ELIGIBLE PROJECTS 2016 / 17 APPENDIX 1 Tier 5 Perimeter barrier around playing area constructed of 50mm galvanised steel tube Dug outs for a minimum of 8 people each Minimum 2 dressing rooms, each with separate showers, WC and hand basin Separate dressing room for match officials ( minimum 3 people) with own showers, WC and hand basin All dressing rooms to be in good condition with adequate heating, lighting and ventilation WC facility for male spectators WC facility for female spectators Covered area for minimum 100 spectators Tiers 3 and 4 Public Liability insurance and Risk Assessment Guaranteed use of the stadium minimum 10 years Perimeter barrier around playing area constructed of 50mm galvanised steel tube Minimum dimensions for playing area as FAW rules Adequate drainage to playing area. Applications must include an Institute of Groundsmanship technical report 250 Lux floodlights Applications must include a design report from Floodlighting and Electrical Services (FES) Ltd Minimum 2 dressing rooms, each with separate showers and WC Separate dressing room for match officials ( minimum 3 people) with own showers and WC All dressing rooms to be in good condition with adequate heating lighting and ventilation Upgrade changing room showers Replacement boiler to heat changing room showers Dug outs for a minimum of 8 people each Concrete hard standing minimum width 1.00m, maximum width 1.83m, minimum depth 10cm to at least one length of the pitch Security shutters to secure stands and dug outs Covered area for minimum 100 spectators Tier 2 500 Lux floodlights Applications must include a design report from Floodlighting and Electrical Services (FES) Ltd P. A. System Dug outs 13 man each Medical / first aid room for players WC facility for disabled spectators Spectator access to all four sides of the pitch Clear signage for spectators Minimum capacity 1500 (minimum 500 covered seats) Solid boundary around ground Minimum 2 turnstiles Police control room Car parking at ground Drug test room Divide spectator areas Parking for media Photographer facilities Press box / media facility TV studio / commentary positions Grass verge around playing area Welsh Premier Women’s League THE LIST BELOW IS THE CURRENT WPWL GROUND CRITERIA Clubs shall have recognisable barriers, and with the exception of a main entrance point to allow the taking of admission prices from spectators, shall be fully enclosed. The boundary enclosure shall be of a robust structure with a minimum height of 4’ 6” and be capable of preventing unauthorised access. All clubs shall have the playing area of the ground enclosed by a solid barrier during the playing season (rope or wire is not acceptable) The dressing rooms for both teams must be heated, well ventilated, free of damp, secure and must be situated within the boundaries of the ground. Separate changing rooms must be provided for both teams, capable of accommodating a minimum of 16 persons. Clubs must have toilet facilities of at least one W/C and one hand basin with hot and cold running water within the immediate vicinity of the dressing room complex. A separate shower area must be provided for each team with a minimum of four shower heads. A separate area must be provided for the exclusive of match officials, which must be capable of accommodating at least four persons. There must be a separate shower for Match Officials and a W/C and wash basin with hot and cold running water in the immediate vicinity. Clubs must provide two covered dugouts adjacent to and on the same side of the playing area. They must be capable of accommodating a minimum of six seated persons, and the floor must be of solid foundation
© Copyright 2026 Paperzz