MANAKAMANA ENGINEERINGHYDROPOWER COMPANY(P) LTD. GhatteKholaSmallHydropowerProject Dolakha CONSULTINGSERVICES AND CONSTRUCTIONSUPERVISION MONTHLYPROGRESSREPORT March 2017 Submitted By: TAC Hydro Engineers Pvt. Ltd. Kupandole, Lalitpur Tel No. +977 1 5522896 Fax No. +977 1 5522896 E-mail: [email protected] Consulting Services and Construction Supervision of Ghatte Khola SHP 2017 Progress Report March TABLE OF CONTENT TABLE OF CONTENT i LIST OF ANNEXES ii LIST OF ABBREVIATIONS iii SALIENT FEATURES OF THE PROJECT iv PROJECT LOCATION MAP 1 2 3 GENERAL viii 1 1.1 Introduction 1 1.2 WorkNature 1 1.3 ReportSetup 2 PROJECTMANAGEMENT 2 2.1 OrganizationalSetup 2 2.2 ConstructionManagement 3 2.3 VisittotheWorkSite 3 PROJECT ENGINEERING 3 3.1 Major EngineeringActivities 3 3.2 Major Construction Activities 4 3.2.1 Civil Works 4 3.2.2 Hydromechanical Works 5 3.2.3 Electromechanical Works 5 3.2.4 Transmission Line Works 5 4 CLAIMSANDVARIATIONS 5 5 CONCLUSIONANDRECOMMENDATION 5 TAC Hydro Engineers Pvt. Ltd. i Consulting Services and Construction Supervision of Ghatte Khola SHP 2017 Progress Report March LIST OF ANNEXES Annex–A ListofpersonneloftheEmployer,theConsultantandtheContractor Annex–B ProgressSheets Annex–C DeviationsinTimeSchedule Annex–D MostImportantActivities:DelaysActivities Annex–E Photographs TAC ii Hydro Engineers Pvt. Ltd. Consulting Services and Construction Supervision of Ghatte Khola SHP 2017 Progress Report March LIST OF ABBREVIATIONS BOK - Bank of Kathmandu Limited COD ‐ CommercialOperationDate CMA ‐ ConstructionManagementAdvisor DoED ‐ DepartmentofElectricityDevelopment ‐ DS TAC iii Downstream EM ‐ Electro‐mechanical HW ‐ Headwork HM ‐ Hydro‐mechanical HR ‐ Headrace NEA ‐ NepalElectricityAuthority PC ‐ Penstock PH ‐ Powerhouse PPA ‐ PowerPurchaseAgreement JV ‐ JointVenture RCOD ‐ RequiredCommercialOperationDate SHEP ‐ SmallHydroelectricProject SS ‐ Substation TACHydro ‐ TACHydroEngineersPvt.Ltd. TR ‐ Tailrace TL ‐ TransmissionLine US ‐ Upstream VCB ‐ VacuumCircuitBreaker Hydro Engineers Pvt. Ltd. Consulting Services and Construction Supervision of Ghatte Khola SHP 2017 Progress Report March SALIENT FEATURES OF THE PROJECT Project Location : MarbuVDC ofDolakhaDistrict,CentralDevel opmentRegion, Nepal Longitude : 27o46′25″Nto27o47′14″N Latitude : 86o17′00″Nto 86o18′35″N. : RORSmallHydro DesignFlow : 1.78 m3/s (Q40) 1:100yearsflood : 90.70 m3/s Type : Concretediversionweir Type Hydrology Catchment Area (Intake Site) : (Total) Average Flow : 30 km 2 3.20 m3/s Weir withcontrolledspillway CrestElevation : 1906.00 masl CrestLength : 15.00 m Maximum Height : 5.00 m (From Foundation) Intake TAC iv Hydro Engineers Pvt. Ltd. Consulting Services and Construction Supervision of Ghatte Khola SHP 2017 Progress Report March Type : OrificeIntake InvertLevel : 1904.5 masl NormalWaterLevel : 1906.00 masl WidthxHeight : 3.0 m x0.40 m InvertLevel : 1901.5 masl NormalWaterLevel : 1906.00 masl WidthxHeight : 2.0 m x2.5 m Type : Dufour Length : 38.00 m Width : 3.00 m Depth : 4.20 m Flushing : Simple headcutting (Inthemonsoon) Undersluice Desander Water Conveyance System(Headrace Pipe) Length : 2085 m Diameter : 1.3 m Thickness : 6 mm Surge Tank Dimensions TAC v Height : 17 m Diameter : 3.5m NormalWater Level Hydro : 1904.44 msl Engineers Pvt. Ltd. Consulting Services and Construction Supervision of Ghatte Khola SHP 2017 Progress Report March StaticWater Level : 1906.44 mslMinimumDownsurgelevel : 1894.23 mslMaximum upsurge level : 1912.44 mslInvertLevel ofPenstockIntake: 1892.94 msl Surface