SECTION 1 - GENERAL INFORMATION REPORTING PERIOD PROJECT DURATION 01.07.2011 - 30.09.2011 14.03.2011 14.03.2013 PRIORITY AXIS AREA OF INTERVENTION PROJECT TITLE 2. Accessibility 2.1. Development of the road & railway network “A Way To-Gather:Construction of the road Zlatograd-Bordercrossing Point “Zlatograd” – Thermes – Xanthi” PROJECT ACRONYM ZLATEX SUBSIDY CONTRACT NUMBER B1.21.01 LEAD PARTNER MUNICIPALITY OF ZLATOGRAD Partner No LP (P1) P2 Partner Institution (Full Name) MUNICIPALITY OF ZLATOGRAD REGION OF EAST MACEDONIA AND THRACE LEGAL REPRESENTATIVE PROJECT MANAGER FINANCIAL MANAGER COUNTRY BULGARIA GREECE TOTAL APPROVED 1 795 640,71 € 91 763,20 € Miroslav Yanchev Elmira Ugorlieva-Pehlivanova Irina Ivanova SECTION 2 - PROGRESS ACTIVITY REPORT 2.1 Summary of the project's achievements so far The primary objective of the project "A Way To-Gather: Construction of the road Zlatograd – Zlatograd Border - Crossing Point – Thermes – Xanthi” is to improve the accessibility of the transport network on both sides of the border. The opening of the fourth transport link between Bulgaria and Greece in Zlatograd led to an increase in the passenger-flow through the BCP in both directions. This requires ensuring normal and safe vehicle traffic and development of the existing road infrastructure in the city center. In order to meet the primary objective of the project, a press conference was held that launched the implementation of the project activities. This press conference was attended by the Mayor of Zlatograd, the Deputy Regional Governor of Smolyan, the Chairman of the Municipal Council, members of the Municipal Council, crossborder management team of the project, representatives of local, regional and national print and electronic media, experts at the municipal administration. The press conference led to promoting the EU financial assistance. During the reporting period a kick-offmeeting with our Greek partner was held in order to distribute the activities of the project team, to specify the ways of communication between team members, to appoint the joint meetings, to clarify the timing of the proposed activities and the required PLC procedure. The technical design was discussed and the route of the projected communication path was reviewed. A contractor was selected to provide consultancy assistance for the preparation of the tender procedures set out in our project proposal as well as a contractor to implement the publicity and information events related to the project. A contract for project auditing was signed. At present, a procedure for the selection of a contractor for construction and mounting works and construction supervision has been announced. Documentation was prepared for the execution of a contract for author's supervision. 2.2 Summary of the project's achievements during this reporting period During the reporting period we failed to realize several payments of the project preparatory costs: preparation of the technical design under Hydrology Part and the comprehensive report assessing the compliance of the technical investment project with the essential requirements for building works. During this reporting period we filed a request for verification of the other preliminary costs of the implementation of the project which have been verified according to Annex II Certificate of verified expenditure from bulgarian controller Svetlin Gankov. Due to lack of available funds in the municipal budget, at present payment has been made for the project team’s salaries for May only, as well as the rent for the office for that month. By mutual agreement the rental contract for the office has been terminated since September. On 27 September 2011 the tenders of the tenderers for implementation of construction and mounting works under the project were opened. Currently they are under evaluation. The project website was prepared with content provided in Bulgarian and English. Our Greek partner is preparing the translation of the site into Greek. The website can be seen on the temporary website http://zlatex.eu/index1htm. Preparation has started for printing the brochures on the project and the temporary and permanent sign boards. 2.3 Analytical description of the implemented actions, outputs and results during this reporting period with reference per work package and partners' involvement. A contract for independent auditing of the implementation of the project activities was concluded in the reporting period July to September 2011. By mutual agreement the rental contract for the office was terminated and the leading organization was faced with the necessity of determining the office of the Deputy Mayor and Project Leader as the office of the project. On 27 September 2011 the tenders for implementation of construction and mounting works under the project were opened. Currently the tenders filed by seven tenderers are under evaluation. During the reporting period the design of the project website was developed, published in Bulgarian and English. The Greek version of the page is being translated by our Greek partner. The site contains all the necessary requisites according to the program guidelines for information and publicity. It provides information about the project partners, the programme funding the project activities, and information and news about the project. In August experts of the Ministry of Regional Development and Public Works inspected the project in relation to a complaint filed by the chief editor of "Zlatograd Newspaper" expressing his negative opinion on the purpose of the project. We still have no answer from the Ministry, but it should be noted that within two months prior to the application of Zlatograd Municipality with this project under European Territorial Cooperation Programme Greece-Bulgaria 2007-2013, the local people were given the opportunity to examine the idea and purpose of the urban development route through the special information area on the ground floor of the building of the municipal administration, on the official website of the municipality, at the public discussions and workshops held in different parts of the town the minutes of meeting of which are stored in the municipal administration. The residents were able to express their written opinions in the book for reviews, recommendations and suggestions. Only one opinion was filed which contradicts the idea of the local government to build a new contemporary vision of the town center in line with the modern requirements, as well as the proposal to solve the problems of the urban road infrastructure related to the scarcity of parking spaces