eTransport Walkthrough Run Slide Show for full

eTransport Walkthrough
... Run Slide Show for full advantage ...
Bjorn H. Bakken, PhD
[email protected]
SINTEF Energy Research
www.energy.sintef.no
www.sintef.no/etransport
SINTEF Energy Research
... Opening the case ...
Select existing case
from database or
press New
Pan & Zoom
window
Energy system
drawing
‘Drag and drop’
component
library
Operation and
investment analysis
1. Set Timesteps ...
1-3 days (24-72 timesteps) per
segment are recommended for
operational analysis
2. Set Segments ...
The load and price profiles
given for each component is
multiplied with the Coefficient
for the respective Segment
Any number of Segments
(seasons) may be specified
by clicking New.
The sum of Weight over all
Segments must equal one
year (365 when Timestep is
set as 24 hours)
3. Set Years ...
The Years parameter defines
the Investment periods in the
case. They do NOT have to be
of equal length.
The load and price profiles
given for each component is
multiplied with the Coefficient
for each Year
... Case layout ...
Utility buy-back market
Electricity
spot market
Electricity and
heat loads
Electricity grid
CHP alt. 3:
High quality wood
waste fired CHP
CHP alt. 2:
Low quality waste
fired CHP
CHP alt. 1:
Gas fired CHP
Electric peak load
boiler
District heating
grid
Technology specific
data used by
Operational analysis
... Heat load ...
Data used by Investment
analysis; included in all
components
When no parameters are
given, this component is valid
in all Segments, Years and
Investment alternatives
... El source ...
These tables are always
displayed as a function
of the Timesteps setting
(here: 24)
... El market ...
The El market is an option
to sell electricity at a given
price (constant or variable).
Can also represent a Load.
... Power line ...
eTransport uses DC Power
Flow to calculate the
electricity network flows. Any
number of lines and cables
may be specified.
... DH pipeline ...
... Gas source ...
This source is included
in Investment
alternative CHP1
The pressure setting is only
valid when the Gas Source is
connected to a Gas Node in
a gas network.
... Waste source ...
This source is included
in Investment
alternative CHP2
... Storage ...
... Gas fired CHP ...
... Boiler ...
The boiler is defined
as a separate
Investment alternative
... Investment setup ...
Select Edit
Investments from
the Data menu...
...or Investment
Parameters from
any component
... Run investment analysis ...
Combination & timing of investments:
Red=Not allowed
Green=Allowed
Yellow=Mandatory combinations
-> NB: The combination matrix must
be evaluated horizontally
The report from the AMPL
solver can be inspected e.g. to
search for deficit penalties or
errors
... View results: Investments ...
Choose variables
to display
Investment
alternatives list;
Click to highlight
components on
drawing screen
... View results: Investments ...
Choose variables
to display
Ranked list of
investment
alternatives
4 types of emissions
calculated for all alternatives
Tree structure shows the
components included in
each investment alternative
... View results: Operation ...
Selected components
highlighted on screen
- the user can scroll through any combination of Rank, Period and Segment
Operational analysis for
Rank 1 (CHP 2 + Boiler)
...for Period 2010-2015...
Select variables
eTransport Walkthrough
Contact:
Bjorn H. Bakken, PhD
[email protected]
SINTEF Energy Research
www.energy.sintef.no
www.sintef.no/etransport