ACTION 7: COMMUNICATION AND TRAINING Deliverable 7.2 Communication process 30th January 2015 1 Summary During the action 7, “Communication and training” the partners define the “Guidance tool for the EMASbased regulation and better regulatory relief” for the operative application of better regulation and regulatory relief as identified e.g. in the Action Plan of ECAP or in Inter-institutional agreement on better law-making (2003/C321/01). The Guidance (on-line on the project web-site) will be useful both for the actors directly involved inthe project and for external actors, such as other states or regions. This action also provides the implementation of a set of training and communication activities (Communication Plan) aimed at diffusing the knowledge about the existing incentives and training how this incentive could be applied. This action is made up by 3 sub – actions: 7.1 Creation of the “Guidance tool for the EMAS-based regulation and better regulatory relief” (February 2014 - December 2014). 7.2 Communication process (February 2014 – December 2014). 7.3 External Communication (May 2014 – December 2014). Andalusian Institute of Technology is responsible for Action 7. They coordinate all the anticipated activities. 2 Methodology The purpose of this Deliverable (according to the Action 7.2 Communication process) is to introduce the partners the information needed and rules to develop the Communication at regional level. In this regard, each Communication Plan will contain, at least, the following information: Type of incentive available in the region. Tools selected in the region for the communication process and actions planned for their use. Time scheduling for the planned actions. Stakeholders and target – groups considered relevant (e.g. EMAS adopters, not adopters, public employees involved in the application of incentives). Responsibilities and roles involved. At least 5 actions for each Plan will be carried out. These actions could include the following ones: Seminar and meetings. Brochure for specific incentives or target. Article in technical magazines. Workshops. Training initiatives. A very important elements of the communication plan will be certainly training initiatives. In each Region, the BRAVE partners will organize internal training activities for: The 7 Regions and the provinces directly involved in the actions of the project. SMEs operating in the territory involved in the project. Representatives of industrial associations. Organisations related with the local society. EMAS adopters. These training initiatives will focus on technical aspects concerning, for example: The environmental priorities and the corresponding simplifications analysed and adopted during thewhole project. 3 The methodologies for the implementation of the “Guidance tool for the EMAS-based regulation and better regulatory relief” at every considered levels. The key-elements of the “Guidance tool” and ways and operational solutions for an effective implementation. The opportunities introduced by the adopted simplifications. According to the instruction (give above) each partner must compile the table include in the Annex I. 4 Annex I - Communication Plan Pilot Area: Basilicata Communication Action 1 Regulatory reliefs targeted by the Communication Action2 Actions and tools selected for the communication process3 1. Training iniziative: “EMAS nelle scuole della Basilicata” 2. Training initiative: “Controlli e semplificazioni per aziende in AIA” Incentives for school organizations that implements an Environmental Management System . Simplifications of the procedure relating to environmental controls and inspections. - - Reduction of costs of preliminary authorization charges and costs of routine checks for companies with an Integrated Environmental Authorization. E-mail for the promotion. Powerpoint presentation (for the development of the action and the dissemination of the results) E-mail for the promotion. Powerpoint presentation (for the development of the action and the dissemination of the results) Place and time scheduling for the planned actions Potenza October 2014 March 2014 Stakeholders and target – groups considered relevant4 Responsibilities and roles involved Schools and local government Ambiente Italia / Basilicata Region (REDUS network) Regional and local government ARPA Basilicata Companies Trade/industrial associations Basilicata Region / ARPA Basilicata / Ambiente Italia Working progress/ state of progress Completed: We have re-defined the content of the training. The initiative was held the 13/10/14 with support of the regional REDUS network (8 participants) Completed: the training event was held in Potenza the 13/05/2014 (11 participants) 5 Communication Action 1 Regulatory reliefs targeted by the Communication Action2 3. Training initiative: “Le semplificazioni normativa in materia di acquisti verdi di prodotti e servizi in Basilicata” Incentives to certified organizations (ISO 14001, EMAS) or those with Ecolabel products of supplies to the public bodies (Green public procurement). 