Penstock/ Manifold PenstockLength : 1015. m Diameter (Internal) : 0.90 : 6 mm to mThickness(Steel) 15 mmNumber ofAnchorBlocks ManifoldLength : 20 : 8.0 mDiameter (Internal) : 0.64 m Thickness(Steel) : 15 mm Powerhouse Type : Surface Dimensions(LxBxH) : 24.00 mx14.00 mGrossHead : 345.20m NetHead : 338.47m Installed Capacity(Q40) : 5000 PowerFacilities m x10.00 KWAverage Annual EnergyOutput : 29.87GWhE nergyOutput(DrySeason) : 4.4 GWhEnergyOutput(Wet Season) : 25.4 : 14.0 km (33 kV Single Circuit) GWh TransmissionLineandSustation TransmissionLine TAC vi Hydro Engineers Pvt. Ltd. Consulting Services and Construction Supervision of Ghatte Khola SHP 2017 Sub station Progress Report March : Singati Cost Total Cost with Financing : Rs. 87.63 Crore Loan Amount : Rs. 61.00 Crore Promoter Equity : Rs. 26.63 Crore Cost per MW : Rs. 17.53 Crore Revenue per MW : Rs. 2.90 Crore : Rs. 87.63 Crore Financial Indicators Financial Cost IDC : Rs. 6.13 Crore IRR : 13.84 % Return on Equity : 18.52 % NPV : Rs. 24,705 thousand Benefit Cost Ratio (B/C) : Debt Service Capacity Ratio : Payback Period - Simple : 6.47 years Payback Period - Discounted : 10.81 years 1.33 1.62 Construction Period : 1.5 Years TAC vii Hydro Engineers Pvt. Ltd. Consulting Services and Construction Supervision of Ghatte Khola SHP 2017 Progress Report March PROJECT LOCATION MAP TAC viii Hydro Engineers Pvt. Ltd. Consulting Services and Construction Supervision of Ghatte Khola SHP 2017 1 Progress Report March GENERAL 1.1 Introduction GhatteKholaSmallHydroelectricProjectwithinstalledcapacityof5000kW,beingconstructedbyM ANAKAMANAENGINEERINGHYDROPOWERCOMPANY(P)LTD.,isin the preliminary phase of construction.ConstructionsiteofthisprojectisattheGhatteKhola,Marbu‐VDC,Dolakha,whichisat ributaryofKhareRiver.Thisisarun‐off‐riverscheme with orifice side intake. The proposed headworks site is located on the left bank of Ghatte Khola about 100 m downstream from the confluence of Thado Khola and Ghatte Khola at an elevation of 1906 masl in MarbuVDC-7. Similarly, the powerhouse site has been proposed on the left bank of Ghatte Khola around 125m upstream of the confluence of Khare Khola and Ghatte Khola in the same VDC at an elevation of about 1575 masl. Geographically,theprojectislocatedinbetween86°17′00″Nto86°18′35″NLatitudesand27°46′25″ Nto27°47′14″NLongitudes. Waterwillenterintothesystemthroughorificesideintakeontheleftbankoftheriver.Diversionweiris ofnon‐regulatedtype,withOrificetypeintake&oneunder‐sluiceontheleftbank.Waterwillbecarried tothe32m.longdoublechamberdesandingbasinthrough30mlongpowercanalhaving7m long spillway.Waterisconveyedthrougha2234mlongsteelheadracepipehaving1300mmdiameterand1 015mlongsteelpenstockpipe.Circular Steel Surge Tank of diameter 5m is used to regulate the surge. Therearetwonumbersofpeltont urbi nes eachofinstalledcapacity2500kW.A14.5kmlong33kVtra nsmissionlinewillfeedgeneratedpowerfromthePowerhouse(switchyard)toSingatisubstation. 1.2 WorkNature Constructionworkcomprisesof construction of access road to Headworks and Powerhouse, civilworksatheadworks,headrace alignment,penstockandpowerhousearea,fabricationanderectionofsteelpipeforheadraceandpenst ockpipe,installationandcommissioningofelectromechanicalequipmentinpowerhouse,switchyar dandSingatisubstation,erectionoftransmissionlineandotherrelatedworks. TAC 1 Hydro Engineers Pvt. Ltd. Consulting Services and Construction Supervision of Ghatte Khola SHP 2017 Progress Report March Sakurapower/Biruwa/DivyajyotiJ.V. has been selected for the construction of