With over 24,000 product configurations Build On Demand TROV

L35‐I‐12‐04‐27‐80‐MULT‐120
L35‐I‐48‐04‐27‐80‐MULT‐120
L35‐I‐12‐04‐30‐80‐MULT‐120
L35‐I‐48‐04‐30‐80‐MULT‐120
L35‐I‐12‐04‐35‐80‐MULT‐120
L35‐I‐48‐04‐35‐80‐MULT‐120
L35‐I‐12‐08‐30‐80‐MULT‐120
L35‐I‐48‐08‐30‐80‐MULT‐120
With over 24,000 product configurations
Build On Demand TROV meets every designers needs
for indirect architectural lighting
148 hours equates to two business working days and for Most Popular TROV® orders less than 200 units. 22 weeks equates to two calendar weeks and for Build On Demand TROV® orders less than 400 units. 3Products will be deemed late if the manufacturing lead time for an order exceeds 3 business days. 4This incentive promotion is valid from now till 4/22/16. The incentive promotion is only applicable to orders for the TROV® product line which are accepted by EcoSense and excludes orders for any accessories or special services. The incentive promotion shall not apply in the event that an order requires a qualifying TROV® product to be shipped simultaneously with an accessory. The maximum incentive value shall not exceed $60,000. The incentive promotion shall not apply to changes in manufacturing lead time that arise as a result of a force majeure event or other situations outside of our control, such as weather, natural disasters, fire, government action and supplier issues. EcoSense reserves the right to reject any order in its sole and absolute direction. Order size is determined by the total number of units per order, not SKU. All orders placed during a 7 calendar day period that ship to the same address will be included in calculating the order size. Lead time begins when order is accepted by EcoSense and communicated to customer, and ends when the product leaves the factory. Manufacturing lead time does not include delivery time, freight handling or customs. Delivery will vary based upon the customer’s location and selected shipping method. Orders will ship GROUND unless another method is selected. Order guarantee is based on longest lead item. It is highly recommended to notify EcoSense of any opportunities larger than 500 units in advance to ensure availability of materials and capacity
Most Popular TROV SKUs
BTO – Build to Order
Manufacturing Time
• 48 Hours / 2 Business Days = 1‐199 units
All TROV SKUs outside of CTO
Manufacturing Time By Order Size
• 10 Business Days = 1‐399 units
• 15 Business Days = 400‐499 units
• 20 Business Days = 500‐999 units*
• 25 Business Days = 1000‐1999 units*
• 30‐40 Business Days = 2k+ units*
Most Popular TROV SKUs
L35‐I‐12‐04‐27‐80‐MULT‐120
L35‐I‐48‐04‐27‐80‐MULT‐120
L35‐I‐12‐04‐30‐80‐MULT‐120
L35‐I‐48‐04‐30‐80‐MULT‐120
L35‐I‐12‐04‐35‐80‐MULT‐120
L35‐I‐48‐04‐35‐80‐MULT‐120
L35‐I‐12‐08‐30‐80‐MULT‐120
L35‐I‐48‐08‐30‐80‐MULT‐120
Most Popular TROV SKUs In RED – All other configurations (24,000) = BTO Built to Order
MODEL / SIZE
INTERIOR/
EXTERIOR
LENGTH
POWER
Watts/LF
CCT
CRI
VOLTAGE
OPTICS
MULT
(110‐277VAC)
Grazing
Washing
9x29
9x59
25x25
25x33
40x48
40x60
40x90
L35
I
12”
02
WHITE CCT
MONO COLOR
80+
L50
E
48”
04
06
22
27
RD
GR
90+
08*
30
BL
15x15
25x45
10
35
AM
15x23
25x75
45x15
12
40
50
15x35
15x65
39x9
55x25
40x40
70x40
70x70
*8 WATT ONLY
* It is highly recommended to notify EcoSense of any opportunities larger than 500 units in advance to ensure availability of materials and capacity.
AVAILABLE IN 3000K
COVE
120
ASYM
*It is highly recommended to notify EcoSense of any opportunities larger than 500 units in advance to ensure availability of materials and capacity.