4. Article All regulatory reliefs proposed and adopted in Basilicata by BRAVE Actions and tools selected for the communication process3 - E-mail for the promotion. Powerpoint presentation (for the development of the action and the dissemination of the results) Article on Basilicata Region and REDUS network newsletter Place and time scheduling for the planned actions October 2014 October 2014 Stakeholders and target – groups considered relevant4 Regional and local governments, especially municipalities. Companies (potential suppliers) All stakeholders Responsibilities and roles involved Ambiente Italia / Basilicata Region Ambiente Italia / Basilicata Region Working progress/ state of progress Completed: We have re-defined the content of the training. The initiative was held the 14/10/14 with the support of the Basilicata Region (10 participants). Completed: On July 2013 article about the project and its activities in Regione Basilicata EPOS Environmental program web site (http://www.eposbasilicata.it). On November 11th 2014 article about GPP training event in Potenza has been published in national GPP web site (http://www.acquistiverdi.it). On December 2014 an article about the results of the project and the Guidance will be published in local press. 6 Communication Action 1 Regulatory reliefs targeted by the Communication Action2 5. Conference All regulatory reliefs adopted in Basilicata and in other regions by BRAVE and presentation of “Guidance tool for the based regulation and regulatory relief”. Actions and tools selected for the communication process3 - E-mail and brochure for the promotion. Powerpoint presentation (for the development of the action and the dissemination of the results) Place and time scheduling for the planned actions November 2014 Stakeholders and target – groups considered relevant4 Responsibilities and roles involved Working progress/ state of progress All stakeholders Ambiente Italia / Basilicata Region Completed: The event was planned for the 23/12/14 in Potenza but there were no attendees. Explanatory note 1. At least 5 actions for each Plan will be carried out. Remember that these actions could include: Seminar and meetings, Brochure for specific incentives or target, Article in technical magazines, Workshops, Training initiatives (at least 3 training initiatives in each region involved). 2. Each communication action can be aimed at disseminating one or more regulatory reliefs adopted or proposed in each region. 3. The following tools could be utilized for the promotion of project and so as to inform about the results of the BRAVE’s project: BRAVE’s website, the press, the e-mail, special materials to target groups, etc. 4. Could be considered as target groups: Representatives of Regional and National Governments, policy makers, national industrial and trade Associations, representatives EMAS Competent Bodies, representatives of national and international Institutions, SMEs, Other interested parties – General Public, etc. 7 Pilot Area: Friuli Venezia Giulia Communication Action 1 Regulatory reliefs targeted by the Communication Action2 Actions and tools selected for the communication process3 1. Training initiative: “GPP e semplificazioni in Friuli Venezia Giulia” Proposal n. 7: Incentives to certified organizations (ISO 14001, EMAS) or those with Ecolabel products of supplies to the public bodies (Green public procurement) 2. Training initiative: “Controlli e semplificazioni per aziende in AIA” Proposal n. 1: Simplifications of the procedure relating to environmental controls and inspections. Proposal n. 2: Reduction of costs of preliminary authorization charges and costs of routine checks for companies with an Integrated Environmental Authorization. - - E-mail for the promotion. Powerpoint presentation (for the development of the action and the dissemination of the results) E-mail for the promotion. Powerpoint presentation (for the development of the action and the dissemination of the results) Place and time scheduling for the planned actions Pordenone May or June 2014 Udine/Palmanova April 2014 Stakeholders and target – groups considered relevant4 Public bodies Companies (potential suppliers) FVG EMAS Club Regional and local government. ARPA FVG Companies (with IEA) Trade/industrial associations Responsibilities and roles involved Ambiente Italia /ASDI Livenza / Regione FVG ARPA FVG / Ambiente Italia Working progress/ state of progress Completed: the training was held the 9th June in Pordenone with the support of ARPA Friuli Venezia Giulia and the Province of Pordenone. 21 participants. Completed: the training was held the 1st July in Palmanova with the support of ARPA Friuli VG. 62 participants. 8 Communication Action 1 Regulatory reliefs targeted by the Communication Action2 3. Training initiative: Presentation of amendments in public sector Proposal n. 6: Introduction in the 2014-2020 plan of specific economic measures applicable to the EU structural funds to cofinance environmental investments. Proposal n. 3: Rewarding conditions and incentives for EMAS registered municipalities relating to their functions in terms of air pollution, noise pollution, light pollution containment and energy saving. 4. Article All regulatory reliefs proposed and adopted in Friuli Venezia Giulia by BRAVE Actions and tools selected for the communication process3 - - E-mail for the promotion. Powerpoint presentation (for the development of the action and the dissemination of the results) Conclusions Article on ARPA FVG and FVG EMAS club’s newsletter Place and time scheduling for the planned actions FVG Region September 2014 FVG Region September 2014 Stakeholders and target – groups considered relevant4 Regional Government. Municipalities. Environmental verifiers. All stakeholders Responsibilities and roles involved Working progress/ state of progress Ambiente Italia / FVG Region Completed: the activity was held the 23rd October in Palmanova with the support of ARPA Friuli VG. 32 participants. Ambiente Italia / ARPA FVG Completed: 12/06/2014: article about GPP in local press. 