all civil works. Hydromechanical and electromechanical contractor are yet to be selected. Consulting and construction supervision has been awarded to TAC Hydro Engineers Pvt. Ltd. 17km.ofMotorabletrackgoesfromSingatitoMarbu(Powerhousesite).SingatiisconnectedtoCharik ot(DistrictHeadquater) by 47km. good gravel road. 450 m access road to Powerhouse has been constructed to reach the Powerhouse and 500 m to reach Headworks along Ghatte khola.Theoveralllengthoftrackopening for waterway alignment is around 2234 m.Atpresentfullloadedtruckcanreach to the Surge Tank area and opening of proposed access road towards Headworks and Powerhouse. 1.3 ReportSetup TACHydrowas responsible for carrying out the detailed design of the project. In addition, it has been awarded the consulting services for the engineering supervision of all the construction works going on at site including managerial activities at Kathmandu office. ThisisMonthlyProgressReportforthemonthofMarch2017,whichconsistsofanaccountofpreconstruction and constructionactivitiesofcivilstructures,hydromechanicalcomponents,electromechanicalequipm ent,transmissionlineandprojectinfrastructurescarriedoutinthepastmonth,majorproblemsarisen,d eviationsfromtheoriginalworkingscheduleandthecatch‐upplans,photographsofprogressesmadei nthelastmonthsandotherrelevantdetails as per the activities being carried out. ThisreportincludesthefollowingAnnexes: ListofpersonneloftheEmployer,theConsultantandtheContractoraregiveninAnnex– A.ProgressSheetsaregiveninAnnex–B.DeviationsinTimeScheduleispresentedinAnnex– C.MostImportantActivities:DelayedActivitiesareshowninAnnex‐Dandphotographsarepresente dinAnnex‐E. 2 PROJECTMANAGEMENT 2.1 OrganizationalSetup ThisprojectisunderdirectsupervisionofCompany’sDirectors.TACHydroassiststheManage mentbylookingafterallthetechnicalmattersoftheProject.Allotherissuesaredirectlytakenover TAC 2 Hydro Engineers Pvt. Ltd. Consulting Services and Construction Supervision of Ghatte Khola SHP 2017 Progress Report March bytheManagement. 2.2 ConstructionManagement OneofthedirectorsoftheCompanyisplannedtobestationed atsite,sothatimmediatedecisionscanbemadewheneverneeded.Technicalmattersareallhandledbyt heengineersdeputedatsitefrom the Consultant, TACHydro. There isoneCivilEngineerand two CivilSub‐Engineers / surveyorstationedatsite. Considering work progress one more engineer and two supervisors shall be deputed at site.Otherkindsofengineeringprofessionals wi l l handlethetechnicalmattersfromKathmandu,andthey gate erection and willvisitsiteeverynowandthen.During electromechanicalinstallationworks, one Mechanical and electricalengineeralong with supervisorshallbedeputedatsite. 2.3 VisittotheWorkSite Projectofficials,Consultantsandbank’srepresentativesfrequentlyvisittheworksitetoapprisethems elvesoflatestsituation. 3 PROJECT ENGINEERING AnAgreementwassignedbetweenManakamanaandTACHydroforConstructionSupervisionand management ofsiteworksoftheProject.Aspertheprovisionsandscopeofconsultingservices,theConsultantmake saconstantcontrolandmonitoringofContractor’sworkswithintheframeworkoftheTechnicalSpeci ficationsandreportstimelytotheProject,withsuggestionsandrecommendationsforfurtheractions. TheConsultantalsomakesobservationsofoverallprogressatsiteandchecksitagainstthetimeschedu leoftheProject.TheConsultantalsoindicatesthoseactivitieswhicharelaggingandneedspecialattent ionandeffortstocompletetheactivitiesinordertocatchuptheschedule. 