The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation into place Concrete behind the window sills Ready for the plasterers Insulation in place Pumping insulation into the cavity walls Insulation in the garage roof The plasterers first fix expanded metal to prevent cracking when the building is finished. They then apply a scratch coat of mortar and finish with a coat of carlite Between wall and ceiling Between door frame and window Above the door frames Around the fireplace Scratch coat begins Scratch coat finished Carlite Finish arrives Trestles to help the plasterer reach the ceiling A finished ceiling Finished walls