24/10/2014: article about the support for EMAS public organizations in Regione FVG web site. 11/11/2014 article about approved proposals in Regione FVG web site. On December 10th 2014 article about the results of the project in Regione FVG web site. 9 Communication Action 1 Regulatory reliefs targeted by the Communication Action2 5. Conference All regulatory reliefs adopted in Friuli Venezia Giulia and in other regions by BRAVE and presentation of “Guidance tool for the based regulation and regulatory relief”. Actions and tools selected for the communication process3 - E-mail and brochure for the promotion. Powerpoint presentation (for the development of the action and the dissemination of the results) Place and time scheduling for the planned actions Pordenone November 2014 Stakeholders and target – groups considered relevant4 All stakeholders Responsibilities and roles involved Working progress/ state of progress Ambiente Italia / FVG Region / ARPA FVG Completed: the activity was held on December 10th in Trieste. 24 participants. Explanatory note 1. At least 5 actions for each Plan will be carried out. Remember that these actions could include: Seminar and meetings, Brochure for specific incentives or target, Article in technical magazines, Workshops, Training initiatives (at least 3 training initiatives in each region involved). 2. Each communication action can be aimed at disseminating one or more regulatory reliefs adopted or proposed in each region. 3. The following tools could be utilized for the promotion of project and so as to inform about the results of the BRAVE’s project: BRAVE’s website, the press, the e-mail, special materials to target groups, etc. 4. Could be considered as target groups: Representatives of Regional and National Governments, policy makers, national industrial and trade Associations, representatives EMAS Competent Bodies, representatives of national and international Institutions, SMEs, Other interested parties – General Public, etc. 10 Pilot Area: Liguria Communication Action 1 1. Seminar 2. Seminar 3. Seminar Regulatory reliefs targeted by the Communication Action2 Final conference on contents of Brave project, all regulatory reliefs and presentation of “Guidance tool for the based regulation and regulatory relief”. Final conference on contents of Brave project, all regulatory reliefs and presentation of “Guidance tool for the based regulation and regulatory relief”. Final conference on contents of Brave project, all regulatory reliefs and presentation of “Guidance tool for the based regulation and regulatory relief”. Actions and tools selected for the communication process3 For the schedule of the communication action: -Agenda sent by e-mail to the participants -Presentation of the Guidance tool BRAVE and for ISO 14001 (slide) For the schedule of the communication action: -Agenda sent by e-mail to the participants -Presentation of the Guidance tool BRAVE and for ISO 14001 (slide) For the schedule of the communication action: -Agenda sent by e-mail to the participants -Presentation of the Guidance tool BRAVE and for ISO 14001(slide) Place and time scheduling for the planned actions Genova, 03/12/14 La Spezia, 9/12/14 Genova, 10 /12/14 Stakeholders and target – groups considered relevant4 Responsibilities and roles involved Companies of Plastic Section of Confindustria Genova Confindustria Genova e Liguria Companies involved in IPPC law, officiers and technical adviser for industrial association Confindustria Genova e Liguria Completed 9 participants Confindustria Genova e Liguria Completed 18 participants Companies of Environmental Club of Confindustria Genova. Local institutions : officiers of Liguria Region and ARPA Liguria. Working progress/ state of progress Completed 4 participants 11 Communication Action 1 4. Seminar 5. Training activities 6. Training activities Regulatory reliefs targeted by the Communication Action2 Final conference on contents of Brave project, all regulatory reliefs and presentation of “Guidance tool for the based regulation and regulatory relief”. Implementation, about the new procedure of reduce inspection (l.r. n. 50/12 + DGR 454/14) and about the introduction of specific economic measures to cofinance environmental investments Implementation, about the new procedure of reduce inspection (l.r. n. 50/12 + DGR 454/14) and about the introduction of specific economic measures to cofinance environmental investments Actions and tools selected for the communication process3 For the schedule of the communication action: -Agenda sent by e-mail to the participants -Presentation of the Guidance tool BRAVE and for ISO 14001(slide) Place and time scheduling for the planned actions Savona, 18 /12/14 For the schedule of the communication action: -Agenda sent by e-mail to the participants Genova, 03/12/14 -Presentation of adopted proposals in Liguria Region (slide) - open discussion about the new procedure For the schedule of the communication action: -Agenda sent by e-mail to the participants -Presentation