Behind the Glass Door Starring: John Heinzel CAPT, CEC, USN Commanding Officer NAVFAC Southeast 1 NAVFAC Southeast 10/14/2011 10/14/2011 Coming Attractions • NAVFAC SE: Who we are, What we do • Design Standards • Energy • Safety ** Bonus Feature: Haiti 3 NAVFAC Southeast 10/14/2011 NAVFAC SE Area of Responsibility 4 NAVFAC Southeast NAVFAC SE Design Standards • Primary Standards o o o o o o Unified Facilities Criteria International Building Code 2009 Anti –Terrorism Force Protection (ATFP), UFC 40010-01 USGBC LEED Gold ASHRE 90.1-2010 Whole Building Design Guide • Individual base requirements: IAP, Force Protection, Airfield criteria, etc • Source selection for Design Build often evaluates design approach for best value: TOC and mission viability • Competing priorities i.e. Energy, ATFP, Environmental, Cost require thoughtful design 5 NAVFAC Southeast 10/14/2011 Energy Reduction Progress 2003 Baseline MBTu/KSF Where we need your help 6 Our challenge NAVFAC Southeast 10/14/2011 Humid Humid is a term used to describe the NAVFAC SE Area of Responsibility. This area encompasses seven states (South Carolina, Georgia, Florida, Mississippi, Alabama, Louisiana, and Texas) as well as Guantanamo Bay Cuba and other parts of the Caribbean. 7 NAVFAC Southeast 10/14/2011 Energy Moisture in the air is a contaminant 8 NAVFAC Southeast 10/14/2011 SE Energy Discussion • Technology o Controls o Magnetically levitated centrifugal compressors o LED lighting, induction lighting o Insulation, solar hot water o More efficient chillers, glazing, plumbing fixtures o Metering and smart grid • Cost/Benefit o Building lifecycle > 67 years o Maintenance cost on specialty items particularly important o Limited ability to source select o Economic difference within region: Key West, GTMO 9 NAVFAC Southeast 10/14/2011 Total Ownership Cost: Best Value Example “Super High Efficiency” “Code Minimum” “High Efficiency” LCCA Comparison – Three Chillers Air-Cooled, Variable Air-Cooled, Constant Air-Cooled, Scroll, Speed, Magnetically (50,000 SF Building) Multi-Compressor Speed, Rotary Screw Levitated Centrifugal Chiller (12.5 yr life) Chiller (25 yr life) Chiller (25 yr life) First Cost Maintenance & Replacement Annualized Cost Annual Energy Bill 25 yr Present Value 10 $62,500 $75,000 $125,000 $6,299 $400 $200 $71,800 $67,190 $47,170 $1,409,094 $1,251,945 $949,854 NAVFAC Southeast 10/14/2011 Source Selection • Selecting contractors on what is important o Sustainability o Safety • Sustainability factor o LEED scorecard and narrative o EPAct 2005 energy efficiency narrative o Whole Building Energy simulation • Safety factor o Experience Modification Rate (EMR) o Days Away from work, job Restriction or Transfer (DART) o Safety narrative: Prime’s plan for selecting safe sub-contractors • Subcontractor criteria o Contract provisions requires primes to hire only subs with good safety records: EMR < 1.1 and DART rate < 3.0 o Compliance with USACE EM385 is mandatory • Safety is a critical factor in contract completion evaluation (CCASS) 11 NAVFAC Southeast 10/14/2011 Shaw AFB Mishap • In Dec 2009, a sub-contractor employee was crushed between a second-story steel I-beam and a falling steel roof I-beam. • Other workers were attaching a second beam to the other side of the column supporting the beam that fell, no “seat” was in place under the first beam. o Prime ktr had a subcontractor employee killed on a separate DoD contract the previous year. o The prior subcontractor death did not reflect in prime’s EMR. o 45 days of lost productivity due to mishap investigation. No seat or connection device 12 NAVFAC Southeast 10/14/2011 MCLB Albany Mishap • In Mar 2011, a laborer in Albany was shocked when he touched the headache ball on a crane which had contacted an overhead power line. • Victim’s heart stopped three times, but he was revived each time and is recovering. o The victim was an employee of a second-tier sub-contractor that had an EMR of 1.33 o Would not meet current sub-contractor safety criteria. o Two months of lost productivity due to mishap investigation. 13 NAVFAC Southeast 10/14/2011 14 NAVFAC Southeast 10/14/2011 15 NAVFAC Southeast 10/14/2011 Haiti 16 NAVFAC Southeast 10/25/2011 Community Clusters 17 NAVFAC Southeast 10/14/2011 Emergency Operation Centers 18 NAVFAC Southeast 10/14/2011 Haiti 19 NAVFAC Southeast 10/14/2011 20 NAVFAC Southeast 10/14/2011 The End A NAVFAC Southeast Production ©MMXI 21 NAVFAC Southeast 10/14/2011
© Copyright 2026 Paperzz