Installation manual Two-wing door behind the

Imstallation manual EN
Two-wing door
Installation BEHIND the building opening
REV1006
A
3 Frame profile
B
1 Building construction
2 2KV - Installation BEHIND the building opening
C
4 Left wing
5 Assembly L
D
List of necessary tools
6 Right wing
TOORS
W_TOORS
x
H_TOORS
Screw driver
Boring machine
Measuring tape
H
W
Rivet tool
TOORS
Spanner 10
Allen wrench 8
TOORS
W_TOORS = W
H_TOORS = H
Packing content Not included in packing
Air level
OK
OK
Imstallation manual EN
Two-wing door
Installation BEHIND the building opening
REV1006
F
E
TOORS
7 M10x16
9 ST6,3x25
12 ST4,8x19
G
8 Locking shoe
10 Washer
13 Angle bracket
11 Blinder
14 Rivet 4x8
D1
H
E1
D2
E2
U1=U2
5
9
10
D
E
7
U1
U2
5 Tighten througt the closer bar
Imstallation manual EN
Two-wing door
Installation BEHIND the building opening
REV1006
I
J
E1
E2
D1
D2
A
A
L
K
1
EXTERIOR
13
12
12
INTERIOR
TOORS
CUT A-A
Imstallation manual EN
Two-wing door
Installation BEHIND the building opening
REV1006
Alternative
to point K
M
N
D2
TOORS
D1
11 Push
5
O
P
10
5
9
D1
TOORS
8
D2
14