of adopted proposals in Liguria Region (slide) - open discussion about the new procedure La Spezia, 9/12/14 Stakeholders and target – groups considered relevant4 Responsibilities and roles involved Working progress/ state of progress Companies of Industrial Association Savona Confindustria Genova e Liguria Completed 12 participants Companies of Plastic Section of Confindustria Genova Confindustria Genova e Liguria Companies involved in IPPC law, officiers and technical adviser for industrial association Confindustria Genova e Liguria Completed 4 participants involved Completed 9 participants involved 12 Communication Action 1 7. Training activities 8. Training activities 9. Article Regulatory reliefs targeted by the Communication Action2 Implementation, about the new procedure of reduce inspection (l.r. n. 50/12 + DGR 454/14) and about the introduction of specific economic measures to cofinance environmental investments Implementation, about the new procedure of reduce inspection (l.r. n. 50/12 + DGR 454/14) and about the introduction of specific economic measures to cofinance environmental investments All regulatory reliefs proposed and adopted by BRAVE Actions and tools selected for the communication process3 Place and time scheduling for the planned actions For the schedule of the communication action: -Agenda sent by e-mail to the participants -Presentation of adopted proposals in Liguria Region (slide) - open discussion about the new procedure For the schedule of the communication action: -Agenda sent by e-mail to the participants -Presentation of adopted proposals in Liguria Region (slide) - open discussion about the new procedure Article on Informa (technical electronical magazine of Confindustria Genova) Genova, 10 /12/14 Savona, 18 /12/14 November2014 Stakeholders and target – groups considered relevant4 Responsibilities and roles involved Working progress/ state of progress Confindustria Genova e Liguria Completed 18 participants involved Companies of Industrial Association Savona Confindustria Genova e Liguria Completed 12 participants involved All stakeholders Confindustria Genova e Liguria Done On 14th November Email to all companies of Confindustria Genova Companies of Environmental Club of Confindustria Genova. Local institutions : officiers of Liguria Region and ARPA Liguria. 13 Communication Action 1 Regulatory reliefs targeted by the Communication Action2 Actions and tools selected for the communication process3 Place and time scheduling for the planned actions Stakeholders and target – groups considered relevant4 Responsibilities and roles involved Working progress/ state of progress Explanatory note 1. At least 5 actions for each Plan will be carried out. Remember that these actions could include: Seminar and meetings, Brochure for specific incentives or target, Article in technical magazines, Workshops, Training initiatives (at least 3 training initiatives in each region involved). 2. Each communication action can be aimed at disseminating one or more regulatory reliefs adopted or proposed in each region. 3. The following tools could be utilized for the promotion of project and so as to inform about the results of the BRAVE’s project: BRAVE’s website, the press, the e-mail, special materials to target groups, etc. 4. Could be considered as target groups: Representatives of Regional and National Governments, policy makers, national industrial and trade Associations, representatives EMAS Competent Bodies, representatives of national and international Institutions, SMEs, Other interested parties – General Public, etc. 14 Pilot Area: Lombardy Communication Action 1 1. Training initiative: Ecogestione - Modelli 231 e reati ambientali: integrazione tra SGA e 231 2. Article in technical magazine: EMAS in Europa tra benefici, barriere e semplificazioni 3. Training Initiative: Lesson on BRAVE project 4. Workshop/ Training activity: Regulatory Relief role towards EMS adoption in view of EMAS and ISO14001 revision process 5. Seminar “Ecolabel dei prodotti di carta trasformata, le opportunità della certificazione” 6. Seminar Ecopaperloop: “Ecolabel dei prodotti di carta e GPP: sviluppi in corso e progetto LIFE+ BRAVE” Regulatory reliefs targeted by the Communication Action2 Actions and tools selected for the communication process3 Place and time scheduling for the planned actions Stakeholders and target – groups considered relevant4 Responsibilities and roles involved Working progress/ state of progress Proposal no. 6 Website; powerpoint Assolombarda, Milan, March 4th, 2014 EMAS registered and ISO14001 certified organizations. IEFE Bocconi: teaching Done Online and printed article Magazine: Energie & Ambiente oggi (March 2014). Webinar; powerpoint Master MAGER, Bocconi University, Milan, planned in June, 2014 Students, alumni, other experts. IEFE Bocconi: teaching Done, June 2014 Website; powerpoint Assolombarda, Milan, May 23rd, 2014 EMAS registered and ISO14001 certified organizations, other experts. IEFE Bocconi: teaching Done, 23rd May 2014 Power Point Politecnico of Milan organized by Comieco, 16th September 2014 COMIECO SMEs, potential EMAS registered organizations, SMEs with Ecolabel certification ARPA Lombardia Done, 16th September 2014 Power Point Palazzo Di Regione di Lombardia, Milan 7th October 2014 COMIECO SMEs, EMAS registered and ISO14001 certified organizations, other experts ARPA Lombardia On time, 7th October 2014 BRAVE project – European survey BRAVE project – EMAS and regulatory reliefs; Lombard proposals. BRAVE project – EMAS and regulatory reliefs; Lombard proposals. BRAVE project – EMAS and regulatory reliefs: Achieved results. BRAVE project – EMAS and regulatory reliefs: Achieved results. / IEFE Bocconi. Done 15 Communication Action 1 Regulatory reliefs targeted by the Communication Action2 7. Article in technical magazine: EMAS e certificazioni ambientali, semplificazione normativa e agevolazioni per le imprese 8. Seminar in Ecomondo “PROGETTO LIFE+ BRAVE, SEMPLIFICAZIONI PER LE CERTIFICAZIONI AMBIENTALI” BRAVE project – EMAS and regulatory reliefs: Achieved results. 