OAS UPDATE For the College Senate COLLEGE CAMP OAS purchased two parcels of land that connect the campus property to OAS’s College Camp The trails leading from campus to College Camp are open and being fully utilized A new handicapped accessible ramp was built at the entrance to the lodge this summer An additional fire pit was constructed We continue to operate according to our Forest Stewardship Plan THE RED DRAGON OUTFITTERS IN WELL UNDER CONSTRUCTION Building will be handed over to OAS in late spring Grand Opening in August 2016 Will contain: Red Dragon Outfitters ID/Dining Card Office Damascene OAS Book Cellar Offices Sodexo Offices GREEN BUILD ELEMENTS The green roof – a component of the storm water mitigation system, which also includes a bio-retention swale north of the building and porous paving in the parking area. More efficient HVAC systems All LED lighting Low-flow toilet fixtures A sundial Meeting Silver LEED standards SAVING OUR RESOURCES This summer OAS installed new dish machines in Wilsbach and Morris Halls Wilsbach Hall: saves 525,456 gallons of water each year Morris hall: saves 274,400 gallons of water each year STARBUCKS WAS REFRESHED New art New display counter Fresh coat of paint Chair railings to protect the walls argo tea café: a new retail venue in Milne Library timeline • • • • • Jazzman’s closes at end of Spring 2017 semester Work begins after graduation on 1st floor of Milne OAS takes possession of “the box” by 9/15/17 argo tea is built inside “the box” Grand Opening of argo tea anticipated for January 2018 SODEXO SUMMER GLOBAL INTERNSHIPS 2 SUNY ONEONTA STUDENTS INTERNED AT SODEXO’S WORLD HEADQUARTERS IN PARIS 2 SUNY ONEONTA STUDENTS INTERNED AT SODEXO’S HEADQUARTERS IN SINGAPORE
© Copyright 2026 Paperzz