Final Thoughts MS Project is only a tool

URBS 609 Project, Unit 1
Introduction and Background
This training module was crafted using
PowerPoint by Microsoft Corporation. It has been
packaged with PowerPoint Viewer, a standalone
Microsoft product that allows a user to view this
module without use of PowerPoint.
 Left mouse-click or enter to go to next slide
 Right mouse-click or backspace to go to previous slide
 ESC to exit this module
This Unit of Instruction was crafted by Robert Hugg For Minnesota State University, Mankato Urban and Regional Studies Institute - 2004
Urban and Regional Studies Institute
2

This module will provide:
Introduction to the background of MS Project
 Introduction to the Advantages of using MS Project
 Introduction to the Hazards of using MS Project
 Tips for using MS Project
 Background material for project planning


This module is constructed as the first of three
blocks in a building block approach
Urban and Regional Studies Institute
3


The first assumption of any project planning is
that the project goal and tasks are defined
MS Project uses the same assumptions as
planning a project manually:




All tasks have distinct begin and end points
All estimates can be mathematically derived
Tasks must be able to be arranged in a defined
sequence that produces a pre-defined result
Like any tool, MS Project cannot define the goal
of a project, the user must do that
Urban and Regional Studies Institute
4

MS Project is a strong tool that is built around the
PERT and CPM basics




(See PERT/CPM blocks of instruction to review the
basics if these terms are unfamiliar)
Based on same basic PERT calculations invented
in 1958
Based on same basic CPM calculations invented
in 1958
Incorporates use of a WBS (Task list) format
invented in the 1960s
Urban and Regional Studies Institute
5

A highly visual, yet checklist-intensive
program


The most widely used PM program because:





Balances visual approach (charts, graphs, etc) with
logical structured approach (task and resources lists)
It is fairly generic in its approach
Highly automated once configured; requires
relatively low amount of user manipulation
Scalable – can be used for small to enormous projects
A cost-effective choice for casual users
Easy to use core techniques

Advanced techniques are complex, however
Urban and Regional Studies Institute
6



Good step-by-step tutorial for beginners
Good searchable keyword help function
Based on data entry – once configured, user enters data
and Project automatically:

Computes all times and costs
 Optimistic, Pessimistic, Likely and PERT- expected






Identifies Critical Path, computes late & early start dates, slack
Computes % complete on a task and project level
Identifies areas of over-tasking of resources
Draws a wide ranges of charts and graphs specific to the project
Creates a wide range of reports specific to the project
VERY customizable to meet individual user needs
Urban and Regional Studies Institute
7
Sample MS Project Charts and Diagrams

Based on configuration and data entered by
the user, MS Project plots Gantt Charts
Urban and Regional Studies Institute
8
Sample MS Project Charts and Diagrams
• Based on configuration and data entered by
the user, MS Project plots Task Calendars
Urban and Regional Studies Institute
9
Sample MS Project Charts and Diagrams
• Based on configuration and data entered by
the user, MS Project plots Network Diagrams
Urban and Regional Studies Institute
10
Sample MS Project Charts and Diagrams
• Based on configuration and data entered by
the user, MS Project plots Resource Graphs
Urban and Regional Studies Institute
11
Sample MS Project Tables and Reports
• Based on configuration and data entered by
the user, MS Project plots Tabular Data
Urban and Regional Studies Institute
12
Sample MS Project Tables and Reports
• Based on configuration and data entered by
the user, MS Project plots Tabular Tracking Data
Urban and Regional Studies Institute
13
MS Project Strengths
Sample MS Project Tables and Reports
• Based on configuration and data entered by
the user, MS Project plots High Level Reports…
Urban and Regional Studies Institute
14
MS Project Strengths
Sample MS Project Tables and Reports
• …to-do lists on a person by person basis…
Urban and Regional Studies Institute
15
MS Project Strengths
Sample MS Project Tables and Reports
• …lists of tasks that should have started but have
not…
Urban and Regional Studies Institute
16
MS Project Strengths
Sample MS Project Tables and Reports
• …lists of tasks that are scheduled to begin
soon…
Urban and Regional Studies Institute
17
MS Project Strengths
Sample MS Project Tables and Reports
• …lists of critical tasks (makes it easy to identify
tasks that become critical once a project is
crashed)…
Urban and Regional Studies Institute
18
MS Project Strengths
Sample MS Project Tables and Reports
• and much, much more
• All charts, diagrams, and reports are designed to
help a manager organize and track a project
• All come in a standard configuration
• Most typically used information
• Easiest to read format
• All are also customizable to show the most
meaningful data
Urban and Regional Studies Institute
19
MS Project Strengths