9. Training activity in Ecomondo “PROGETTO LIFE+ BRAVE, SEMPLIFICAZIONI PER LE CERTIFICAZIONI AMBIENTALI” 10. Seminar in Ecomondo “PROGETTO LIFE+ BRAVE, SEMPLIFICAZIONI PER LE CERTIFICAZIONI AMBIENTALI” BRAVE project – EMAS and regulatory reliefs: Achieved results. 11. Article in technical magazine: to be defined BRAVE project – EMAS and regulatory reliefs: Achieved results. Actions and tools selected for the communication process3 Place and time scheduling for the planned actions Online and printed article Magazine on line: Ingegneria Dell’Ambiente (Nov 2014) Power Point Ecomondo fair, Rimini, 6th November Power Point Milan, Assolombarda 16th December 2014 Power Point Mantova, Promoimpresa 3rd December 2014 On line and printed article Magazine: Regioni e Ambiente (Dec 14 – to be confirmed) BRAVE project – EMAS and regulatory reliefs: Achieved results. BRAVE project – EMAS and regulatory reliefs: Achieved results. Stakeholders and target – groups considered relevant4 Responsibilities and roles involved Working progress/ state of progress / ARPA Lombardia On time, 21st November 2014 publication Fair Visitors (experts) ARPA Lombardia Done, 6th November EMAS registered and ISO14001 certified organizations, other experts ARPA Lombardia 16th December 2014 EMAS registered and ISO14001 certified organizations, other experts ARPA Lombardia Done, 3rd December ARPA Lombardia 19th December, Publication on the website www.regionieambiente .it / 16 Communication Action 1 Regulatory reliefs targeted by the Communication Action2 Actions and tools selected for the communication process3 Place and time scheduling for the planned actions Stakeholders and target – groups considered relevant4 Responsibilities and roles involved Working progress/ state of progress Explanatory note 1. At least 5 actions for each Plan will be carried out. Remember that these actions could include: Seminar and meetings, Brochure for specific incentives or target, Article in technical magazines, Workshops, Training initiatives (at least 3 training initiatives in each region involved). 2. Each communication action can be aimed at disseminating one or more regulatory reliefs adopted or proposed in each region. 3. The following tools could be utilized for the promotion of project and so as to inform about the results of the BRAVE’s project: BRAVE’s website, the press, the e-mail, special materials to target groups, etc. 4. Could be considered as target groups: Representatives of Regional and National Governments, policy makers, national industrial and trade Associations, representatives EMAS Competent Bodies, representatives of national and international Institutions, SMEs, Other interested parties – General Public, etc. 17 Pilot Area: Tuscany Communication Action 1 1. Brochure 2. In site training initiative 3. In site training initiative Regulatory reliefs targeted by the Communication Action2 All regulatory reliefs adopted (BRAVE proposals and others) All regulatory reliefs adopted by Tuscany All regulatory reliefs adopted by Tuscany Actions and tools selected for the communication process3 Place and time scheduling for the planned actions Brochure with all regulatory reliefs adopted in Italy and Tuscany Brochure to send to: Trade organizations Companies Institutions EMS assessment and introduction of regulatory reliefs adopted in Tuscany by BRAVE EMS assessment and introduction of regulatory reliefs adopted in Tuscany by BRAVE May 2014 Stakeholders and target – groups considered relevant4 Companies, trade organization, Chamber of commerce Responsibilities and roles involved Working progress/ state of progress SSSUP Completed disseminate in the training initiatives and during the seminar with Fiscal business consultants Regional institutions Local institutions 26 May 2014 SSSUP Completed (involved 2 employees operating in the environmental topic) SSSUP Completed (involved 2 employees operating in the environmental topic Company (Mondialcarta) 28 May 2014 Company (Eurocarta) 18 Communication Action 1 Regulatory reliefs targeted by the Communication Action2 Actions and tools selected for the communication process3 Place and time scheduling for the planned actions Stakeholders and target – groups considered relevant4 Responsibilities and roles involved Training activity for fiscal business consultants to promote the regulatory reliefs and EMAS. 4. Training initiative 5. Training initiative IRAP reduction and other fiscal incentives for EMAS companies Proposal n. 1 All regulatory reliefs for ISO14001 All proposals For the schedule of the communication action: -Agenda sent by e-mail to the participants Documents disseminated: -Presentation of regulatory relies and on EMAS - Brochure BRAVE in Tuscany For the schedule of the communication action: -Agenda sent by e-mail to the participants For the development of the communication action: -Presentation of regulatory relies - Guidance tool BRAVE - Guidance tool for ISO 14001 Working progress/ state of progress Completed 6 consults attended 29 May 2014 Fiscal business consultants SSSUP Completed. 