3.1 MajorEngineeringActivities Followingarethemajorprojectactivitiesintheperiodofthisreport: i. After few days rainfall, unexpected landslide occurred in the power house area. Immediate site visit was made by Geologist and Senior Hydropower Engineer and recommended to shift the power house to the best available location (i.e. 75 m TAC 3 Hydro Engineers Pvt. Ltd. Consulting Services and Construction Supervision of Ghatte Khola SHP 2017 Progress Report March upstream of the landslide area ) considering long term safety of Power House. ii. Power house design as per Electromical Requirement has been received from the EM Supplier (Flovel India). After reviewing it by the consultant considering site condition and structural requirement, Flovelindia has revised the drawings few times. The supplier has provided the loading diagram and structural design from TAC Hydro is ongoing. iii. A team comprising of Mr. K B Uprety (Client, Chairperson) , Mr. BigyanGhimire (BOK Lumbini), Mr. Prahlad Chaudhary (Consultant, Project Coordinator) and Mr. UjjwalPrajuli (Consultant, Mechanical Engineer ) had made a visit to pipe manufacturer, China. Manufacturing of Spirally Welded Pipe is ongoing. Mr. UjjwalPrajuli has been deputed in the factory to inspect and maintain the quality control. He will be back once the manufacturing and quality check of SW pipe completes. iv. Bids for fabrication of gates and installation of all hydro mechanical componentshas been received and opened. Bidder have been sort listed and shall be called for negotiation. v. Inspection, measurement and quality control of civil construction works (construction materials, excavation, bar bending schedule, concreting etc.) vi. Internal Discussionandplanningofconstructionworks. vii. Discussion and planning of construction works with the contractor for the full mobilization of human resource. viii. ix. SuggestionsandrecommendationsforImprovingthespeedofconstructionworks. Discussion and carrying out all other day to day engineering matters like attending meetings regarding project with Banks, DOED, NEA as required by Clients. 3.2 Major Construction Activities 3.2.1 Civil Works i. About 70% (7150m3) of excavation work at new power house location has been completedtill the preparation of this report. Out of the excavated material, 79% material is Boulder mixed soil (BMS) and remaining 21% is rock (Boulder).(1510). TAC 4 Hydro Engineers Pvt. Ltd. Consulting Services and Construction Supervision of Ghatte Khola SHP 2017 ii. Progress Report March Construction of access road (About 500 m stretch) to headworks area has been completed. iii. Site clearance and sorting of boulder for rip rap in weir area. iv. Foundation preparation for river training works (Gabion wall) at the left bank near power house area has been completed and about 80 m3 gabion has been constructed. 3.2.2 Hydromechanical Works 3.2.2.1 Procurement and Transportation of Spirally Welded Pipe SW Pipe is being manufactured in china. Mr. UjjwalParajuli (Mechanical Engineer),consultant’s representative is at factory for quality control. 3.2.2.2 Fabrication and Installation of Gates and Pipes Bids for the above-mentioned work has been received and opened. Bidders shall be called for negotiation soon. 3.2.3 Electromechanical Works Flovel India is manufacturing Electromechanical equipment’s. Drawings have been revised few times considering site and structural requirement. Detail design of power house is ongoing. 3.2.4 Transmission Line Works Survey work for transmission route from Power House to Bhorle bridge is completed. Remaining survey work from Bhorle to Singati Sub station is planned to continue from mid of April. 