Power Failure XYZ Port Facility Maritime Security Drill Briefing for Controllers date Power Failure Emergency Response – Contingencies Power Failure Drill D421 Power Failure Scope • Date, time, location • Aim • Objectives • Desired outcomes • Controllers • Players • Materials • Scenario • Master Events List • Controller Tasks • Communications • Safety • Debrief Power Failure Drill number: X/XX Date: Start Time: Location: Estimated End Time: Power Failure Aim To enhance the proficiency of port facility staff in responding to a power failure Power Failure Objectives • Operations staff to switch on backup power within the time limit as specified in the PFSP • Security staff to respond to power failure according to procedure in the PFSP. Power Failure Desired outcomes Staff will be able to: • Switch on backup power quickly in the event of a main power failure. • Respond appropriately to a power failure. Power Failure Control Team • Chief Controller: PFSO, Mr. AAA • Controllers Chief Electrical Engineer – Mr. XXX Electrical Engineer – Mr. YYY • Safety officer Power Failure Players • Security staff on duty • Operations staff on duty Power Failure Materials • Selected lighting zone in the Port Facility . Power Failure Scenario There has been several blackouts in recent times. Staff have to be prepared to get the electrical supply available again quickly and to additional measures to ensure the security of the port facility is not compromised while electrical supply is not available. Power Failure Master Events List S/N Time 001 1930 002 1935 Event All participants in position Drill commence From To Means of Delivery Chief Controller All Walkie Talkie 003 1955 Security lighting failed Controller 004 2100 Drill completed Chief Controller 005 2101 Restore main Chief and Controller emergency power supply Hot Wash Chief Controller 006 2130 Expected Response None Security Physically Inform ops staff cut off department, take power actions to maintain security All Walkie Dispersal of Talkie personnel/ equipment All Restore all services All N/A Remarks “Drill Start” “Drill End” Tested to be fully functional Power Failure Controller Tasks • Select an area where both main and backup power can be isolated. • Shut down the power at the appropriate time. • Main and backup power to be restored at the end of the drill Power Failure Communications • Mobile phone • Walkie-Talkie Player – Ch YY Controllers – Ch ZZ Power Failure Code words Drill Start The drill is to commence Drill Suspend The drill is temporarily suspended Drill Go The drill is to resume from where it was suspended Drill Stop The drill is to be terminated (prematurely) Drill End The drill is completed Drill, Drill, Drill The message or statement that follows this preamble relates to the drill only, and is not to be confused with real activity Power Failure Safety • Physical safety of personnel is paramount • There is to be no physical contact between player and controllers acting as intruders, etc. • Security staff are not to use abusive language when talking to controllers acting as “intruders” • Do not neglect the safety of equipment Power Failure Debrief • Location: • Secretary: • Attendance Power Failure Any questions ?
© Copyright 2026 Paperzz