18 participants involved. December 16,2014 Companies SSSUP 19 Communication Action 1 6. Training initiative Regulatory reliefs targeted by the Communication Action2 Homogenization of IPPC checks among Tuscany provinces Actions and tools selected for the communication process3 Place and time scheduling for the planned actions March 18, 2014 Training on the method tested with action 5. Presentation of new regulatory reliefs adopted in Tuscany 7. Article All regulatory reliefs adopted by BRAVE 8. News (Brave web site) IRAP reduction and other fiscal incentives for EMAS companies Article on ARPAT news Responsibilities and roles involved Working progress/ state of progress 5 ARPAT staff members Minute realized The regional department of ARPAT organizes a meeting with ARPAT department of Pisa (province). Article on regional/national journal operating in environmental topic Stakeholders and target – groups considered relevant4 Staff of ARPAT Pisa department and SSSUP SSSUP November 2014 All stakeholders SSSUP May 2014 All stakeholders SSSUP Published in November on ARPAT news Completed Explanatory note 1. At least 5 actions for each Plan will be carried out. Remember that these actions could include: Seminar and meetings, Brochure for specific incentives or target, Article in technical magazines, Workshops, Training initiatives (at least 3 training initiatives in each region involved). 2. Each communication action can be aimed at disseminating one or more regulatory reliefs adopted or proposed in each region. 3. The following tools could be utilized for the promotion of project and so as to inform about the results of the BRAVE’s project: BRAVE’s website, the press, the e-mail, special materials to target groups, etc. 4. Could be considered as target groups: Representatives of Regional and National Governments, policy makers, national industrial and trade Associations, representatives EMAS Competent Bodies, representatives of national and international Institutions, SMEs, Other interested parties – General Public, etc. 20 Pilot Area: Valencia Communication Action 1 1. Information in web page of Cámara de Comercio 2. Training initiative “BRAVE RESULTS and INCENTIVES FOR GREENING SME” Regulatory reliefs targeted by the Communication Action2 All regulatory reliefs adopted (BRAVE proposals tested and adopted) All proposals Actions and tools selected for the communication process3 Place and time scheduling for the planned actions Stakeholders and target – groups considered relevant4 December 2014 Companies, trade organization Regional Authorities Local Authorities Microsite with all regulatory reliefs adopted in Spain (National and Regional Level) Access of : Trade organizations Firms Institutions Local and Regional Authorities For the schedule of the communication action: Promote the event by e-mail to the potential participants. For the development of the communication action: presentation to the participants in Chamber of Commerce training classroom For the dissemination of the results of the communication action: slides of presentations and other documentation Valencia, December 2014, 17th Enterprises and public bodies interested in innovation and environment Responsibilities and roles involved Chamber of Commerce of Valencia Chamber of Commerce. General presentations and coordination. Regional environmental staff working Administration point of vue Working progress/ state of progress http://www.cam aravalencia.com/ esES/proyectos/eur opeos/medioambiente/Pagina s/brave.aspx Done. 21 Communication Action 1 3. Training initiative “Benefits in the implementation of an environmental management system. The European model EMAS III” 4. Seminar “Tools for supporting the implementation of systems of quality and the environment management. El tutor.es “ Regulatory reliefs targeted by the Communication Action2 Actions and tools selected for the communication process3 Place and time scheduling for the planned actions Stakeholders and target – groups considered relevant4 Responsibilities and roles involved Working progress/ state of progress Valencia, May2014 Enterprises and public bodies interested in innovation and environment Chamber of Commerce. General presentations and coordination. Regional environmental staff working in the field of packaging waste. Administration point of vue Done. The seminar was held at the headquarters of the Chamber of Commerce last day May 14, 2014. April-May 2014 Companies with EMAS registration or ISO 14001 certified or in the process of obtaining Chamber of Commerce. General presentations and coordination. Certification body Technology provider Done. 8 July 2014. For the schedule of the communication action: Promote the event by e-mail to the potential participants. All regulatory reliefs for EMAS All proposals Presentation of Guide For the development of the communication action: presentation to the participants in Chamber of Commerce training classroom For the dissemination of the results of the communication action: slides of presentations and other documentation For the schedule of the communication action: Promote the event by e-mail to the potential participants. All regulatory reliefs for EMAS All proposals For the development of the communication action: presentation to the participants in Chamber of Commerce training classroom For the dissemination of the results of the communication action: slides of presentations and other documentation 22 Communication Action 1 5. Press note 6. Article in Specialized Press 7. Seminar: Results from BRAVE project 8. Training initiative: Results from BRAVE project Explanatory note 1. 