Agenda
- New Project officer: Fabrizio Sestini [email protected]
- 1st Year Deliverables
- Progress Report
- Next Meeting
- Meeting with IAB
- Relationship with the Equator project
- Any other Business
2
1st Year Deliverables
Deliverables list
Del.
no.
Deliver able name
D1
D2
Project web-site set up
Project Plans
Dissemination and Use
Plan
MobileMAN intermediate
evaluation report
MobileMAN architecture,
protocols, and services first
report
MobileMAN functionalities
Π a minimal set
D3
D4
D5
D6
WP
no.
Lead
participant
Estimated
personmonths
Del. type*
Security
**
Deliver
y
(proj.
month)
0
CNR
2
Prototype
Pub.
3
1
1
CNR
CNR
3
2
Report
Report
Pub.
Pub.
3
6
1
SUPSI-DIE
5
Report
Pub
12
2
EURECOM
32
Report
Pub
12
3
CNR
18
Prototype
Pub
13
3
Already delivered: D1 and D2
D1 (CNR) : comments on the web site
• We think to add for each partner the names
of
people involved (also e-mails?)
• Suggestions/requests
D2 (CNR) : contains the first year success criteria
A project presentation report has also been prepared
4
D3 (CNR): ToC and Request for Contributions
1.
2.
3.
3.1
3.2
INTRODUCTION
DISSEMINATION
EXPLOITATION
Industrial Advisory Board % type of interest for project results %
3.1.1 BT Extra
A brief description of the industry. A
3.1.2 Nokia
paragraph to describe the type of interest
3.1.3 ST
(NIC, middleware, etc.)
3.1.4 Siemens
3.1.5 Cisco ??????
Project Partners
% existing routes for exploitation of project results %
3.2.1 CNR
3.2.2 University of Cambridge
Contributions from each
3.2.3 Eurecom
partner on existing
3.2.4 Helsinki University of Technology
connections (industry,
3.2.5 NETikos
academy, etc. that can be used
3.2.6 SUPSI
for the project exploitation)
5
D4(SUPSI DIE) - intermediate evaluation report and
Success Criteria
MobileMAN architecture definition
Definition of the complete MobileMAN architecture with the
communication flows among different activities and the integration of
vertical issues as co-operation and energy awareness.
Socio-economic Model
To develop a methodology for evaluating social, anthropological, and
economic potential of MobileMAN.
New applications and services
Identification of existing applications (or classes of applications) that
can become a customer advantage, when run on top of MobileMAN,
compared to traditional technologies. Define the services that we need
to provide for efficiently supporting some of these (classes of)
applications.
6
D4(SUPSI DIE) - intermediate evaluation report and
Success Criteria
Middleware
Comparative analysis of existing middleware solutions for mobile
environment (Xmiddle, Jxta, Lime, etc.). The aim of this comparison is
the identification of the best solution(s) for the MobileMAN
environment.
Definition of new solutions for P2P information delivery: This will be
done by selecting some of the resilient mechanisms that have emerged
in the p2p community (such as CAN, Chord, Pastry, etc.), and then
introducing location information and scope information so that content
is initially placed and requests are routed to copies that have
proximity on a number of QoS axes.
7
D4(SUPSI DIE) - intermediate evaluation report and
Success Criteria
Co-operation Model
Design of models and mechanisms that encourage users to behave as
“good citizens”.
Networking services
Design of location and packet forwarding schemes suitable for
MobileMAN.
Comparison of routing protocols for ad hoc networks utilizing simulation
studies, and, whenever possible, measurements on real testbeds.
Development and testing of a few hops ad hoc network implementing a
minimal set of functionalities (routing, forwarding, and location).
8
D4(SUPSI DIE) - intermediate evaluation report and
Success Criteria
Wireless Technologies
Analysis of the limits of the existing solutions (based on IEEE 802.11) for
constructing multi hop ad hoc networks. The analysis is performed by
simulation and measurements;
Design of an enhanced MAC protocol for ad hoc networks. The new MAC
protocol must be compatible with the IEEE 802.11 and provide a better
channel utilization;
Comparative analysis of existing chipsets to identify the best solution for
implementing the MobileMAN enhanced NIC.
