eTransport Walkthrough ... Run Slide Show for full advantage ... Bjorn H. Bakken, PhD [email protected] SINTEF Energy Research www.energy.sintef.no www.sintef.no/etransport SINTEF Energy Research ... Opening the case ... Select existing case from database or press New Pan & Zoom window Energy system drawing ‘Drag and drop’ component library Operation and investment analysis 1. Set Timesteps ... 1-3 days (24-72 timesteps) per segment are recommended for operational analysis 2. Set Segments ... The load and price profiles given for each component is multiplied with the Coefficient for the respective Segment Any number of Segments (seasons) may be specified by clicking New. The sum of Weight over all Segments must equal one year (365 when Timestep is set as 24 hours) 3. Set Years ... The Years parameter defines the Investment periods in the case. They do NOT have to be of equal length. The load and price profiles given for each component is multiplied with the Coefficient for each Year ... Case layout ... Utility buy-back market Electricity spot market Electricity and heat loads Electricity grid CHP alt. 3: High quality wood waste fired CHP CHP alt. 2: Low quality waste fired CHP CHP alt. 1: Gas fired CHP Electric peak load boiler District heating grid Technology specific data used by Operational analysis ... Heat load ... Data used by Investment analysis; included in all components When no parameters are given, this component is valid in all Segments, Years and Investment alternatives ... El source ... These tables are always displayed as a function of the Timesteps setting (here: 24) ... El market ... The El market is an option to sell electricity at a given price (constant or variable). Can also represent a Load. ... Power line ... eTransport uses DC Power Flow to calculate the electricity network flows. Any number of lines and cables may be specified. ... DH pipeline ... ... Gas source ... This source is included in Investment alternative CHP1 The pressure setting is only valid when the Gas Source is connected to a Gas Node in a gas network. ... Waste source ... This source is included in Investment alternative CHP2 ... Storage ... ... Gas fired CHP ... ... Boiler ... The boiler is defined as a separate Investment alternative ... Investment setup ... Select Edit Investments from the Data menu... ...or Investment Parameters from any component ... Run investment analysis ... Combination & timing of investments: Red=Not allowed Green=Allowed Yellow=Mandatory combinations -> NB: The combination matrix must be evaluated horizontally The report from the AMPL solver can be inspected e.g. to search for deficit penalties or errors ... View results: Investments ... Choose variables to display Investment alternatives list; Click to highlight components on drawing screen ... View results: Investments ... Choose variables to display Ranked list of investment alternatives 4 types of emissions calculated for all alternatives Tree structure shows the components included in each investment alternative ... View results: Operation ... Selected components highlighted on screen - the user can scroll through any combination of Rank, Period and Segment Operational analysis for Rank 1 (CHP 2 + Boiler) ...for Period 2010-2015... Select variables eTransport Walkthrough Contact: Bjorn H. Bakken, PhD [email protected] SINTEF Energy Research www.energy.sintef.no www.sintef.no/etransport
© Copyright 2026 Paperzz