DFW Airport TERMINAL E – TRIP PHASE 4 – Package 13.5- ACM Removal Project Overview The intent is to award a lump sum subcontract for the areas as Identified in the Consultant Packages. Work for these Packages is further detailed in the Scope of Work and the Minimum Specifications for Asbestos Abatement. Project Change Highlights Minority Paper work and Participation have changed in the TRIP Program Self Performance is now counted at the First Level Current Certification Certificates are required with the bid Project Team MBJ3 • • • • • • • • Keith Cooper – VP/Construction Manager Jeff Weeks- Senior Project Manager Charlie Williams – Project Manager James Averitt – Superintendent Cleave Magers- Safety Director Bill Saunders – QA/QC Director Rick Harris– Senior Estimator Ricardo Cardoza D/M/WBE Coordinator Insurance – Insurance is Listed in Bid Manual • Subcontractors are responsible for carrying all insurance per MBJ3 insurance requirements which include; – – – – General LiabilityAutomotive Liability Workers Compensation Excess Liability Reference Exhibit G for amounts Reference Exhibit G for amounts Reference Exhibit G for amounts Reference Exhibit G for amounts • Verify with your Agent that you have the proper insurance • Check for Certificate and requirements DFW ROCIP Program • • DFW ROCIP INSURANCE IS NOT APPLICABLE TO THE ACM PACKAGE DFW ROCIP SAFETY PROGRAM IS HOWEVER APPLICABLE Site Logistics – Temporary facilities are responsibility of each Subcontractor. – Night deliveries to project for just in time delivery is recommended – Access from the Landside must include Traffic Control procedures Jobsite Access » All employees must have SIDA badge » All vehicles entering AOA will require stickers for access. » Offsite parking and shuttle service to work site will be provided by others. » One way travel from parking to site is approximately 15 minutes PROJECT SCHEDULING • Project Schedule issued with Bid Documents – All work to be completed per the schedule. – Secondary Shift work as necessary so as not to interfere with DFW Airport Operations • Concurrent work in Terminal E – BHS System – Phase 4 Finish PROJECT SCHEDULING • Project Phasing is as indicated in the Schedule and on the Plans. This Project is Phase 4 Only. – Package 13.5 includes the areas indicated as R10, R11, C03, C04 & C08 – Construction noise abatement will also require Secondary Shift work Bid Package 13.5 – R10, R11, C03, C04 & C08 (Pkg. #5 & #6 on Drawing) Bid Submittal • Bids shall be submitted in sealed envelopes clearly labeled with the following information: – Project Name – Contract Name – Name of the Bidding Company – Company contact information • Envelope Contents Include: – Preliminary Schedule of Subcontractors (PSS) – Reflects the preliminary D/M/WBE participation that the bidder is including in their bid. – Documentation of the Good Faith Effort if specified D/M/WBE goals are not met. – EMR Rating – Reflects safety record for projects from previous three years. – Bid Bond- 5% of greatest amount bid. Cashier’s checks are not accepted. – Bid Form – filled out completely, including unit pricing and alternates and Qualifications – Current D/M/WBE Certification Certificates for D/M/WBE subs, and bidder (if applicable) – All of the above forms are provided within the proposal package. Private Bid Opening • The Construction Manager at Risk (CMAR) and DFW Airport Representatives will open The Envelope and proceed accordingly: – If any part of information submitted in the Envelope is missing or is not in conformance with the instructions listed in the bid documents, the bid is considered non-responsive. – This includes the required certificates – If all of the documents are acceptable and conform to the bidding requirements, the CMAR will review the bid for scope and schedule. – The CMAR may contact some or all of the bidding companies to schedule a post-bid interview. M/WBE Administration • • • Purpose of M/WBE Program is to provide contracting and consulting opportunities to minority and women- owned businesses. The MBJ3 team is committed to supporting the DFW Airport