Data used in Case Study 1 Table 4. Properties of different repair types. Repair time (h) Manual reset Grease topup Minor repair Medium repair High priority repair Annual service Technicians required Value Cost Weight of Probability of (£ ,000) (£ ,000) spares (kg) correct diagnosis 2 2 100 0 0 1 3 2 80 0.5 20 1 4 3 100 1 100 0.8 6 3 100 18.5 400 0.9 5 3 120 25 500 0.95 6 2 80 18.5 300 1 Table 5. Shape and scale parameters of the gamma distribution function. Mean (h) Shape Gamma parameter distribution Scale Parameter 2 2 Expected repair length (h) 3 4 5 3 4 5 6 6 4 6 8 10 12 0.5 0.5 0.5 0.5 0.5 Table 6. Properties of vessels used in Case Study 1. Vessel number 1 2 3 4 5 Crew capacity 12 12 12 12 12 Speed (km/h) 50 50 40 40 40 Fuel consumption Hire cost (£'000/km) (£'000/day) 0.01 0 0.01 20 0.006 0 0.006 0 0.006 10 Load capacity (kg) 2000 2000 1200 1200 1200 Table 7. Probability of transfer given wave height and type of vessel. Vessel 1 2 3 4 5 Probability of successful crew transfer in a given wave height Hs<1.4m 1.4 ≤ Hs < 1.6m 1.6 ≤ Hs < 1.8m 1.8 ≤ Hs < 2m 1 1 0.75 0.5 1 1 0.75 0.5 1 0.8 0.5 0 1 0.8 0.5 0 1 0.8 0.5 0 Figure 7. Proposed policy for Case 2 in Case Study 1. Figure 8. Proposed policy for Case 4 in Case Study 1. Figure 9. Proposed policy for Case 5 in Case Study 1. Table 8. Order of turbine visits for cases 2, 4 and 8. Case 2 Case 4 Case 5 Vessel 1 Vessel 2 Vessel 3 Vessel 4 Vessel 5 Vessel 1 Vessel 2 Vessel 3 Vessel 4 Vessel 5 Vessel 1 Vessel 2 Vessel 3 Vessel 4 Vessel 5 Probability 9.3% 60.1% 65.6% 9.7% 12.2% 69.3% 54.3% 44.8% 9.7% 27.3% 54.3% 60% 31.9% 44.8% 65.4% T95 T54 T60 T20 T52 T60 T89 T16 T20 T77 T89 T12 T77 T16 T43 T77 T90 T85 T29 T43 T12 T90 T24 T29 T43 T90 T19 T67 T24 T54 Order of visits T89 T16 T77 T89 T54 T99 T90 T99 T60 T33 T85 T33 T19 T67 T19 T67 T24 T12 T12 T24 T60 T54 T12 T54 T99 T99 T90 T89 T33 T33 T24 T16 T19 T67 T19 T67 T85 T85 T77 T43 T99 T99 T90 T89 T12 T60 T19 T60 T85 T85 T67 T77 T33 T33 T24 T16 T54 T43 Figure 10. Gantt Chart for Vessel 3 in Case 1. T95 T16 T20 T29 T43 T52 T20 T29 Data used in Case Study 2 Table 9. Repair properties for Case Study 2. Half day repair Full day repair High priority repair Low priority action Repair Time (h) Technicians Required Value Cost Load (£ ,000) (£ ,000) (kg) 2.5 2 100 1 100 Probability of correct diagnosis 1 6 6.1 3 3 100 120 1 1 100 100 1 1 5.9 2 80 1 100 1 Table 10. Properties of vessels used in Case Study 2. Vessel number 1 2 3 4 Crew capacity 12 12 12 12 Speed (km/h) 36 36 36 36 Fuel consumption Hire cost (£'000/km) (£'000/day) 0.006 0 0.006 0 0.006 0 0.006 0 Table 11. Case Study 2 inputs. Technicians available Time to transfer crew from vessel to turbine (min) Time window (h) Speed correction factor (for turbine-turbine journeys 33 15 11.5 0.667 Load capacity (kg) 1200 1200 1200 1200
© Copyright 2026 Paperzz