L35‐I‐12‐04‐27‐80‐MULT‐120 L35‐I‐48‐04‐27‐80‐MULT‐120 L35‐I‐12‐04‐30‐80‐MULT‐120 L35‐I‐48‐04‐30‐80‐MULT‐120 L35‐I‐12‐04‐35‐80‐MULT‐120 L35‐I‐48‐04‐35‐80‐MULT‐120 L35‐I‐12‐08‐30‐80‐MULT‐120 L35‐I‐48‐08‐30‐80‐MULT‐120 With over 24,000 product configurations Build On Demand TROV meets every designers needs for indirect architectural lighting 148 hours equates to two business working days and for Most Popular TROV® orders less than 200 units. 22 weeks equates to two calendar weeks and for Build On Demand TROV® orders less than 400 units. 3Products will be deemed late if the manufacturing lead time for an order exceeds 3 business days. 4This incentive promotion is valid from now till 4/22/16. The incentive promotion is only applicable to orders for the TROV® product line which are accepted by EcoSense and excludes orders for any accessories or special services. The incentive promotion shall not apply in the event that an order requires a qualifying TROV® product to be shipped simultaneously with an accessory. The maximum incentive value shall not exceed $60,000. The incentive promotion shall not apply to changes in manufacturing lead time that arise as a result of a force majeure event or other situations outside of our control, such as weather, natural disasters, fire, government action and supplier issues. EcoSense reserves the right to reject any order in its sole and absolute direction. Order size is determined by the total number of units per order, not SKU. All orders placed during a 7 calendar day period that ship to the same address will be included in calculating the order size. Lead time begins when order is accepted by EcoSense and communicated to customer, and ends when the product leaves the factory. Manufacturing lead time does not include delivery time, freight handling or customs. Delivery will vary based upon the customer’s location and selected shipping method. Orders will ship GROUND unless another method is selected. Order guarantee is based on longest lead item. It is highly recommended to notify EcoSense of any opportunities larger than 500 units in advance to ensure availability of materials and capacity Most Popular TROV SKUs BTO – Build to Order Manufacturing Time • 48 Hours / 2 Business Days = 1‐199 units All TROV SKUs outside of CTO Manufacturing Time By Order Size • 10 Business Days = 1‐399 units • 15 Business Days = 400‐499 units • 20 Business Days = 500‐999 units* • 25 Business Days = 1000‐1999 units* • 30‐40 Business Days = 2k+ units* Most Popular TROV SKUs L35‐I‐12‐04‐27‐80‐MULT‐120 L35‐I‐48‐04‐27‐80‐MULT‐120 L35‐I‐12‐04‐30‐80‐MULT‐120 L35‐I‐48‐04‐30‐80‐MULT‐120 L35‐I‐12‐04‐35‐80‐MULT‐120 L35‐I‐48‐04‐35‐80‐MULT‐120 L35‐I‐12‐08‐30‐80‐MULT‐120 L35‐I‐48‐08‐30‐80‐MULT‐120 Most Popular TROV SKUs In RED – All other configurations (24,000) = BTO Built to Order MODEL / SIZE INTERIOR/ EXTERIOR LENGTH POWER Watts/LF CCT CRI VOLTAGE OPTICS MULT (110‐277VAC) Grazing Washing 9x29 9x59 25x25 25x33 40x48 40x60 40x90 L35 I 12” 02 WHITE CCT MONO COLOR 80+ L50 E 48” 04 06 22 27 RD GR 90+ 08* 30 BL 15x15 25x45 10 35 AM 15x23 25x75 45x15 12 40 50 15x35 15x65 39x9 55x25 40x40 70x40 70x70 *8 WATT ONLY * It is highly