9
Deliverable D5 (Eurecom)
D5: MobileMAN architecture, protocols and services preliminary report
D5 has asoociated a high man power: 32 mm
D5 is the Main Output of WP2 “Domain Modelling”:
“In this work-package we will perform the MobileMAN architecture definition with the
communication flows among different activities and the integration of vertical issues. In
addition, this worpackage will be responsible of the design the networking protocols
required to implement the MobileMAN architecture (MAC protocol, location and
forwarding protocols, security and co-operation). The developed technical solutions will
be immediately validated (before they are implemented) by adopting simulative and
analytic techniques (as appropriate).”
10
Deliverable D5 (Eurecom) - Inputs
T2.1 New applications and services: Identify existing applications that can
become a customer advantage (input to D5) - Netikos
T2.2 MobileMAN architecture definition (input to D5) - All
T2.3 Bursty-responsive MAC Specification of new MAC protocol supporting
bursty communication. (input to D5)
CNR + SUPSI DIE
T2.4 Definition of networking services: Define location and packet
forwarding schemes …. (input to D5)
CNR and HUT
T2.5 Security and Co-operation Model and Mechanisms: (input to D5)
Eurecom
SUPSI
T2.6 P2P information delivery: (input to D5)
+
Cambridge
T2.8 Economic driven modelling: (input to D5, D10, D13) Cambridge
11
D5 scheduling and ToC
Milestone 5 Month 10: Preliminary definition of the
MobileMAN architecture, protocols, and services to be
used as input for WP 3
A preliminary version should be ready by the 3rd workshop
(end June)
ToC ?????
12
Milestone 1 – Month 6: Analysis of the correct
project start up
Tasks temporal diagram
T5.3
WP 5
T5.2
T5.1
T4.6
T4.5
T4.4
WP 4
T4.3
T4.2
T4.1
T3.6
T3.1 Bursty-responsive MAC Develop new
MAC protocol and hardware supporting
bursty communication. The hardware will
be based, wherever possible, on a off-theshelf 802.11 chipset with ad-hoc
programmed firmware. (input to D12)
T3.5
T3.4
T3.3
WP 3
T3.2
T3.3 Routing and forwarding: Develop
routing and forwarding protocols for the
self-organised and co-operative
communications of MobileMAN.
Implementation of them for the Linux
operating system, in co-operation with the
task on security (T3.4). (input to D6,
D11, D14)
T3.1
T2.9
T2.8
T2.7
T2.6
T2.5
T0.0
WP 2
T2.4
T2.3
T2.2
T2.1
T0.0
T1.5
T1.4
T1.3
WP 1
T1.2
T1.1
T0.4
T0.3
WP 0
T0.2
T0.1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36
Projet month
13
Progress Report
M1 – Month 6: Analysis of the correct project start up and of
partners’ alignment for methods and tools.
Construction of an Intermediate Progress Report to define the technical
and management status of the project.
Cost Statements related to the first 6 months of the project (we will soon
send you a detailed request
M1 – Month 6: First meeting with the Industrial Advisory
Board to present and discuss the project goals
We will explain that the meeting with IAB is postponed to end
of the 9th month
14
Progress Report (cont.)
CONTENTS LIST:
1. WORK PROGRESS OVERVIEW
- this section contains for each partner the activities
performed during the first 6 months (say, 300 - 500 words),
e.g.,
CNR work in the first 6 months has been on Deliverable D5 in the field of the
Analysis of the limits of the existing solutions (based on IEEE 802.11) for
constructing multi hop ad hoc networks. The analysis performed by simulation
and measurements has shown that ….
-
Please also add the man months assigned to the activities to have a
view of the efforts.
15
Progress Report - content list (cont.)
2. CONFERENCE MEETINGS:
MobileMAN project members attended the following
conferences during the first six months of the project:
Input expected from each partner
3. COOPERATION WITH OTHER PROJECTS
Input expected from each partner (if any)
4. PUBLICATIONS:
Input expected from each partner (if any)
16
Other Business
-
Next Meeting (3rd)
Cambridge, end June ?
-
4th meeting , when, where
-
Meeting with IAB
Cambridge, end June ?
-
Relationship with the Equator project
Meeting in June or before ?
-
Any other Business
17