PDO letterhead From: Contract Holder Date: Insert date To: Insert Contractor CEO Name & Contract Manager Insert Contractor company Name Insert Contractor contact details CC: Suleiman Tobi (OSD), Contract Owner & Hamad Al Khalfeen (MSE/1) Dear insert name, Re: 2012 Letter of Assurance Verification Process This letter follows the email correspondence from Suleiman Tobi (OSD), on the subject of the HSE LoA submission, sent on 20th Feb 2012. Specifically, please be notified as follows: Your company has been selected to undergo the verification process The verification activity for your company will be conducted between insert start date and finish date. The verification will be conducted as per the attached Terms of Reference. As such, it will focus on sampling the following contract: o Insert contract name and number The verification activity will commence at 8.30 hrs on the XXXX in PDO’s G 234 conference room, with a joint meeting between yourselves and the verification team. PDO requests that you and your GM, contract manager and HSE manager attend. You may invite other attendees from your organisation, as appropriate. At this meeting the verification team leader will deliver a 30 minute presentation, describing the process to be followed in line with the Terms of Reference sent to you. Following this, PDO requests that you or your delegate, make a presentation of approximately 30 minutes duration. This presentation should cover the following: o A summary of the response given to the “HSE Letter of Assurance” and “HSE Capability Questionnaire” o Overview of Contractor HSE MS o Overview of Contract HSE Plan including Insert Contract number o Overview of the Contractors 3 year HSE performance. The verification activity will conclude with a closing presentation delivered by the verification team leader. PDO request that you and your Contract Manager attend. You may invite other attendees from your organisation, as appropriate. This presentation will last for approximately one hour. It will take place in PDO’s G 234 conference room, and will commence at 8.30 hrs on the XXX of XXX 2012. Finally, PDO request that you appoint two focal points to assist the verification team by gaining access to relevant Contractor people, sites, accommodation, transport, documentation, meeting rooms and the other resources required to conduct the verification. The roles of the focal points should be broadly as follows: o A primary focal point to assist in planning the verification activity and to facilitate the “office-based” part of verification activity. This person should be familiar with the HSE Letter of Assurance and the HSE Capability Questionnaire. In the first instance, this person will work with PDO representatives to finalise the Terms of Reference. As such, PDO suggest that this person be your Contract Manager or HSE Manager. o A second focal point to facilitate the verification activities to be conducted “at site”. We would be grateful if you could advise the names of the focal points as soon as possible. We look forward to your co-operation in this exercise. Regards Insert Name of Contract Holder ATTACHMENT 1 GENERAL TERMS OF REFERENCE Terms of Reference Letter of Assurance Verification CONTRACTOR Verification Dates Xx/yy/2012 Prepared by: MSE12 Table of Contents 1. Background ............................................................................................................ 5 2. Objectives .............................................................................................................. 5 3. Scope ...................................................................................................................... 5 4. Logistics ................................................................................................................. 5 4.1 4.2 4.3 4.4 Office requirements: .....................................................................................................6 Computer arrangements: ..............................................................................................6 Secretarial support: .......................................................................................................6 Transport: .....................................................................................................................6 5. Pre-reading material ............................................................................................... 6 6. Security arrangements ............................................................................................ 6 7. Agenda and Timing................................................................................................ 7 8. Methodology .......................................................................................................... 8 9. Reporting................................................................................................................ 8 Appendix A – Pre-reading list ....................................................................................... 9 Background Contractor HSE Management is one of PDO’s 4 “Must Win” HSE projects in 2011. A key element of this project is to improve the manner in which PDO obtains assurance as to the HSE management controls implemented by its contractors. To this end, PDO is undertaking a contractor HSE Letter of Assurance process, and associated verification exercise. Objectives The verification will check the validity of statements made by the contractor in the: HSE Letter of Assurance The verification will also provide PDO with information which can be used to evaluate contractors in future tenders. Scope Although the statements made by the contractor in completing the HSE Letter of Assurance relate to all activities conducted under contracts with PDO, the verification activity will sample only the following contracts: Cxxxxxxxxx This contract shall be sampled by visiting the contractor’s offices in Muscat, and field activities. Verification Team Composition: contract 1 2 3 4 5 Name Khalifa Al Harthy Kevin Doyle/Nasser Touqi CH HSE Team Leader A specialist as may be required Position in team Team Leader Secondary Leader Member Member Member Logistics The Contractor has nominated the following as verification focal points: To be appointed by contractor The role of the focal point is to assist the verification team by gaining access to relevant Contractor people, sites, accommodation, transport, documentation, meeting rooms