and the increased tourist flow to Zlatograd. This view was expressed by Mr. Ushev, the aforementioned claimant. The press conference which in fact launched the implementation of one of the most important infrastructure projects of Zlatograd Municipality associated with the implementation of the Scheme for Urban Development and Communications Route was attended by Mr. Ushev who made no comments on the importance of the project. The Scheme for Urban Development and Communications Route was approved by the Municipal Council. It preserves the existing green architecture and along with the Concept of the Town Center provides two options for its increase, development and combination of attractive plant species. The urban development decision allows the tourists coming from and traveling to our southern neighboring country to visit and see our town instead of just passing transit through it when traveling to the larger resorts and cities. Building Permit was issued for the implementation of the construction works provided for under the project. Within the determined time limits no complaints or appeals have been lodged and the permit entered into force on 11 November 2009. The opinion of the Mayor of Zlatograd is that the statutory procedures and deadlines as per Art. 149, par. 3 and Art. 216, par.2 the Spatial Development Act have been met. 2.4 Next steps to be taken for project's implementation According to the schedule, the steps to be taken in the next quarter include the activities of the following work packages: WP 3 Construction of the road, Action 3.1 Construction works - start 01.10.2011; Action 3.2 Works and Designer Supervision - start 01.10.2011. Because of the appeal of the procedure on opening the public procurement, the execution of the contract with the company selected to carry out the construction and mounting works under the project is expected to be delayed. Despite the appeals, our expectations are within the next period to begin the actual execution of the construction works on the project so that we will have reasons to require the implementation of the first interim audit of the project. By the end of October the execution of a contract with the author team is also expected concerning the exercising author’s supervision of the project. By the end of October the project website in three languages is expected to be released on the internet. In June our Greek partner starts to prepare the strategy for management of the joint traffic and over the next quarter the necessary procedures are expected to be carried out in accordance with the Greek law concerning the realization of the activity WP 4 Development of a Joint Traffic Management Strategy Action 4.1 Development of the document; 2.5 Problems encountered and proposed solutions The main problem encountered in the process of implementation of the project activities results from the lack of available funds from the municipal budget for the operation of the project. The national co-financing is also not aligned to this reporting period. All costs which should have been paid during the first reporting period will be paid in installments during the next periods. Zlatograd Municipality finds the solution of the overall problems in taking a loan under FLAG, which will be the first step to be taken after the local elections in October 2011. On the date of filing the request for the first level of control on 24 June 2011 we submitted a request for verification of expenditures amounting to EUR 9,365.76. Due to lack of own funds for the reasons described above we could not make the planned payment of the costs, therefore costs of EUR 2,792.47 were reported. In the second reporting period we encountered the same situation again – we filed a request for verification of expenditures amounting to EUR 10,994.31 but only 3,996.22 euro were verified. Another important problem encountered under the project is related to the appealed procedure for the selection of the contractor for construction and mounting works. This carries the risk of failure to meet the scheduled deadlines for the implementation of the project activities. 2.6 Changes in the Implementation Due to lack of funding for the project activities, at present there is no reason for the implementation of auditing by the company engaged with carrying out auditing works on the project. This results in delaying the commencement of the interim audit report. The unavailability of a company selected as the contractor for the construction and mounting works on the project leads to delaying the start of the actual construction works. SECTION 3- PRIORITY THEME Code Priority Theme 01 R&TD activities in research centres 04 Assistance to R&TD particularly in SMEs (including access to R&TD services in research centres) Investment in firms directly linked to research and innovation 07 21 Motorways (TEN-T) 23 Regional / Local roads 26 Multimodal transport 45 Management and distribution of water (drinking water) 51 Promotion of biodiversity and nature protection (including Natura 2000) 55 Promotion of natural assets 56 Protection and development of natural heritage 58 Protection and preservation of the cultural heritage 59 Development of cultural infrastructure 63 Design and dissemination of innovative and more productive ways of organizing work 69 Measures to improve access to employment and increase sustainable participation and progress of women in employment. 71 Pathways to integration and re-entry into employment for disadvantaged people: 73 Measures to increase participation in education and training throughout the life-cycle 76 Health infrastructure 85 Preparation, implementation, monitoring and inspection 86 Evaluation and studies; information and communication Total Verified Expenditures during this reporting period Total verified expenditures including this reporting period 3 996,22 € 6 788,21 € 3 996,22 € 6 788,21 € SECTION 6 - PUBLICITY The preparation of the project website started during the reporting period July-September 2011 and currently we expect out Greek partner to provide its Greek version. A press conference was held launching the implementation of the project the activities. The website can be seen on the temporary website http://zlatex.eu/index1.htm. Preparation has started for printing the brochures on the project and the temporary and permanent sign boards. 3D images were made on the part of the Concept of the Town Center, which covers the communication route provided to be built under the project. These images will be used for the preparation of sign boards and brochure under the project.
© Copyright 2026 Paperzz