BIM Enterprise Lifecycle Activity Node Tree 07/2010 Perform Enterprise Building Information Management 0 Manage Building 1 Establish Management Team 1.1 Establish Vision, Mission, and Purpose 1.2 Determine Internal Capabilities/ Operations 1.21 Understand Owner Needs/ Vision 1.11 Develop Work Scope and Needs 1.12 Determine Facility Requirements 1.22 Structure and Staff Management Team 1.13 Define Building Work Scope and Needs 1.23 Determine Facility Capabilities 1.14 Conduct Forecasting 1.24 Assess Facility Descrepencies 1.15 Develop Strategy for Resource and Service Acquisition 1.25 Plan/Control Building 1.3 Identify Services and Resources Required 1.41 Understand Work Scope and Performance Criteria 1.31 Develop Building Management Plan 1.32 Provide Scope of Work Information 1.42 Administer Contracts/PO’s and Agreements 1.33 Prepare Invitation to Bid, Purchase Requisitions and Submit Proposal 1.43 Implement and Supervise Work (Contracts) 1.34 Monitor Building and Progress 1.35 Analyze Performance of Building 1.36 Develop Preliminary Building Scope Work 1.16 Acquire Services and Resources 1.4 Conduct Marketing 1.5 Market Building Capabilities 1.51 Maintain Building Data/Information 1.6 Market for Goods and Services 1.52 Review Proposals and Select Agent/ Contractor 1.44 Execute Contracts/ Agreements 1.45 Assign Planning Team 2.1 Study/Define Needs 2.2 Create Data/ Information 1.61 Study User Requirements 2.21 Collect Data/ Information 1.62 Evaluate Existing Facilities 2.22 Store Data/ Information 1.63 Retrieve Data/ Information 1.64 Determine Needs 2.23 Generate Alternatives 2.23 Study Feasibility of Alternatives 2.3 Study Economic Feasibility 2.31 Estimate Funding Requirement 2.311 Conduct Cost/ Benefit Analysis 2.312 Allocate/Secure Funds 2.313 Receive and Inspect Resources 1.46 Update Data/ Information 1.65 Distribute/Store Resources and Manage Inventory 1.47 Transmit Data/ Information 1.66 Study/Determine Technical Properties 2.321 Archive Data/ Information 1.67 Study Availability of Resources and Technology 2.322 Adjust Building Management Criteria Based on Performance 1.37 Study Technical Feasibility 2.32 Study Execution Possibility 2.323 Study Environmental Feasibility 2.33 Operate Building 5 Design Building 3 Plan Building 2 Construct Building 4 Develop Program 2.4 Develop Project Execution Plan (PEP) 2.5 Select Site 2.6 Understand Functional Requirements 3.1 Explore Concepts 3.2 Develop System/ Engineering Schematics 3.3 Communicate Design to Others 3.5 Develop Design 3.4 Gather Information 2.41 Identify Required Services 2.51 Identify Candidate Sites 2.61 Assimilate and Analyze Information 3.11 Perform Preliminary Studies 3.21 Develop Standard System Schemes 3.31 Perform Systems Development and Layouts 3.41 Develop PostDesign Drawings 3.51 Define Scope 2.42 Study Construction Market Conditions 2.52 Evaluate and Select Site 2.62 Establish Project Objectives 3.12 Prepare and Develop Concepts 3.22 Coordinate to Find Compatibles 3.32 Perform Design Studies 3.42 Perform Design Reviews 3.52 Coordinate Concepts 3.23 Develop Integrated Schematics 3.33 Develop Outline Specs, Drawings and Schedules 3.43 Validate and Approve Design 3.53 Acquire Design Approval 3.44 Deliver Post-Design Documents and Acquire Approval 3.54 Develop Design Criteria 2,43 Develop Project Plan 2.53 Develop Site Criteria 2,44 Develop Contracting Plan 2.54 Communicate Program 2.45 Communicate Project Execution Plan 2.55 Investigate Site (for Design) 2.63 Establish Design Parameters 3.13 Review, Evaluate and Select Concepts 3.24 Evaluate and Select Schematics/ Engineered Solutions 3.34 Plan and Control Work 4.1 Develop Construction Plan 4.11 Determine Scope of Work and Coordinate Planning 4.111 Select