2. 3. 4. Regulatory reliefs targeted by the Communication Action2 All regulatory reliefs proposed and adopted in Valencia by BRAVE All regulatory reliefs adopted by BRAVE. BRAVE project – EMAS and regulatory reliefs; BRAVE project – EMAS and regulatory reliefs; Actions and tools selected for the communication process3 Creation of press note and distribution by Press Office of the Chamber of Commerce Place and time scheduling for the planned actions Valencia Region May 2014 Stakeholders and target – groups considered relevant4 All stakeholders Responsibilities and roles involved Chamber of Commerce Information about the BRAVE project Sent and pending publication All stakeholders Chamber of Commerce And AIMME Conference in Master Class related to Environmental Management Systems Interuniversity Master in environmental engineering. UV and UPV. 16.5.2014 University Master in Quality, Environmental and Occupational Risk Prevention. 8.5.2014 Students, alumni, other experts. Chamber of Commerce UCV-AIMME UV (www.uv.es) Conference in CONAMA National Environment Conference in Madrid from 24 to 27 November Students and experts. Chamber of Commerce IAT Working progress/ state of progress Press note finished 18.12.2014. Publication in regional journal “Las provincias” 8.1.2015. Pending publication Done. Concluded both activities. Done. 26.11.2014 At least 5 actions for each Plan will be carried out. Remember that these actions could include: Seminar and meetings, Brochure for specific incentives or target, Article in technical magazines, Workshops, Training initiatives (at least 3 training initiatives in each region involved). Each communication action can be aimed at disseminating one or more regulatory reliefs adopted or proposed in each region. The following tools could be utilized for the promotion of project and so as to inform about the results of the BRAVE’s project: BRAVE’s website, the press, the e-mail, special materials to target groups, etc. Could be considered as target groups: Representatives of Regional and National Governments, policy makers, national industrial and trade Associations, representatives EMAS Competent Bodies, representatives of national and international Institutions, SMEs, Other interested parties – General Public, etc. 23 Pilot Area: Andalusia Communication Action 1 Regulatory reliefs targeted by the Communication Action2 Actions and tools selected for the communication process3 Place and time scheduling for the planned actions Stakeholders and target – groups considered relevant4 Responsibilities and roles involved Working progress/ state of progress IAT Completed: December 2015.- We have worked on the development and progress of the work document that contained the information necessary for the Regional Government on Environment includes the simplification measures in the imminent Regulatory on Development and Execution on 2015. For the schedule of the communication action: - Agenda sent by e-mail to the participants. 1. Meeting: Presentation of amendments Proposal n. 2: Reduce the frequency of self monitoring, inspection and reporting´s activities in EMAS registered organizations. Proposal n. 5: Establish a simplified permitting procedure (revision and update) for the IPPC permits in EMAS registered organizations. For the development of the communication action: - Presentation to the participants. - Open discussion about the proposal of amendments. - Conclusions. For the dissemination of the results of the communication action: - Minutes of meeting (diffusion internally) Sevilla March 2014 Representatives of Regional Government for Environment. 24 Communication Action 1 Regulatory reliefs targeted by the Communication Action2 Actions and tools selected for the communication process3 Place and time scheduling for the planned actions Stakeholders and target – groups considered relevant4 Responsibilities and roles involved Working progress/ state of progress IAT Completed: The develop of the guidance was delayed and the training activity was held 18th December. For the schedule of the communication action: - Agenda sent by e-mail to the participants. 2. Training activity: Presentation of Guidance tool for the EMAS. Guidance tool for the EMAS – based regulation and better regulatory relief. For the development of the communication action: - Presentation of Guidance tool for the EMAS to the participants. - Open discussion about Guidande tool for EMAS. - Conclusions and closing. Sevilla May 2014 Representatives of Regional Government for Environment. 25 Communication Action 1 Regulatory reliefs targeted by the Communication Action2 Proposal n. 2: Reduce the frequency of self monitoring, inspection and reporting´s activities in EMAS registered organizations. 