4 CLAIMSANDVARIATIONS Noissueofclaimsandvariationshasbeenarisensofar. 5 CONCLUSIONANDRECOMMENDATION The report is concluded with following recommendations: i. Crusher plan will start to produce construction material from the mid of April. ii. Site has been closed time and again due to disturbance of local people regarding work. After multiplenegotiation with the local people interested in construction activities, understanding has been made to provide them work considering their capability and TAC 5 Hydro Engineers Pvt. Ltd. Consulting Services and Construction Supervision of Ghatte Khola SHP 2017 Progress Report March start work at headworks area and written consent was made for no further disturbance. iii. It was planned to construct weir before this monsoon. However,due to disturbance from local people of Headworks, excavation work at headworks has been delayed.As a result, weir clearance and excavation work shall be carried out before this monsoon and concreting work shall be done just after the monsoon. iv. Excavation at power house is going on and shall be completed by the first week of April if the underground soil condition is as expected. v. Selection of cement and reinforcement after laboratory testing of their material properties like compressive strength and tensile stress. vi. Immediate Opening of LC for construction material purchase (Reinforcement and Cement) vii. It is recommended to select HM contractor immediately so that camp and workshop can me made ready for the fabrication of bend and frames in the first stage. TAC 6 Hydro Engineers Pvt. Ltd. Consulting Services and Construction Supervision of Ghatte Khola SHP 2017 Progress Report March TAC Pvt. 7 Hydro Engineers Ltd. Consulting Services and A Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March LIST OF PERSONNEL EMPLOYER: Manakamana Engineering Hydropower Pvt. Ltd. Name of Project staff deputed in the Project S.N Name Designation Staffs deputed at site / Frequent site visit 1 Managing Director Tek Prasad Chaulagain 2 Tilak Aral PRO / Management Officer 3 4 5 6 7 8 9 10 11 12 13 14 Staffs deputed at KTM office 1 2 3 4 5 TAC Hydro Engineers Pvt. Ltd. i Consulting Services and A Construction Supervision of Ghatte Khola SHP 2017 CONSULTANT: TAC Hydro Engineers Pvt. Ltd. Name of staffs involved in Ghatte Khola SHP S.N Name Designation 1 Prahlad Chaudhary Technical Coordinator 2 DipeshThapa Project Manager 3 Balkrishna Pangeni Resident Engineer 4 Nagendra Chaudhary Electrical Engineer 5 BishnuShiwakoti Geologist 6 Ghanshyam Rana Sub-Engineer 7 Chandra Thapa Sub-Engineer / Surveyor CONTRACTOR: Sakurapower/Biruwa/DivyajyotiJ.V. Name of staffs involved in Ghatte Khola SHP S.N Name 1 DipendraPoudel 2 Riken Gautam 3 DevendraPoudel 4 Gopal Gurung 5 AnjanAdhikari 6 Operator/Driver/Helper 7 8 9 Annex Progress Report March Remarks Frequent visit to site Frequent visit to site Site Stationed Frequent visit to site Frequent visit to site Site Stationed Site Stationed Site In-charge Civil Engineer Sub Engineer/ Surveyor Senior Supervisor Supervisor 6 Nos. Equipment’s Mobilized by Contractor at Site S.N Name 1 Excavator (PC 225, Doosan) 2 Breaker 3 Dumper (Tipper) 4 Bolero 5 6 7 8 TAC ii Hydro Engineers 3 2 1 1 Pvt. Ltd. Consulting Services and A Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March 9 TAC iii Hydro Engineers Pvt. Ltd. Consulting Services and Construction Supervision of Ghatte Khola SHP Annex B Progress Report March 2017 PROGRESSSHEETNO.1 CivilConstructionWorks