recommended to notify EcoSense of any opportunities larger than 500 units in advance to ensure availability of materials and capacity. AVAILABLE IN 3000K COVE 120 ASYM *It is highly recommended to notify EcoSense of any opportunities larger than 500 units in advance to ensure availability of materials and capacity. LINE OF LIGHT LOL Delivery Estimates Shipping Estimates Most Popular BTO Time To Manufacture 24 Hrs. 2 Weeks Orders 1‐199 units Orders 1‐399 units Customs Clearance 1‐2 Days FedEx Ground Shipping 1‐5 Days for Continental United States* ● Most Popular TROV SKUs Delivered to New England CTO – Configure to Order(High Volume TROV SKUs) 1‐199 Units ≈ 1 Week Delivered* *FedEx Shipping Calculator http://www.fedex.com/grd/maps/ShowMapEntry.do Shipping from El Paso, TX ZIP 79936 • • • 1 Business Day to Manufacture 1‐2 Business Days Customs Clearance 4 Business Days Ground Shipping Expedited shipping available for an additional fee ● Built To Order Delivered to New England BTO – Built to Order (All TROV SKUs outside of CTO) 1‐399 Units ≈ 3 Weeks Delivered* • • • 10 Business Day to Manufacture 1‐2 Business Days Customs Clearance 4 Business Days Ground Shipping Expedited shipping available for an additional fee *See disclaimer for complete terms EcoSense Lighting Website and Landing Page ecosenselighting.com trovondemand.com EcoSense Order Confirmation with Expected Ship Date Disclaimer 148 hours equates to two business working days and for Most Popular TROV® orders less than 200 units. 22 weeks equates to two calendar weeks and for Build On Demand TROV® orders less than 400 units. 3Products will be deemed late if the manufacturing lead time for an order exceeds 3 business days. 4This incentive promotion is valid from now till 4/22/16. The incentive promotion is only applicable to orders for the TROV® product line which are accepted by EcoSense and excludes orders for any accessories or special services. The incentive promotion shall not apply in the event that an order requires a qualifying TROV® product to be shipped simultaneously with an accessory. The maximum incentive value shall not exceed $60,000. The incentive promotion shall not apply to changes in manufacturing lead time that arise as a result of a force majeure event or other situations outside of our control, such as weather, natural disasters, fire, government action and supplier issues. EcoSense reserves the right to reject any order in its sole and absolute direction. Order size is determined by the total number of units per order, not SKU. All orders placed during a 7 calendar day period that ship to the same address will be included in calculating the order size. Lead time begins when order is accepted by EcoSense and communicated to customer, and ends when the product leaves the factory. Manufacturing lead time does not include delivery time, freight handling or customs. Delivery will vary based upon the customer’s location and selected shipping method. Orders will ship GROUND unless another method is selected. Order guarantee is based on longest lead item. It is highly recommended to notify EcoSense of any opportunities larger than 500 units in advance to ensure