Worksheets 3 – Material flow analysis 3 – Worksheets Example worksheets Worksheet 3-1: Flowchart – 1 No.: 1 For: Water Well water Company: Cheers Beers Ltd I-1 O-1 1 Sanitary use Washing area Wastewater Wastewater treatment 2 Bottle cleaning 3 Production 4 Cooling O-2, O-3 Water in beer, wet spent grain and diatomaceous earth Additional information: x no O attached Process description: 1 x yes O no Worksheets 3 – Material flow analysis Worksheet 3-2: Water data sheet Balance scope: Entire company No. 1 Water input I-1 Well water Balance period: 2002 Quantity 272 000 Unit2 m³ Company: Cheers Beers Ltd Data source3/notes Book-keeping, water meter m³ No. 1 Water consumer 1 Washing water 2 Cleaning water 3 Production water 4 5 Quantity 10 000 Unit2 m³ % Data source3/notes Meter 117 500 m³ Calculated 42 500 m³ Meter Cooling water 102 000 m³ Meter Input wastewater treatment 142 000 m³ Meter m³ m³ No. 1 Water output O-1 Wastewater discharge O direct 1 3 Quantity 244 000 Unit2 m³ X indirect O-2 Water in spent grain O-3 Sold beer Notes Important materials: alkaline solution, beer Important limit values: COD, BOD, T, pH Description of on-site wastewater treatment: Biological pre-treatment, Reduction of COD from approx. 1 000 mg/l to approx. 800 mg/l 3 000 m³ Calculated 25 000 m³ Book-keeping = Position no. from flowchart 3-1 = Balance in m³ not precise (general assumption: density 1 kg/l) = EDP, books, routine measurement, own measurement, information from production, documentation of equipment, calculation, estimate, etc. 2 2 Worksheets 3 – Material flow analysis Worksheet 3-1: Flowchart – 2 No.: 2 For: Beer losses Company: Cheers Beers Ltd I-1 Storage tanks Filtration Filling Labelling Product storage 1 Additional information: 2 x no 3 4 O attached 5 6 Process description: 3 O-1 x yes O no Worksheets 3 – Material flow analysis Worksheet 3-3: Material tracing sheet Material: Beer losses Company: Cheers Beers Ltd Balance scope: Storage tanks to filling line Balance period: 2002 No. 1 Material input I-1 Beer after fermentation Quantity 257 700 Unit2 hl Data source3/notes No. 1 Beer losses by 1 Storage tank cleaning Quantity 1 930 Unit2 hl Data source3/notes Approx. 25 % 1 700 hl Approx. 22 % 2 Filtration 3 Underfilling 920 hl Approx. 12 % 4 Broken bottles 375 hl <5% 5 Cleaning of pipes 2 700 hl Approx. 35 % 6 Product analysis/quality 75 hl <1% 7 700 hl Beer losses in total approx. 3% Total No. 1 Material output O-1 Filled beer 1 3 Quantity 250 000 Unit2 hl Data source3/notes 2 = Balance should be drawn up in kg (here: unit used in beer production: hl) = Position no. from flowchart 3-1 = EDP, books, routine measurement, own measurement, information from production, documentation of equipment, calculation, estimate, etc. 4 Worksheets Worksheet 3-1: Flowchart – 3 No.: 3 For: 3 – Material flow analysis (for data please refer to the worksheets of Volume 1) Production process Company: Cheers Beers Ltd Cleaning: NaOH, Nitric acid, Cleaning agent A-D, Disinfectant A,B, Per acetic acid Water Lactic acid Mashing Hops Brewing Raw barley Wet used grains, vapor Heat exchange Quality control Soaking Germinating Energy Drying Fermentation Cooling energy Diatom. earth Bottles, crown caps Steam Yeast treatment Storage Filtration Filling Diatom. earth Steam generator Water treatment Wastewater treatment Compr. air, Cooling Broken glass, reject CO2-recovery Workshop, Laboratory …. Pasteurization Bottles Labels, glue Energy Caustic soda Water Used yeast Labelling Product reject Residual waste Hazardous waste Spent oil Cardboard, plastics … Bottle cleaning Storage Labels, wastewater broken glass Beer Wastewater Additional information: x no O attached Process description: x yes O no 5 Heating oil Water Electricity Chloric acid Worksheets 3 – Material flow analysis Empty worksheets Worksheet 3-1: Flowchart No.: Additional information: For: Company: O no O attached Process description: 6 O yes O no Worksheets 3 – Material flow analysis Worksheet 3-2: Water data sheet Balance scope: No. 1 Balance period: Water input Quantity Company: Unit2 m³ Data source3/notes m³ No. 1 Water consumer Quantity Unit2 m³ % Data source3/notes m³ m³ m³ m³ m³ m³ m³ No. 1 Water output Wastewater discharge O direct Quantity Unit2 m³ O indirect Notes Important materials: Important limit values: Description of on-site wastewater treatment: m³ m³ 1 3 2 = Balance in m³ not precise (general assumption: density 1 kg/l) = Position no. from flowchart 3-1 = EDP, books, routine measurement, own measurement, information from production, documentation of equipment, calculation, estimate, etc. 7 Worksheets 3 – Material flow analysis Worksheet 3-3: Material tracing sheet Material: Company: Balance scope: Balance period: No. 1 Material input No. 1 No. 1 1 3 Material output Quantity Unit2 Data source3/notes Quantity Unit2 Data source3/notes Quantity Unit2 Data source3/notes 2 = Balance should be drawn up in kg = Position no. from flowchart 3-1 = EDP, books, routine measurement, own measurement, information from production, documentation of equipment, calculation, estimate, etc. 8
© Copyright 2025 Paperzz