Civil Construction Work Progress March, 2017 SubProgress Progress Foundation Bar Bending / Form Stone Masonary Filling / Components Till Last Till This Components Sub-Components Excavation Preparation Work / Concreating / Protection work Finishing Work Progress Month Month A1. To Headworks 100% 100% 100% A. Access Road 1.00% 2.00% A2. To Power House 100% 100% 100% B1. Weir 10% 0% 0% 0% 2.50% B2. Undersluice and Intake 0% 0% 0% 0.00% B. Headworks 0.00% 0.14% B4. Approach Canal 0% 0% 0% 0% 0.00% B5. Settling Basin 0% 0% 0% 0.00% B6. Filling Work 0% 0.00% C1. Track and/or Trench 4% 0% 0% 2.22% C2. Anchor Block 0% 0% 0% 0.00% C. Headrace Alignment 0.33% 0.33% C3. Saddle Support 0% 0% 0% 0% 0.00% C3. Saddle Pad 0% 0% 0% 0.00% D. Surge Tank D1. Surge Tank 0% 0% 0% 0% 0.00% 0.00% 0.00% E1. Track and/or Trench 0% 0% 0% 0.00% E. Penstock Alignment E2. Anchor Block 0.00% 0.00% 0% 0% 0% 0.00% E3. Saddle Support 0% 0% 0% 0% 0.00% F1. Power House 70% 0% 0% 7% 0% 18.20% F. Power House 2.59% 3.77% F2. Tailrace 0% 0% 0% 0% 0.00% Overall Civil Progress 6.24% This Months Progress 2.32% TAC Hydro Engineers Pvt. Ltd. i Consulting Services and B Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March PROGRESSSHEETNO.2 HydromechanicalWorks No construction works yet started TAC ii Hydro Engineers Pvt. Ltd. Consulting Services and B Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March PROGRESSSHEETNO.3 ElectromechanicalWork No construction works yet started TAC iii Hydro Engineers Pvt. Ltd. Consulting Services and B Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March PROGRESSSHEETNO.4 TransmissionLineWorks Survey of Transmission line route up to Bhorle. TAC iv Hydro Engineers Pvt. Ltd. Consulting Services and C Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March DEVIATIONSINTIMESCHEDULE S. No. Year 2073 Description of Works 9 10 11 Year 2074 12 1 2 3 Start Date 4 Target Date Duration Remarks A : Mobilization 1. Site Mobilization 1.1 Construction of site camps & accessories Completed Partially mobilized at construction 1.2 Mobilization of equipments 1.3 Establishment of Crusher Plant 1.4 Establishment of Labrotary and Stores 15 Falgun 1 Chaitra 15 chaitra: 73 30 Chaitra: 73 25 Falgun 30 Falgun:73 1 Chaitra 15 Chaitra 15 Chaitra:73 30 Chaitra:73 30 continued 30 2. Access Road 2.1 Access from existing road to Power House Opening of Track upto Headworks from river 2.2 crossings Completed 5 Completed B. Headworks 1. Structural Works (Undersluice + Weir + Intake) Weir + Undersluice (Surface Excavation) and 1.1 river diversion Foundation Excavation (clearance of rock and 1.2 boulder) 2. Structural Works (Desander , Approach Canal & Headpond) 2.1 Foundation Excavation 2.2 Bed concreting (3nos panel) 2.3 Construction of baffle wall 2.4 Protection works (nearby big boulder) 15 20 Chaitra Chaitra: 73 1 30 Jestha Jestha:74 1 Asar 1 15 Baishak Jestha:74 15 15 5 30 60 During monsoon season 45 C. Headrace Alignment / Penstock Alignment 1. Excavation Works Headrace (0+450m chainage upto 1+000m 1.1 chainage) 1.2 Headrace (Bell mouth upto 0+450m chainage) Headrace (1+200m chainage upto 1+800m chainage) Penstock Alignment : Site camp to Power 1.4 house 2. Primary Anchor Block & Saddle supports Headrace (0+450m chainage upto 1+000m 2.1 chainage) 1.3 2.2 Headrace (Bell mouth upto 0+450m chainage) 1 30 Baishak Baishak: 74 15 30 chaitra Jestha:74 1 30 Baishak ashar:74 15 30 chaitra chaitra;73 15 baishak 1 jestha 30 ashar:74 30 ashar:74 30 75 90 Parallel excavation will be done providing 150m