SmartNet Methods

SmartNets Results
Overview
28.07.2017
SmartNets Methods
2
28.07.2017
SmartNets
SmartNet Collaboration Model
 Related task:
 Related deliverable:
 Related milestone:
 Responsible:
 Due date:
 Name in work plan:
T1.3
D1.3
MS2
DITF
M9
SmartNet Collaboration Model
The definition of a process model for the collaborative development and production as it is targeted
within SmartNets is a further prerequisite for the work in the project. The process model will comprise
all activities from the collaborative design and development of new products to the distributed
production of established products. Within this task, the different steps of the process will be identified
and broken down in activities and tasks to be performed within these steps. The developed model will
serve as blueprint for the implementation in the industrial collaborations.
3
28.07.2017
SmartNets
SmartNet Guide
 Related task:
 Related deliverable:
 Related milestone:
 Responsible:
 Due date:
 Name in work plan:
T2.2
D2.1/D2.4
basis for MS3
WHU
M12
SmartNet Guide
From the concept of Smart Organisations and Smart Networks, one part of the SmartNet Guide will be
elaborated as SME-suitable guideline to give comprehensible and easy-to-implement instructions
about how an industrial partnership can become a Smart Network. The guidelines will not only include
checklists to identify their 'as-is'status' and step-by-step instructions how to reach a desired final state,
but will also visualize several good-practices as exemplary “should-be” cases. The guidelines will be
developed according to the overall, requirements identified in WP1 and will be evaluated and
constantly updated with feedback from T2.3.
4
28.07.2017
SmartNets
SmartNet Methods
 Related task:
 Related deliverable:
 Related milestone:
 Responsible:
 Due date:
 Name in work plan:
T3.1
D3.1/D3.2
MS4
Centexbel
M18
SmartNets Collaborative Development and Production Methodology
From research and practice, methods suitable for SME and for collaborative application will be gathered
and assigned to the different stages of the SmartNet Collaboration Model. The methods will be adapted to
the specific requirements of an application in a collaborative setting (SmartNet Methods). To achieve that,
it is necessary to identify knowledge requirements and outcomes of each method. Furthermore, for a
future implementation of the methods within WP4, the methods will be closely analysed to evaluate the
potential to implement the methods as applications on a collaboration platform.
5
28.07.2017
SmartNets
SmartNet Coordination Methods
 Related task:
 Related deliverable:
 Related milestone:
 Responsible:
 Due date:
 Name in work plan:
T5.1
D5.1/D5.4
MS7
DITF (Task), D‘App (WP)
M20
SmartNets Network
Coordination Methodology
The network coordination methodology will be developed according to the derived needs for network
coordination in Task 1.1. It will include amongst others concepts and methods for an easy and flexible
incorporation of new, as well as the change and exit of partners within the networks. An example for
this could be an adaptation of the well-known FMEA (Failure Mode and Effects Analysis) idea, to be
applied on network modes and effects. Furthermore, the methodology will comprise methods for the
strategic and tactical planning and control of activities within these networks. These methods will
however rely on methods for the identification of the current status of a development and production
(going far beyond a periodic information obtained by the responsible persons), as well as on methods
for the setup of a secure and reliable communication structure for such projects.
6
28.07.2017
SmartNets
SmartNet Transformation Methods
 Related task:
 Related deliverable:
 Related milestone:
 Responsible:
 Due date:
 Name in work plan:
T7.3
D7.3/D7.4
MS9
DITF (Task), ELLA-CS (WP)
M24
SmartNets Process
Transformation Methodology
Task 7.3 deals with the development of methods to support SME in efficiently transitioning from one to
the next phase of the development and production process (SmartNet Transformation Methods). The
focus is therefore on ways to reach the targeted state of the following phase as described in T7.1 from
an actual state that can be analysed with means of T7.2. Concepts, methods and tools will be
developed to reflect the flexibility of the SmartNet Collaboration Model, being not limited to a
transformation along a linear forward progress, but also being able to support a transformation with
feedback loops and cycles.