3. Training activity: Business sostenibility roundtable. Proposal n. 5: Establish a simplified permitting procedure (revision and update) for the IPPC permits in EMAS registered organizations. Guidance tool for the EMAS – based regulation and better regulatory relief. Actions and tools selected for the communication process3 Place and time scheduling for the planned actions Stakeholders and target – groups considered relevant4 Sevilla May 2014 Regional Government for Environment. Representatives of other Regional Governments. Representatives EMAS competent bodies of Spain. Representatives of Ministry of Environment of Spain. Environmental verifiers. EMAS registered organizations. Responsibilities and roles involved Working progress/ state of progress IAT Completed: Ecoedition Congress was held 22nd and 23th May. For the schedule of the communication action: - Agenda sent by e-mail to the participants. For the development of the communication action: - Presentation of obtained results of the BRAVE project to the participants. - Question time for clarifications and suggestions. - Conclusions and closing. For the dissemination of the results of the communication action: - Press release 26 Communication Action 1 Regulatory reliefs targeted by the Communication Action2 Actions and tools selected for the communication process3 Place and time scheduling for the planned actions Stakeholders and target – groups considered relevant4 Responsibilities and roles involved Working progress/ state of progress IAT Completed: CONAMA (National Environmental Congress) was held 24th-27th November 2014. The training activity is titled: EMAS “More value in times of crisis” and it was held 26th November. For the schedule of the communication action: - Agenda sent by e-mail to the participants. 4. Training activity: CONAMA Presentation of Guidance tool for the EMAS. Guidance tool for the EMAS – based regulation and better regulatory relief. For the development of the communication action: - Presentation of Guidance tool for the EMAS to attendees. - Question time for clarifications and suggestions. - Conclusions and closing. Madrid November 2014 Representatives of other Regional Governments. Representatives EMAS competent bodies of Spain. Environmental verifiers. EMAS registered organizations. 27 Communication Action 1 5. Article presented in CONAMA 2014. (National Environmental Congress) Regulatory reliefs targeted by the Communication Action2 Proposal n. 2: Reduce the frequency of self monitoring, inspection and reporting´s activities in EMAS registered organizations Proposal n. 5: Establish a simplified permitting procedure (revision and update) for the IPPC permits in EMAS registered organizations. Guidance tool for the EMAS – based regulation and better regulatory relief. Actions and tools selected for the communication process3 Place and time scheduling for the planned actions Stakeholders and target – groups considered relevant4 Madrid September 2014 Attendees to the CONAMA: 10,000 attendees in the last edition. Responsibilities and roles involved Working progress/ state of progress IAT Completed: The article was presented to CONAMA 11st November 2014. For the schedule of the communication action: - Development of the abstract of the article. For the development of the communication action: - Development of the full paper. For the dissemination of the results of the communication action: - Publication on the CONAMA Congress website. 28 Communication Action 1 Regulatory reliefs targeted by the Communication Action2 Actions and tools selected for the communication process3 Place and time scheduling for the planned actions Stakeholders and target – groups considered relevant4 Responsibilities and roles involved Working progress/ state of progress IAT Completed: IAT published 26th November a new in IAT Newsletter regarding the training initiative hold in CONAMA For the schedule of the communication action: - Development of the abstract of the article. 6. Article presented in IAT Newsletter. Regarding the training initiative hold in CONAMA and presentation of project results and Guidance tool for the EMAS – based regulation and better regulatory relief. For the development of the communication action: - Development of the full paper. Sevilla December 2014 Database from IAT, including public and private organizations For the dissemination of the results of the communication action: - Publication on the IAT Newsletter Explanatory note 1. At least 5 actions for each Plan will be carried out. Remember that these actions could include: Seminar and meetings, Brochure for specific incentives or target, Article in technical magazines, Workshops, Training initiatives (at least 3 training initiatives in each region involved). 2. Each communication action can be aimed at disseminating one or more regulatory reliefs adopted or proposed in each region. 3. The following tools could be utilized for the promotion of project and so as to inform about the results of the BRAVE’s project: BRAVE’s website, the press, the e-mail, special materials to target groups, etc. 4. Could be considered as target groups: Representatives of Regional and National Governments, policy makers, national industrial and trade Associations, representatives EMAS Competent Bodies, representatives of national and international Institutions, SMEs, Other interested parties – General Public, etc. 29
© Copyright 2026 Paperzz