LINE OF LIGHT
LOL
Delivery Estimates
Shipping Estimates
Most Popular
BTO
Time To Manufacture
24 Hrs.
2 Weeks
Orders 1‐199 units
Orders 1‐399 units
Customs Clearance
1‐2 Days
FedEx Ground Shipping
1‐5 Days for Continental United States*
● Most Popular TROV SKUs Delivered to New England
CTO – Configure to Order(High Volume TROV SKUs) 1‐199 Units
≈ 1 Week Delivered*
*FedEx Shipping Calculator
http://www.fedex.com/grd/maps/ShowMapEntry.do
Shipping from El Paso, TX ZIP 79936
•
•
•
1 Business Day to Manufacture
1‐2 Business Days Customs Clearance
4 Business Days Ground Shipping
Expedited shipping available for an additional fee
● Built To Order Delivered to New England
BTO – Built to Order (All TROV SKUs outside of CTO) 1‐399 Units
≈ 3 Weeks Delivered*
•
•
•
10 Business Day to Manufacture
1‐2 Business Days Customs Clearance
4 Business Days Ground Shipping
Expedited shipping available for an additional fee
*See disclaimer for complete terms EcoSense Lighting Website and Landing Page
ecosenselighting.com
trovondemand.com
EcoSense Order Confirmation with Expected Ship Date
Disclaimer
148 hours equates to two business working days and for Most Popular TROV® orders less than 200 units.
22 weeks equates to two calendar weeks and for Build On Demand TROV® orders less than 400 units.
3Products will be deemed late if the manufacturing lead time for an order exceeds 3 business days.
4This incentive promotion is valid from now till 4/22/16. The incentive promotion is only applicable to orders for the TROV® product line which are accepted by EcoSense and excludes orders for any accessories or special services. The incentive promotion
shall not apply in the event that an order requires a qualifying TROV® product to be shipped simultaneously with an accessory. The maximum incentive value shall not exceed $60,000. The incentive promotion shall not apply to changes in manufacturing lead time that arise as a result of a force majeure event or other situations outside of our control, such as weather, natural disasters, fire, government action and supplier issues. EcoSense reserves the right to reject any order in its sole and absolute direction.
Order size is determined by the total number of units per order, not SKU. All orders placed during a 7 calendar day period that ship to the same address will be included in calculating the order size. Lead time begins when order is accepted by EcoSense and communicated to customer, and ends when the product leaves the factory. Manufacturing lead time does not include delivery time, freight handling or customs. Delivery will vary based upon the customer’s location and selected shipping method. Orders will ship GROUND unless another method is selected. Order guarantee is based on longest lead item. It is highly recommended to notify EcoSense of any opportunities larger than 500 units in advance to ensure availability of materials and capacity.
TROV Cross from Other Manufactures
TROV On Demand*
Philips Color Kinetics
EcoSense TROV
eW Cove EC Powercore