7
28.07.2017
SmartNets
SmartNets Tools
8
28.07.2017
SmartNets
SmartNet Modeller
 Related task:
 Related deliverable:
 Related milestone:
 Responsible:
 Due date:
 Old name in DoW:
T1.2
D1.2
MS1
DITF
M6
SmartNet Modeller
… has to include an organisational perspective on business processes and material flows in the
network, an ICT perspective on available IT infrastructure and information exchange and a knowledge
perspective on available competences in the network and required knowledge for the different
activities to be performed. To visualize all these perspectives on the network, SmartNet Modeller will
be elaborated. This modelling framework will be developed according to the requirements analysis of
the networks as included in Task T1.1. Comprehensive guidelines will be developed to make the
SmartNet Modeller applicable without further training. The guidelines will also describe usage
scenarios and how they can be addressed with the SmartNet Modeller.
9
28.07.2017
SmartNets
SmartNet Navigator
 Related task:
 Related deliverable:
 Related milestone:
 Responsible:
 Due date:
 Old name in DoW:
T4.1
D4.1
MS5
Centexbel (Task), GZE (WP)
M18
SmartNet Collaboration Process
Analyser
Key factor for the successful application of methods and tools along the SmartNet Collaboration Model
is the knowledge about the current status of the development. In this task, a set of tools will be
developed as SmartNet Navigator that assists in the analysis of the current status. It will integrate the
results developed in WP3, and will gather knowledge about available and missing information about
the product and about methods applied in the course of the process to determine the current status.
10
28.07.2017
SmartNets
SmartNet Method Consultant
 Related task:
 Related deliverable:
 Related milestone:
 Responsible:
 Due date:
 Old name in DoW:
T4.2
D4.2
MS6
InfoAsset (Task), GZE (WP)
M21
SmartNet Navigator
The SmartNet Method Consultant will be a set of tools which is designed to offer two major services.
First, based on the input of the SmartNet Navigator, it will suggest for current network situation
appropriate methods and tools which can be applied on the current development and production
problem. Furthermore, for selected methods from the SmartNet Methods, ICT support will be offered.
To offer these results, interfaces to the SmartNet Navigator and also to the SmartNet Configurator
have to be defined and developed. Also the information about the SmartNet Methods itself, as
developed in Task 3.1 will be offered as a tool. Appropriate methods have to be chosen for the
implementation and will then be realised by using a model-driven application development approach
on a collaboration platform.
11
28.07.2017
SmartNets
SmartNet Configurator
 Related task:
 Related deliverable:
 Related milestone:
 Responsible:
 Due date:
 Old name in DoW:
T6.1
D6.1
MS8
DITF (Task), D‘App (WP)
M24
SmartNet Designer
The SmartNet Designer will be developed as a set of tools which helps to implement the coordination
methodology of WP5 in industrial networks. An interface to the SmartNet Navigator will gather
information about the current status available to the tool. Also interfaces to the SmartNet Method
Consultant and SmartNet Transformation Manager will be foreseen.
12
28.07.2017
SmartNets
SmartNet Transformation Manager
 Related task:
 Related deliverable:
 Related milestone:
 Responsible:
 Due date:
 Old name in DoW:
T8.1
D8.1
MS10
InfoAsset
M27
SmartNet Transformer
SmartNet Transformation Manager is a set of tools developed to support the transformation as it has
been elaborated in WP7. Tools for the transformation of organisational structures, of ICT
infrastructures and of tacit and explicit knowledge will be developed. Interfaces with the SmartNet
Navigator, the SmartNet Method Consultant and the SmartNet Configurator will allow SmartNet
Transformation Manager to benefit from the work done in WP4 and WP6.
13
28.07.2017
SmartNets
SmartNets Compendium
14
28.07.2017
SmartNets
SmartNet Compendium
 Related task:
 Related deliverable:
 Related milestone:
 Responsible:
 Due date:
 Old name in DoW:
T9.2, T9.3
D9.2
MS11
DITF
M33
SmartNet Compendium
To reach maximum impact from the new SmartNets industrial model, companies will have to realise
not only the different modules introduced in earlier work packages, but the whole industrial model. In
this task, the SmartNet Compendium will be developed, presenting guidelines how the model from
T9.2 can be implemented in company practice. The SmartNet Compendium will include the guidelines
available for the various modules, and will highlight interaction possibilities and limits between these
modules. The SmartNet Compendium will furthermore also give step-by-step introduction how to reach
the high level of sustainability and efficiency targeted by the industrial model ‘Smart Networks’.
15
28.07.2017
SmartNets