availability of materials and capacity. TROV Cross from Other Manufactures TROV On Demand* Philips Color Kinetics EcoSense TROV eW Cove EC Powercore L35‐I‐Length‐02‐CCT‐80‐MULT‐120 2 Weeks eW Cove QLX Powercore Medium Beam L50‐I‐Length‐06‐CCT‐80‐MULT‐40x90 2 Weeks eW Cove QLX Powercore Wide Beam 2700K, 3000K, 3500K L35‐I‐Length‐04‐CCT ‐80‐MULT‐120 2700K, 3000K, 3500K 48 Hours eW Cove QLX Powercore Wide Beam 4000K L35‐I‐Length‐04‐40‐80‐MULT‐120 2 Weeks eW Cove MX Powercore Medium Beam L50‐I‐Length‐10‐CCT‐80‐MULT‐40x90 eW Cove MX Powercore Wide Beam 3000K CCT L35‐I‐Length‐08‐30 ‐80‐MULT‐120 TROV On Demand* Lumen Pulse EcoSense TROV Lumencove 2.0 RO 2700K, 3000K, 3500K L35‐I‐Length‐04‐CCT‐80‐MULT‐12 2700K, 3000K, 3500K 48 Hours Lumencove 2.0 RO (40K) L35‐I‐Length‐04‐CCT (40K) ‐80‐MULT‐120 2 Weeks Lumenfacade Interior 5W/LF L50‐I‐Length‐04‐CCT‐80‐MULT‐BEAM 2 Weeks Lumenfacade Interior 8.5W/LF L50‐I‐Length‐08‐CCT‐80‐MULT‐BEAM 2 Weeks Lumenfacade Interior 15.25W/LF L50‐I‐Length‐12‐CCT‐80‐MULT‐BEAM 2 Weeks 2 Weeks Lumenfacade Exterior 5W/LF L50‐E‐Length‐04‐CCT‐80‐MULT‐BEAM 2 Weeks 48 Hours Lumenfacade Exterior 8.5W/LF L50‐E‐Length‐08‐CCT‐80‐MULT‐BEAM 2 Weeks Lumenfacade Exterior 15.25W/LF L50‐E‐Length‐12‐CCT‐80‐MULT‐BEAM 2 Weeks Lumenfacade HORIZONTAL 5W L50‐E‐Length‐04‐CCT‐80‐MULT‐BEAM 2 Weeks Lumenfacade HORIZONTAL RO L50‐E‐Length‐08‐CCT‐80‐MULT‐BEAM 2 Weeks Lumenfacade HORIZONTAL HO L50‐E‐Length‐12‐CCT‐80‐MULT‐BEAM 2 Weeks Lumenfacade Remote 5W L50‐E‐Length‐04‐CCT‐80‐MULT‐BEAM 2 Weeks Lumenfacade Remote RO L50‐E‐Length‐08‐CCT‐80‐MULT‐BEAM 2 Weeks Lumenfacade Remote HO L50‐E‐Length‐12‐CCT‐80‐MULT‐BEAM 2 Weeks Lumencove XT Exterior RO L50‐E‐Length‐04‐CCT‐80‐MULT‐120 2 Weeks Lumencove XT Exterior HO L50‐E‐Length‐12‐CCT‐80‐MULT‐120 2 Weeks Lumencove XT Direct View L50‐E‐Length‐04‐CCT‐80‐MULT‐LOL 2 Weeks Lumencove 2.0 HO L35‐I‐Length‐12‐CCT‐80‐MULT‐120 2 Weeks eW Cove MX Powercore Wide Beam L35‐I‐Length‐08‐CCT‐80‐MULT‐120 2700K, 3500K, 4000K 2 Weeks eW Fuse Powercore 10°x60° L50‐I‐Length‐10‐CCT‐80‐MULT‐9x59 2 Weeks eW Fuse Powercore 30°x60° L50‐I‐Length‐10‐CCT‐80‐MULT‐40x60 2 Weeks eW Graze EC Powercore L50‐E‐Length‐04‐CCT‐80‐MULT‐120 2 Weeks eW Graze MX Powercore L50‐E‐Length‐12‐CCT‐80‐MULT‐Beam 2 Weeks eW Graze QLX Powercore L50‐E‐Length‐10‐CCT‐80‐MULT‐Beam 2 Weeks eW Graze QLX Powercore 5W L50‐E‐Length‐04‐CCT‐80‐MULT‐Beam 2 Weeks TROV On Demand* Traxon EcoSense TROV Traxon Cove Light AC HE L35‐I‐Length‐02‐CCT‐80‐MULT‐120 2 Weeks Traxon Cove Light AC Dim 2700K, 3000K, 3500K L35‐I‐Length‐04‐CCT‐80‐MULT‐120 2700K, 3000K, 3500K 48 Hours Traxon Cove Light AC Dim 4000K L35‐I‐Length‐04‐40‐80‐MULT‐120 4000K 2 Weeks Traxon Cove Light AC HO 3000K L35‐I‐Length‐08‐30‐80‐ MULT‐120 3000K 48 Hours Traxon Cove Light AC HO L35‐I‐Length‐08‐(27, 35, 40)‐80‐ MULT‐120 2700K, 3500K, 4000K 2 Weeks Traxon Cove Light AC HO Graze L50‐I‐Length‐10‐CCT‐80‐MULT‐BEAM 2 Weeks Traxon Nano Liner Allegro AC XB L50‐E‐Length‐10‐CCT‐80‐MULT‐BEAM 2 Weeks *For complete program details and disclaimers go to: www.trovondemand.com Appendix CONFIDENTIAL | © 2015 ECOSENSE Memorial Presbyterian Church LOCATION: St. Louis, MO LIGHTING DESIGN: SWT Design
© Copyright 2026 Paperzz