to 250m working front for HM 15 75 60 Parallel work will be done providing 150m to 250m work front for HM 3. Protection works & Backfillings works Parallel ongoing works 3.1 D. Power House Areas 1. Excavation Works 1.1 Surface Excavation 1.2 Foundation Excavation 1 chaitra 30 Falgun: 73 15 chaitra:15 30 45 2. Structural Works 2.1 Substructural works upto plinth Lvl. 2.2 Superstructural work upto finishing lvl. 2.3 Protection Works 2.4 Drainage works TAC Hydro Engineers Pvt. Ltd. 15 30 chaitra jestha:30 1 30 Jestha Bhadra: 74 1 15 chaitra baishak:74 1 30 baishak baishak:74 75 During monsoon season 60 45 30 i Consulting Services and D Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March MOSTIMPORTANTACTIVITIES:DELAYS ACTIVITIES 1. Excavation at headworks area has been delayed due to obstruction by local people. The issue has been resolved. Site clearance and sorting of boulder for rip rap is going on in full swing. 2. Crusher installation has been delayed due delay in sending welding manpower by the crusher supplier. However, it will be start producing material by the mid of April 2017. TAC Hydro Engineers Pvt. Ltd. i Consulting Services and D Construction Supervision of Ghatte Khola SHP 2017 TAC ii Hydro Engineers Annex Progress Report March Pvt. Ltd. Consulting Services and E Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March PHOTOGRAPHS Figure 1 Breaker busy in breaking boulder as seen from uphill of power house area. TAC Hydro Engineers Pvt. Ltd. i Consulting Services and E Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March Figure 2 Two excavators at work as seen from road on the right bank. TAC ii Hydro Engineers Pvt. Ltd. Consulting Services and E Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March Figure 3 Boulder of area about 150 m3 at Power house being broken by breaker. TAC iii Hydro Engineers Pvt. Ltd. Consulting Services and E Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March Figure 4 Dumping of excavated material at downstream of power house near crusher area. TAC iv Hydro Engineers Pvt. Ltd. Consulting Services and E Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March Figure 5 Protection work (Gabion work) at the left bank near power house. TAC v Hydro Engineers Pvt. Ltd. Consulting Services and E Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March Figure 6 Earth resistance measurement at power house area. TAC vi Hydro Engineers Pvt. Ltd. Consulting Services and E Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March Figure 7 Welding of J hook for crusher installation. TAC vii Hydro Engineers Pvt. Ltd. Consulting Services and E Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March Figure 8 Unloading of main crusher block at crusher area. TAC viii Hydro Engineers Pvt. Ltd. Consulting Services and E Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March Figure 9 Construction of store room near crusher area. TAC ix Hydro Engineers Pvt. Ltd. Consulting Services and E Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March Figure 10 Maintenance of road on the way to Headworks from Power House. TAC x Hydro Engineers Pvt. Ltd. Consulting Services and E Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March Figure 11 Site clearance and sorting of boulder for rip rap. TAC xi Hydro Engineers Pvt. Ltd. Consulting Services and E Construction Supervision of Ghatte Khola SHP 2017 Annex Progress Report March Figure 12 Clients camp almost ready to move in. TAC xii Hydro Engineers Pvt. Ltd.
© Copyright 2026 Paperzz