L35‐I‐Length‐02‐CCT‐80‐MULT‐120
2 Weeks
eW Cove QLX Powercore Medium Beam
L50‐I‐Length‐06‐CCT‐80‐MULT‐40x90
2 Weeks
eW Cove QLX Powercore Wide Beam
2700K, 3000K, 3500K
L35‐I‐Length‐04‐CCT ‐80‐MULT‐120
2700K, 3000K, 3500K
48 Hours
eW Cove QLX Powercore Wide Beam
4000K
L35‐I‐Length‐04‐40‐80‐MULT‐120
2 Weeks
eW Cove MX Powercore Medium Beam
L50‐I‐Length‐10‐CCT‐80‐MULT‐40x90
eW Cove MX Powercore Wide Beam
3000K CCT
L35‐I‐Length‐08‐30 ‐80‐MULT‐120
TROV On Demand*
Lumen Pulse
EcoSense TROV
Lumencove 2.0 RO
2700K, 3000K, 3500K
L35‐I‐Length‐04‐CCT‐80‐MULT‐12
2700K, 3000K, 3500K
48 Hours
Lumencove 2.0 RO (40K)
L35‐I‐Length‐04‐CCT (40K) ‐80‐MULT‐120
2 Weeks
Lumenfacade Interior 5W/LF
L50‐I‐Length‐04‐CCT‐80‐MULT‐BEAM
2 Weeks
Lumenfacade Interior 8.5W/LF
L50‐I‐Length‐08‐CCT‐80‐MULT‐BEAM
2 Weeks
Lumenfacade Interior 15.25W/LF
L50‐I‐Length‐12‐CCT‐80‐MULT‐BEAM
2 Weeks
2 Weeks
Lumenfacade Exterior 5W/LF
L50‐E‐Length‐04‐CCT‐80‐MULT‐BEAM
2 Weeks
48 Hours
Lumenfacade Exterior 8.5W/LF
L50‐E‐Length‐08‐CCT‐80‐MULT‐BEAM
2 Weeks
Lumenfacade Exterior 15.25W/LF
L50‐E‐Length‐12‐CCT‐80‐MULT‐BEAM
2 Weeks
Lumenfacade HORIZONTAL 5W
L50‐E‐Length‐04‐CCT‐80‐MULT‐BEAM
2 Weeks
Lumenfacade HORIZONTAL RO
L50‐E‐Length‐08‐CCT‐80‐MULT‐BEAM
2 Weeks
Lumenfacade HORIZONTAL HO
L50‐E‐Length‐12‐CCT‐80‐MULT‐BEAM
2 Weeks
Lumenfacade Remote 5W
L50‐E‐Length‐04‐CCT‐80‐MULT‐BEAM
2 Weeks
Lumenfacade Remote RO
L50‐E‐Length‐08‐CCT‐80‐MULT‐BEAM
2 Weeks
Lumenfacade Remote HO
L50‐E‐Length‐12‐CCT‐80‐MULT‐BEAM
2 Weeks
Lumencove XT Exterior RO
L50‐E‐Length‐04‐CCT‐80‐MULT‐120
2 Weeks
Lumencove XT Exterior HO
L50‐E‐Length‐12‐CCT‐80‐MULT‐120
2 Weeks
Lumencove XT Direct View
L50‐E‐Length‐04‐CCT‐80‐MULT‐LOL
2 Weeks
Lumencove 2.0 HO
L35‐I‐Length‐12‐CCT‐80‐MULT‐120
2 Weeks
eW Cove MX Powercore Wide Beam
L35‐I‐Length‐08‐CCT‐80‐MULT‐120
2700K, 3500K, 4000K
2 Weeks
eW Fuse Powercore 10°x60°
L50‐I‐Length‐10‐CCT‐80‐MULT‐9x59
2 Weeks
eW Fuse Powercore 30°x60°
L50‐I‐Length‐10‐CCT‐80‐MULT‐40x60
2 Weeks
eW Graze EC Powercore
L50‐E‐Length‐04‐CCT‐80‐MULT‐120
2 Weeks
eW Graze MX Powercore
L50‐E‐Length‐12‐CCT‐80‐MULT‐Beam
2 Weeks
eW Graze QLX Powercore
L50‐E‐Length‐10‐CCT‐80‐MULT‐Beam
2 Weeks
eW Graze QLX Powercore 5W
L50‐E‐Length‐04‐CCT‐80‐MULT‐Beam
2 Weeks
TROV On Demand*
Traxon
EcoSense TROV
Traxon Cove Light AC HE
L35‐I‐Length‐02‐CCT‐80‐MULT‐120
2 Weeks
Traxon Cove Light AC Dim
2700K, 3000K, 3500K
L35‐I‐Length‐04‐CCT‐80‐MULT‐120
2700K, 3000K, 3500K
48 Hours
Traxon Cove Light AC Dim
4000K
L35‐I‐Length‐04‐40‐80‐MULT‐120
4000K
2 Weeks
Traxon Cove Light AC HO
3000K
L35‐I‐Length‐08‐30‐80‐ MULT‐120
3000K
48 Hours
Traxon Cove Light AC HO
L35‐I‐Length‐08‐(27, 35, 40)‐80‐ MULT‐120
2700K, 3500K, 4000K
2 Weeks
Traxon Cove Light AC HO Graze
L50‐I‐Length‐10‐CCT‐80‐MULT‐BEAM
2 Weeks
Traxon Nano Liner Allegro AC XB
L50‐E‐Length‐10‐CCT‐80‐MULT‐BEAM
2 Weeks
*For complete program details and disclaimers go to:
www.trovondemand.com
Appendix
CONFIDENTIAL | © 2015 ECOSENSE
Memorial Presbyterian Church
LOCATION: St. Louis, MO
LIGHTING DESIGN: SWT Design