Flexible and customizable
Designed to enhance communication




Between manager and workers
Between managers and stakeholder
A good tool to manage expectations
Charts, diagrams, tables etc can be saved in
various formats for use:

On the web, in print, electronically
Urban and Regional Studies Institute
20
MS Project Weaknesses

Makes it easy to lose touch with the project –
very automated

Automates all calculations
 Scheduled dates, costs projected dates, etc
 Tracks when a resource is over-allocated but does not
provide a warning when it happens
 Conflicts are not intuitively displayed


Will “let” a project get over budget/over-time
A tool that must be monitored when used
Urban and Regional Studies Institute
21
MS Project Weaknesses

No Risk Assessment Function

Does not calculate probability of completion
 A Key weakness – this info is always requested
 A Manager must compute this manually/with Excel

Crashing costs/times are not calculated
 Must be computed on a task basis and then compared to the
baseline (or done manually)
 Assumes manual intervention by Project Manager
 Crash the project manually and save as a new baseline

Project is heavily influenced by the Earned Value
method (EVM)– typical Risk Assessment is not a
factor in EVM
Urban and Regional Studies Institute
22
MS Project Benefits





Review
Much less work for a user compared to
manual/MS Excel project planning
Does most of the required calculations
Wide range of graphs, charts, reports
Very customizable, very flexible
Makes communicating project status easier –
expectation management
Urban and Regional Studies Institute
23
MS Project Hazards


Review
Very Automated – easy to lose touch
No Risk Assessment function


Must be done in MS Excel/manually
Based on PERT/CPM but also influenced by
EVM


Weighs by project/task costs, not just completion
Does not consider intangible progress that is
common in Social Sciences projects
 Knowledge as part of the process, not just the result
 Progress as part of the process not just task completion
Urban and Regional Studies Institute
24
Tips for Using MS Project








Know the project goal before beginning
Know the required tasks before beginning
Identify resources before beginning
Identify task relationships before beginning
Refer to the tutorial as often as needed
Refer to help section as often as needed
Keep the configuration as simple as possible
Avoid losing touch with the project
Urban and Regional Studies Institute
25
MS Project
Final Thoughts
• MS Project is only a tool –it does not create or
•
•
“own” the project – it reflects the data provided
The simpler the configuration, the easier the data
will be to understand, for all involved
If the plan doesn’t look right, it probably isn’t
– Check resource and task assignments/relationships
– Check constraints and dependencies
– Look for what has changed in a plan and follow the
clues - a small unintentional change can wreak havoc
Urban and Regional Studies Institute
26




Dr. Anthony
Filipovitch
MS Project, by
Microsoft Corporation
MS Excel, by Microsoft
Corporation
PM Body of
Knowledge (PMBOK),
Philadelphia: PMI,
2000

Project Management
Institute (PMI)
Resource Center

Project Management
Institute Website
Urban and Regional Studies Institute
27
You have completed
URBS 609 Project Unit 1
Please proceed to
URBS 609 Project Unit 2
This Unit of Instruction was crafted by Robert Hugg For Minnesota State University, Mankato Urban and Regional Studies Institute - 2004
Urban and Regional Studies Institute
28