Board and maximizing M/WBE participation. The MBJ3 team works in concert with the DFW Business Diversity & Development Department (BDDD), who is responsible for administering the Airport’s M/WBE Program. D/M/WBE Administration cont… • Certification – The Airport requires that M/WBE’s be certified at the time of bid by a certification agency approved by the Airport Board. • North Central Texas Regional Certification Agency (NCTRCA) • Women’s Business Council Southwest (WBCS) • DFW Minority Supplier Development Council (DFWMSDC) – DFW TRIP Program does not recognize HUB certification. – DFW strongly recommends using certified D/M/WBE firms. – Remember that VALID certificates are due at the time of bid. D/M/WBE Administration cont… • • • • D/M/WBE goals can be counted through all tiers MBJ3 is considered the “Prime.” The bidder for the package is considered the “1st-Tier” and the subcontractors for the package are considered “2nd-Tier.” A D/M/WBE bidder’s (1st Tier-Subcontractor) self-performance can be counted toward the goal (10% for this contract) – If the D/M/WBE bidder is unable to reach the goal through their self performance, the remainder must be reached through 2ndtier participation M/WBE Administration cont… • • • When utilizing M/WBE Suppliers, only 60% of their subcontract value is credited towards the M/WBE goal. It is the DFW Airport Board’s expectation that the bidder/proposer will meet and/or exceed the set participation goal. The subcontracting teams should not only be diverse in terms of their business disciplines, but also in terms of their ethnic diversity. M/WBE Administration cont… • M/WBE Assistance – Minority and women-owned businesses not certified by any of the approved certification agencies should contact the appropriate M/WBE Coordinator for assistance; – MBJ3 – Ricardo [email protected] – If companies have not worked with M/WBE firms before, the MBJ3 Program Coordinator can provide a listing of certified M/WBE firms by specific trade or service – You may also access the M/WBE Directory via DFW Airport website: www.dfw.diversitysoftware.com DFW Airport Board Rolling Owner Controlled Insurance Program Capital Assistance and Bonding Program Our Purpose: To provide bond training, education and assistance to support to D/M/WBE firms working at DFW Airport. Seminar & Workshops • Certificate Program o 3 Month Commitment • Attend a one-day bond seminar • Attend two 3-hour workshops per month o Certificate of Completion to take to your insurance or bonding agent o Dedicated one-on-one assistance with bonding, capital assistance, business plan and financial statement preparation Seminar & Workshop Schedule Each Quarter • One Bond Seminar (all day) • Five 3-hour Workshops o Estimating & Bidding o Project Management o Business Planning & Management/Financial Statements o Banking, Finance & Access to Capital o Insurance 101 Capital Assistance & Bonding Program Contact Information: Velina Willis 972-972-2393 [email protected] Please contact me for complete class schedules and registration. SITE SPECIFIC SAFETY PLAN • • • • • • Each Subcontractor Will Submit a Job Specific Safety Plan Drug Testing by Subcontractor & ROCIP Administration No Weapons on Job Site Daily Job Hazard Analysis (JHA)s must be submitted Safety Overview • Some MBJ3 Policies Exceed OSHA• Dress Code • GFCI Pigtails Required at all times. Hard Hats, Safety Glasses, and Vests Full Time: Everyone – Contractors, Vendors, Suppliers, Etc. Important Dates Documents Are Available Now • • Last Questions Due Tuesday April 19, 2016, by 11:00 AM Last Addendum Friday April 22, 2016 • Bids due Thursday April 28, 2016 at 2:00PM in the DCC Lobby not the MBJ3 trailer. • Post Bid Interviews as needed in the Following Weeks TURN IN LOCATION DCC OLD ADE NEW DCC Bidders Questions submitted by Tuesday April 19, 2016 by 11:00 A.M. to the following individuals Contact for General Questions Rick Harris – [email protected] Bidders Are Responsible for Checking The DFW Solicitations Site for Addendum Notices. http://www.dfwairport.com/business/solicitations/index.php
© Copyright 2026 Paperzz