $695.64 $612.18 $496.23 $542.50 $160.74 $464.00 $592.40 $232.80 $63.76 $483.98 $278.19 $1,680.90 $805.42 $1,087.50 $643.20 $637.71 $573.05 $1,087.50 $825.60 Region 5 Permit 1 (unspecified) Permit 2 (unspecified) Permit 3 (unspecified) Permit 4 (unspecified) Permit 5 (unspecified) Permit 6 (unspecified) Permit 7 (unspecified) Permit 8 (unspecified) Permit 9 (unspecified) Permit 10 (unspecified) TV TV NSR NSR NSR NSR TV TV TV TV $88.05 $109.25 La Paloma Energy Center, LLC Chevron Phillips - Chem Lyondell Basell – (Equistar Chemical Permit 3 – La Porte) Lyondell Basell – (Equistar Chemical Methanol Unit Restart) Copano Energy Invista PL Propylene LLC KM Liquids Terminal NSR NSR $733.35 $598.00 NSR $733.66 NSR $4,969.66 NSR NSR NSR NSR $453.15 $1,188.00 $4,827.82 $4,827.82 $71.50 $225.00 $201.44 $543.50 $140.74 $208.50 $516.60 $957.00 Region 6 Public Notice Advertising Costs for EPA-issued Permits (FY13 to FY15) Targa Gas Processing, Longhorn Gas Plant Lyondell Basell (Equistar Chemicals Permit Channel View – Olefins 1 and 2 ONEOK Exxonmobil Chemical 0 Baytown Olefins Plant Celanese, Clear Lake Occidental Chemical Corp, Ingleside Chemical Plant Diamond Shamrock, Valero-McKee Refinery Exxonmobil Chemical, Mont Belvieu Plastics Plant DCP Midstream – Jefferson County NGL Fractionation Air Liquide Large Industries, Bayou Generation Plant Rohm & Haas Inc Deer Park Freeport LNG CCL, Sinton Compressor Station Chamisa CAES at Tulia, LLC APEX, Bethel APEX, Matagorda Energy Ctr CCL, LNG Terminal Equistar Chemical, Olefins Plant Expansion Project NSR $675.00 NSR $4,969.56 NSR $546.00 NSR $540.00 NSR $709.38 NSR $267.75 NSR $511.00 NSR $540.00 NSR $543.21 NSR $727.00 NSR NSR NSR NSR NSR NSR NSR $469.10 $566.40 $317.20 $355.20 $596.25 $487.50 $317.20 NSR $1,494.35 Enterprise Products, Mont Belvieu Complex (Propane Dehydrogenation Unit) NSR $524.60 Lone Star Fractionators Mont Belvieu Frac III NSR $524.60 FGE Power, LLC Indeck Wharton Energy Center NSR NSR $303.80 $367.65 Dow Chemical Co – Light Hydrocarbon 9 NSR $460.80 NSR $221.50 NSR $1,060.80 Golden Spread Elec Co-op, Antelope Station NSR $1,016.10 C3 Petrochemicals Voelstapine Stahl GmbH ONEOK Invenergy Thermal Dev NSR NSR NSR NSR $358.80 $362.95 $421.40 $564.00 Tenaska Roans Prairie Generating Station NSR $388.80 OCI Beaumont Pinecrest Energy Center Formosa Plastics Corp – gas turbines NSR NSR NSR $503.53 $700.00 $271.00 Formosa Plastics Corp – olefins expansion NSR $305.00 Formosa Plastics Corp – LDPE plant CCI Corpus Christi NSR NSR $290.00 $1,373.35 Occidental Chemical Corp, Ingleside Chem Plant, Ethylene Plant Flint Hills Resources Corpus Christi LLC Public Notice Advertising Costs for EPA-issued Permits (FY13 to FY15) Austin Energy Sand Hill Energy Ctr Natural Gasoline Victoria Power Station Lon C Hill STEC Red Gate Nuevo Midstream M&G Corpus Christi Combined Heat and Power Plant Guadalupe Power Partners LP Magellan Terminal Holdings Tenaska Brownville NSR NSR NSR NSR NSR NSR $1,789.20 $483.69 $1,789.20 $1,409.65 $909.00 $479.88 NSR $1,566.95 NSR NSR NSR $1,148.65 $1,439.90 $1,214.70 Region 7 No EPA permits reported Region 8 QEP Field Services – Island Compressor Station & Coyote Wash Compressor Station QEP Field Services – Wonsits Valley Compressor Station & Chapita Compressor Station Monarch Natural Gas – Riverbend Compressor Station CCI San Juan, LLC – Barker Creek Compressor Station Deseret Power Electric Cooperative Bonanza Power Plant Deseret Power Electric Cooperative Bonanza Power Plant TV $200.00 TV $209.00 TV $210.25 TV $162.67 NSR $1,162.55 TV $1,209.40 $814.84 Region 9 No EPA permits reported Region 10 Stimson WSFP Mickelson Pioneer Empire Lumber Washington Beef Mickelson Blue North Peterson Williams Yakima Forest Products TV TV Non TV Non TV TV TV Non TV TV Non TV Non TV TV $340.20 $487.92 $464.99 $613.71 $534.21 $636.25 $401.04 $430.93 $471.07 $588.00 $606.65 Totals Total cost per FY Total permits per FY Total cost per permit FY 13 Total: FY 14 Total: FY 15 Total to Date: $40,333.60 $35,868.92 $8,614.10 39 56 11 $1,034.19 $640.52 $783.10 Note: Costs only include advertising cost charged by the newspaper. No miscellaneous or indirect costs (e.g., cost of employee) are included. Totals for FY13-15: $84,816.62 106 $800.16
© Copyright 2025 Paperzz