and the other resources required to conduct the verification. The verification team will be based in the following locations during the exercise: Office: Indicate location in Muscat Interior Site: To be decided Office requirements: One meeting room throughout the review period which can comfortably sit 8 to 10 people, including projection screen and overhead projector, blinds/curtains for windows and 2 power extension cords for PCs. In addition, 1 off small office comprising 4 desks, or open office plan work stations for each review team member. Computer arrangements: The review team members will each have their own laptop computers. However, two off dedicated PCs should also be made available for the team. These PCs should be configured to enable internet access and to provide network printing capabilities. Secretarial support: A part-time secretary is required. He/she should be familiar with MS Word and PowerPoint. He/she may be required from time to time, to assist the review team. Transport: Transport arrangements are required to/from office and site. Pre-reading material Pre reading material identified in Appendix A will be made available on 14th of May 2011 for the team to review prior to verification. This will ensure that the review team will be familiar as possible with the project. Security arrangements All review team members will require standard security/access passes for the contractors offices for the review period. Also local safety induction sessions that the team will be required to attend shall be scheduled. Typical Agenda and Timing The verification will commence on xx/yy/2012 will be conducted over the course of 5 days, with a close out presentation on the xx/yy/2012 Day 1 (Sat) 8:30 – 9:30 Location – Green 234 Introductions – Suleiman Tobi (OSD) Purpose of the LOA verification process – MSE1 LoA verification process and ToR – MSE12x 9:30 12:00 13:00 – 17:00 Day 2 (Sun) Day 3 (Mon) Day 4 (Tue) AM Team review of findings Travel to agreed field site (Flight Booking and accommodation organised by CH) PM Work Shop/Site inspection and Interview Site inspection & Interview AM Interview + site inspection PM Team review of findings AM Return to Muscat Team collate findings PM Day 5 (Wed) AM Day 6 8:30 – 10;30 (Sat) LoA Submission presentation by contractor CEO Relocate to contractor office - Team review (ToR, verification work plan, pre-reading submission) Team review HSE LoA Submission, Interview + document review Preliminary review with Contractor HSE department and prepare close out presentation Preparation of presentation for closing session Location – GR 234 Meeting Office Introductions – Suleiman Tobi, OSD LoA verification process findings - MSE12 Methodology The team members shall gather information by observation, through interviews and by checks of hardware and documentation in line with the verification work plan. Conscientious efforts shall be made to verify findings and to confirm the validity of recommended actions. Where judgement is required the result shall be determined by consensus within the team. Reporting The team shall present the verification results to the Contractor in a closing presentation. The verification team leader shall prepare a letter confirming verification findings within one week after the close-out presentation. Where verification evidence varies from claims provided by the contractor, the letter shall contain any necessary qualifications to the Letter of Assurance. It shall also propose a Focused Action Plan, as necessary, to address any such qualifications. Appendix A – Pre-reading list: Required Pre-reading LoA item 1.1 HEMP HEMP Procedure Contract HEMP Controls plan TBT Procedure TBT schedule/attendance Log TBT material, guides, training etc Example TB covering a range of activities Example PTW covering a range of activities HSE plan 1.2 Life Saving Rules LSR Roll out plan and communication plan communication method and examples Consequence management system, procedure. Implementation plan Records of communication activities 1.3 Road Safety Road Safety/Transport Procedure Commuting Policy Gap analysis against SP2000 Implementation plan Audit/review report for compliance against SP2000 RAS certification Example of Vehicle checklists List of drivers on PDO Contract and training records 1.4 HSE Incident Management Incident Management procedure List of incidents Example of incident report for consequence 4/5 Dissemination or cross learning methodology Action tracking list for previous 12 months with status of actions. Close out example from consequence 4/5 close out report. 1.5 Staff Training Procedure Company training matrix Completed training record for PDO personnel or register etc. STOP/equivalent procedure Stop/equivalent program STOP/equivalent register, trend analysis STOP/Equivalent training records STOP/Equivalent audit report CA&A procedure CA&A program List of critical HSE roles, tasks etc List of personnel undergoing or undergone assessment Example of record with assessment and gap analysis. List of personnel/positions at site 1.6 Performance Reporting and Execution Performance reporting procedure Monthly and annual returns Analysis reports Audit and action tracking procedure Audit schedule Audit report for pervious 3 audits Action tracking log including outstanding/overdue actions Management review procedure with latest management review report/minutes of meeting etc 1.7 Sub-contractors HSE contractor management Procedure Subcontractor requirements/checklists Contract/ subcontractor Risk assessment List of current subcontractors Consequence management framework Contractor penalization system Methodology for Communicating to contractors 1.8 Asset Integrity – Process Safety Management Asset Integrity Strategy Asset Integrity Program list of safety/environmental critical equipment Performance standard listing for critical equipment Inspection schedule for critical equipment 1.9 Health Medical Emergency procedure List of medical equipments/facilities List of medical personnel Medical Emergency drills and exercises Medical Examination procedure List of Fitness To Work assessments for personnel List of HACCP certified contractors and subcontractors 1.10 Environment Waste management procedure List of current waste inventories Example waste consignments for Chemical waste Waste segregation methodology Storage method statements for Chemical storage List of STP and RO plants and certification available.
© Copyright 2026 Paperzz