Risk Control Worksheet ASSESSMENT DETAILS Campus: Clayton Department: School of Physics and Materials Engineering Room No: 172 Faculty: Engineering Building: 37 Other: Assessment Date: Area/ Task/ Process Description: Cold Mounting Assessment Team: HOW TO USE THIS WORKSHEET 1. 2. 3. 4. 5. Review the identification section of each of 5 major hazard categories on the Risk Assessment Reference Sheets. Identify the relevant hazards noting the Hazard Code and briefly and separately describing each hazard associated with the work, equipment, process or work practice. (Description of Hazard) Use the appropriate matrix to assess The possible outcome presented by each hazard (Consequence) The possibility of that outcome occurring (Likelihood) The potential level of injury or illness from the outcome (Risk) Outline the preventative/corrective action (Corrective Actions/Risk Controls) Provide a realistic date by which the actions should be completed/ implemented (Outlook) Nominate the person responsible for the follow of the actions (Responsibility) CORRECTIVE ACTION PLANNING & REVIEW For each of the identified hazards that are assessed as an extreme, high or medium risk a corrective action / continuous improvement plan should be developed and reviewed as required. When developing corrective action or control strategies the HEIRARCHY OF CONTROLS should be considered. The single most important outcome of a risk assessment is to implement effective and sustainable controls to prevent or significantly reduce the chance of injury, illness or exposure. 4 levels of controls define the hierarchy. The top two levels Elimination/ Substitution and Engineering Controls are by far the most effective in preventing or reducing risks because they rely much less on human behavior, are more difficult to defeat and require much less continuing human effort than the lower level controls. HIERARCHY OF CONTROLS Most Effective Least Effective 1 Elimination / Substitution 2. Engineering Controls 3. Training and procedures 4. Personal Protective Equipment As corrective actions are planned every effort should be made to implement the top 2 levels of control. Jun-00 Hazard No. Description of Hazard Corrective Actions/ Risk Controls Epoxy Resin & Hardener fumes must not be inhaled Consequence C4 Likelihood L5 Local exhaust is recommended. Mixing Resin under fume cupboard Risk Low H9 Timing always The product contains a sensitizing substance which may provoke an allergic reaction among sensitive individuals. H9 Consequence 1. 2. H9 C4 Likelihood L5 Risk low Mixture spills and splashes while mixing. .-wear LabCoat, safety glasses and latex gloves -Samples should be clean and dry in ethanol -Plastic mounting caps need to be greased with Vaseline -Place samples in mounting caps – face down Struers Epofix and Hardener eg Struers -weigh Epofix Resin 25 parts by weight (highest capacity: 100 gms) weigh Epofix Hardener 3 parts by weight (highest capacity: 12 gms) -Mix mixture thoroughly under fume cupboard -Pour into plastic moulds -Absorb spillage with non-combustible, absorbing material. -Let it set over night Consequence C4 Likelihood L5 Risk low Responsibility user Wear protective clothing such as gloves, safety glasses and LabCoat, close toe shoes. All work needs to be done in the fume cupboard. Timing always Responsibility user Wear appropriate protecting gear such as lab coat, safety glasses, latex gloves, and close shoes. Absorb spillage with noncombustible, absorbing material using spill treatment kit located in building 37 room 179. Provide easy access to water supply and eye wash facilities. Timing immediately Responsibility user Avoid contact with skin and eyes. Wear safety glasses ,gloves and lab coat H9 Consequence C4 Likelihood L5 Risk Low Spill of solvent (water) for cleaning Timing always Dry the floor to avoid any slipping. Timing H2 Consequence C4 Likelihood L5 Responsibility user Risk low immediately Responsibility user
© Copyright 2026 Paperzz