Work Methods 4.112 Provide Resources (Goods and Services) 4.2 Receive and Inspect Resources (Goods and Services) 4.21 Store Resources and Manage Inventory 4.22 Perform Construction 4.3 Perform Commisioning 4.4 Plan Daily Work 4.31 Distribute Resources 4.32 Execute Construction Activities 4.33 Study Impact on Vicinity 2.331 Study Impact on Utilities 2.332 The DRAFT BIM Enterprise Lifecycle Node Tree was developed utilizing a number of artifacts and best practice resources including 1.The Penn State Computer Integrated Construction Research Program Integrated Facility Management Process Model- POC- Dr. John Messner, Associate Professor of Architectural Engineering at The Pennsylvania State University 2.The Building Information Model (BIM) & Industry Foundation Classes (IFC) ISO PAS 16739 3.The Information Delivery Manual for Precast Concrete - Dr. Charles Eastman, Professor, College of Architecture Graduate Programs 4. Construction Operations Building Information Exchange (COBie) - Dr.William East, Research Civil Engineer at the Engineer Research and Development Center 5. Office of the UnderSecretary of Defense Installations and Environment, Department of Defense Business Enterprise Architecture, Real Property 6. OMNICLASS - A Strategy for classifying the Built Environment - A project of the Construction Specifications Institute Study Impact on Community 2.333 Study Environmental Impact on Building 2.334 Communicate Results Decisions 2.34 Review Data 5.11 Select Critical Points/Areas to Monitor 5.21 Plan Operations 5.12 Select Monitoring Mechanism 5.22 Understand Operations Plan and User Needs 5.121 Estimate Work 4.113 Identify Location for Work 4.331 Schedule Operations 5.122 Balance Resources with Workload Requirements 4.114 Set Up Work Area 4.332 Determine User Needs 5.123 Select Building Materials and Equipment 3.412 Schedule Work Activities 4.115 Prepare Resources 4.333 Assign Operations Execution Team 5.124 Configure Layout of Building Rooms and Zones 3.413 Analyze Plan 4.116 Perform Work 4.334 Execute/ Implement Plan 4.12 Clean Up Work Area 4.335 Perform Initial Systems Design Layout 3.411 Monitor Performance 4.13 Inspect and Approve Work 4.34 Legend Node Tree Activity Manage Operations 5.1 Analyze Performance 4.14 Close Out Work 4.35 Acknowledge Services Rendered 4.341 Identify Inspection and Verification Participants 4.342 Schedule Inspection and Verification 4.343 Conduct Walkthrough and Inspection 4.344 Define, Record and Certify Discrepancies 4.345 Conduct Approval Process 4.346 Monitor Building Condition and Systems 5.2 Acquire Operations Services and Resources 5.13 Reduce to Information in Correct Format 5.23 Evaluate Conditions and Detect Problems 5.3 Evaluate Information Against Standards 5.31 Perform Discrepancy and Deficiency Resolution 5.4 Understand Problem 5.41 Understand User Standards 5.311 Determine Necessary Information and Skills 5.42 Classify/Sort Information 5.312 Assemble Necessary Information and Skills 5.43 Compare Information with Critical or Expected Conditions 5.313 Determine if Information is Within Tolerances 5.314 Locate and Identify Problems 5.32 Notify Problem Solving Mechanism 5.33 Develop/Design Solutions 5.44 Analyze Implications 5.45 Present Alternatives 5.46 Select Plan of Action and Prioritize Actions 5.5 Understand Alternatives and Implications 5.51 Select Alternative 5.52 Commit Services and Resources 5.53 Implement Plan 5.6 Perform Use of Facility/Building 5.7 Distribute Resources 5.61 Perform Facility/ Building Renovation 5.8 Conduct Work 5.62 Perform Facility/ Building Remodeling 5.9 Inspect Work 5.63 Perform Facility/ Building Expansion 5.10 Perform Facility/ Building Disposal, Reuse, Recycling 5.11
© Copyright 2026 Paperzz