Market Process Definitions Gas MaP Project MPD18 – Safety Lock Notification and Turn-on Meter Version 3.0 Approved 3rd November 2008 Market Process Definitions Table of Contents Table of Contents ............................................................................................................ ii Revision History .............................................................................................................. ii 1. Introduction.............................................................................................................. 3 1.1 Scope .............................................................................................................. 3 1.2 History of Changes .......................................................................................... 3 2 Market Process Map ................................................................................................ 4 3 Market Process Description ..................................................................................... 5 4 Supplementary Information ...................................................................................... 7 4.1 Key Notes ........................................................................................................ 7 Revision History Version Date Revision Description 2.0 26/10/2006 Base-lined on the basis of CER approval on 15/09/2006 2.9 3.0 16/09/2008 03/11/2008 Draft for approval – baselining for go-live Base-lined on the basis of CER Approval on 17/10/2008. Market Process Definitions 1. Introduction 1.1 Scope This process covers the interaction between the Transporter, End-User and the Shipper when the Transporter requires that Safety Lock and Turn-On Site Works activities be conducted for operational reasons. 1.2 History of Changes Source of Changes Description of Change CR021 Baselined for go-live and changes made in line with Change Request 021 ________________________________________________________________________ MPD18_Safety Lock Notification and Turn-on Meter_v3.0 v3.0 3 of 7 Market Process Definitions 2 Market Process Map PROCESS : MPD18 - SAFETY LOCK NOTIFICATION AND TURN-ON METER END USER REGISTERED SHIPPER TRANSPORTER Start 1 Need to Lock Meter for Safety Reasons 4 Receive "Notice of Hazard" and Arrange Registered Installer to Fix the Problem Notice of Hazard POST Notice of Hazard 3 Send "Notice of Hazard" to the End User 2 Relevant Job Details are entered to Transport Systems and Meter Point Status is Set to "Safety Lock" MPD8 - Meter Read Information Market Process 5 Create Site Works Activity Request for "Turn-On Meter" on Transport Systems 10 Confirm Gas Status and Arrange Appointment 8 Call Center Monitors Turn-On Meter Requests and Directly Calls the End User to Arrange Appointment Details 9 Is Customer Contact Made? YES PHONE 11 Update Appointment Details on the Transport System and Complete the Site Works Activity for "Turn-On Meter" or Relevant Quality Control Check NO PHONE 12 Continue Trying to Make Contact with End User NO 6 Site Works Activity Complete? YES 13 Is Customer Contact Made Within One Month? YES 7 Key-in Site Works Job Completion Details to the Transport Systems NO 15 Receive the Letter and Make Contact with Call Centre Contact Request Letter POST 14 Issue a Letter to End User Stating That Service is Going to be "Disconnected" MPD8 - Meter Read Information Market Process Contact Request Letter PHONE POST 16 Is Customer Contact Made Within 10 Days? YES NO 17 Create "Disconnect Meter" Site Works Activity on Transport Systems MPD16 - Creation and Completion of Operational Site Works Request NDM Market Process ________________________________________________________________________ MPD18_Safety Lock Notification and Turn-on Meter_v3.0 v3.0 4 of 7 Market Process Definitions 3 Market Process Description Step Role Actions Interfaces 1 to 3 Transporter The Transporter identifies the need to lock a meter Post to End for safety reasons. The Site Works job details are User entered on the Transport Systems and the Meter Point Status is set to “Safety Lock”. A “Notice of Hazard” is sent to the End User. MPD8 - Meter Read Information Market Process is instigated. 4 5, 8 End User Transporter and 9 The End User receives the “Notice of Hazard” and Post from arranges a Registered Installer to fix the problem. Transporter A Site Work Activity Request for “Turn-on Meter” is Telephone to created on the Transport Systems. These “Turn- End User on Meter” requests are monitored by the Transporter’s call centre staff, who contact the End User by telephone to arrange an appointment. 10 The End User confirms the Gas Status and agrees Telephone from an appointment. Transporter If the initial attempt to contact the End User by Post to End 13 telephone fails, the Transporter will continue to try User and to contact the End User by telephone for one 14 month. If contact has not been made after one 12, End User Transporter ________________________________________________________________________ MPD18_Safety Lock Notification and Turn-on Meter_v3.0 v3.0 5 of 7 Market Process Definitions month, a “Contact Request Letter” is posted to the End User, asking them to make contact with the Transporter’s call centre and stating that their service is going to be “disconnected”. 15 End User The End User receives the “Contact Request Post from Letter” from the Transporter and makes contact Transporter with the Transporter’s call centre. 16, Transporter 17 If contact is not made with the End User within a Post / further 10 days of issuing the “Contact Request Telephone from Letter” a “Disconnect Meter” Site Works Activity is End User created on the Transport Systems and MPD16 – Creation and Completion of Operational Site Works Request Market Process is initiated. If the customer does make contact, an appointment is agreed. 11, 6 Transporter Once an appointment is agreed with the End User, the details are updated on the Transport Systems and the Site Works Activity for “Turn-on Meter” (or relevant Quality Control Check) is carried out. 7 The Operational Site Works Job Completion Details are keyed in to the Transport Systems and MPD8 - Meter Read Information Market Process is instigated. ________________________________________________________________________ MPD18_Safety Lock Notification and Turn-on Meter_v3.0 v3.0 6 of 7 Market Process Definitions 4 Supplementary Information 4.1 Key Notes Meter Read Information entered as part of the Safety Lock and Turn On Site Works Job Completion will send validated Meter Read Information details as part of the Meter Read Information Market Message as outlined in the MPD8 – Meter Read Information Market Process to the Shipper. The Meter Read Information Notification market message will be triggered by Transport Systems through the working day, once the read details are validated based on the NMD read index validation rules at the Site Works job completion stage. Planned outages will be available via Transport Extranet. Shippers will contact the Transporters Call Centre for unplanned outages. Shippers will contact the Transporter’s Call Centre for Leaks/No Gas queries. ________________________________________________________________________ MPD18_Safety Lock Notification and Turn-on Meter_v3.0 v3.0 7 of 7
© Copyright 2026 Paperzz