A B C D E 1 1 2 2 3 3 4 4 5 5 12a 32c 33 32 12 06 05 09 09a 07a

Laboratory 1
Directorate
Press and public relations
Company medical officer
Seminar room 3a-5
Library
Laboratory 2a, Theory
Computer centre, UCO
Radiation Protection D3
Storage building
Auditorium (DESY), entrance building 6
Administration building
Post, Guest services
Administration building
Guest house 8
Canteen, cafeteria, bank
Bistro
Workshop
Purchasing department
Central warehouse
Social counselling / works council
Gate lodge Notkestraße
(main gate)
Gate lodge Luruper Chaussee
(side gate)
Gas service
Vacuum laboratory
CSSB
MKK / Power station
Cooling plant DESY II
Heating plant
Site service yard
Carpenters’ building
Synchrotron building
Power house DESY
LAOLA
Laboratory of the Universities
of Hamburg and Lübeck
REGAE
LINAC II
PIA
DORIS experimental hall
Office and laboratory building EMBL
FS office and laboratory 1
Detector laboratory
FS office and laboratory 4
FS office and laboratory 5 & 2
Experimental hall I / LINAC III
FLA laboratory
DESY testbeam / experimental hall II
Testing area
Experimental hall III
Cryogenic hall
FLASH tunnel
FLASH experimental hall
„Albert Einstein“
FLASH experimental hall
„Kai Siegbahn“
FLASH2 undulator building
FLASH laser hut
Iron removal plant
Accelerator control room (BKR) /
SINBAD
Supplying hall
Accelerator operation building
ARGUS detector
Accelerator components building
Guest house 2
Kindergarten
Guest house 3
Training area
01-01e (B3)
01 (B3)
01 (B3)
01a (B3)
01b (B3)
01d (B3)
02a (B3)
02b (B3)
03 (D4)
03b (D4)
05 (B4)
06 (B4)
06 (B4)
07 (B4)
07a (A4)
09 (B4)
09a (B4)
10 (B4)
11 (C4)
11a (C4)
11a (C4)
12 (C5)
A
B
46a
1
45
45a
45b 45c
45d
55
02a
3
02g
01b
238
01a
43a
43
07a
43c
43b
43d
09a
05
07
BuildingFloor
Room
01
First floor
021
01e
Ground floor 528
02b Basement011b
03
Third floor
323
05
Ground floor 005
07
Third floor
309
09a
First floor
106
10
First floor
116
11 Basement006
15
First floor
259
25b
Ground floor 029
25c
Ground floor 004
25f
Ground floor 063
28c
Ground floor 025a
30
Second floor 223b
30b
First floor
165b
34
Ground floor 006
46g
Ground floor 016
47c
First floor
L112a
48f
Basement
014
50
Seventh floor 733
55
Ground floor 007
72
Ground floor 005
99
Ground floor 017
34
01
09
231
231
234
10
14
42a
228
DESY sports 30e
42c
3
AER21
48f
17
18a
239
80b
80d
80e
41a
11b
11
600
80c
03b
80f
Off-site buildings:
80g
51 HERA hall N
52 HERA hall E
53 HERA hall S
(E3) AER21 Project management agency
(E4) NKS15 Finance departement (Notkestr. 15)
04
04a
Sports ground
Wilhelmshöh
Main Gate
64c
Side Gate
12a
4
11a
ground
69
66
61
41
16h
Baustelle
MPG
206
13
06
42b
20c
16g
65
62
19
232
18
35
16
16d
48a
15
22
23
20
21
90
48e
24a
30c
20d
48
48b
22a
26
13a
68
24
34a
13b
25e
30b
20a
20b
26a
222
25a
30
2
67
25b
221
27
01c
67b
230
229
25
25d
01e
01d
47c
30d
237
25c
27a
02b
212 47e
99
30a
36a
55a
47d
25f
16c
28f
218
28
37
44a
5
29
44c
44
28b
28a 28e
28d
29a
36
47
28l
28m
38 217
47i
1
16f
70
47h
54
2
28k (C1)
(C2)
(C3)
(C4)
(C2)
(C5)
(C5)
(C5)
(B3)
16e
28i
12
32
32c
03
33
34a School lab physik.begreifen
35 Safety group / SAVE
communication engeneering
(B2) 36 Preparation hall /
experimental hall V
(B2) 37 Assembly hall
(C2) 38 Storage building
(C4) 41, 41a PETRA halls SO
(B4) 42, 42a-c PETRA halls S
(A4) 43, 43a-b PETRA halls SW
(A2) 44 PETRA halls W
(A1) 45, 45a-c PETRA halls NW
(B1/C1) 46a-c PETRA halls N
(C1) 46g PETRA III experimental hall
„Paul P. Ewald“
(C1) 47 PETRA halls NO
(D1-2) 47c PETRA III experimental hall
“Max von Laue”
(D1) 47d PETRA III cooling plant
(D2) 48, 48e PETRA halls O / EMBL
(D3) 48f PETRA III experimental hall
„Ada Yonath“
(C1) 49, 49a Office and laboratory building
(B2) 50 HERA hall W
(B2) 54 Refrigeration technology hall
(Cryogenic control room)
(B2) 55 Magnet measurement hall
(B2) 55a Proton vacuum building
61-69 University Hamburg
(D3) 61 Auditorium (university)
(D3) 62 Institute of experimental physics
(D3) 65 Workshop
(D3) 66 HZG Helmholtzzentrum
Geesthacht
(D3) 67 SALOME
(D-E2) 67- 68 Institute of experimental physics
(E3) 69 Institute of laser physics
(C2) 70 Module test hall CMTB
(B1) 71 XTL mock up
(B1) 72 AMTF hall
(D4) 80b-g Storage buildings
(E2) 90 Centre for optical quantum
technologies (ZOQ)
(D2) 99 CFEL
(E2) 90 Light & Schools (School lab)
(D2) 222 FS laser
(D/E4)
600 CHyN
(A2) 702 European XFEL entrance
(A2) 703 European XFEL modulator hall
(B2) 700 European XFEL injector entrance
(C3) (C3) E
28k 215
28i
28g
31a
224
4
72
233
50
44b 240
49a 49
49c
49b
223
49d
225
28h
46d
XHEE
XSE
30a 30b 30e 31a 32 32c 33 34 46h
28c
46c
71
13a,b (C3)
14 (C4)
15
(D3)
16 (C3)
16d (C3)
17 (C3)
18,18a (D3)
19 (D3)
20 (C3)
20c (C3)
22 (C3)
22a (C3)
(C1)
(C1)
(C2)
(C2)
46b
46e
72a
XHM
28i 28g 29 30 D
46g
12a (E3)
23 (C3)
24 (D3)
24a (D3)
25 (C2)
25a (C2)
25b (D2)
25c (C2)
25d (C2)
25e, f (D2)
26 (C3)
26a (C3)
27 (C3)
27a (C2)
28 (C2)
28a (C2)
28b (C2)
28c (C1)
C
03a
5
Parking on the DESY premises is at
your own risk. All city traffic regula­
tions are valid and a speed limit of
30 km/h is allowed.
Upon leaving the DESY premises
random spot checks will be made at
both gates. Please halt at the red
traffic signal or the horn signal for
inspection.
October 2016