RENAISSANCE - LYON FRANCE RENAISSANCE LYON WP Progress and Plans WP 2: Monitoring and Analysis Christophe Ménézo Professor University of Savoy / LOCIE Invited by INSA Lyon-CETHIL [email protected] RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program 1 WP 2.1 Electrical Network RENAISSANCE - LYON FRANCE Planned Activities: - Platform of measurements of the impact of the PV on the electrical distribution networks (at INSA of Lyon) - Measurements of the impact of PV systems installed in Lyon-Confluence Area on the distribution network RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program 2 WP 2.1 Electrical Network RENAISSANCE - LYON FRANCE Measurement Platform at INSA Electricity quality evaluation produced by standard EN 50-160 inverter Done Site : Electrical Engineering Dpt Definition of platform objectives and design Supplier (Tenesol) RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program 3 WP 2.1 Electrical Network RENAISSANCE - LYON FRANCE Measurement series led on Lyon-Confluence Network Project Submission to the National Research Agency (ANR) Done Agreement between EDF R&D, INES RDI, Transénergie and INPGrenoble Contact with INSA School of Electrical Engineering Master student subject RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program 4 WP 2.1 Electrical Network RENAISSANCE - LYON FRANCE Measurement Platform at INSA Electricity quality evaluation produced by standard EN 50-160 inverter Definition of the measurements protocol Done Installation of the platform : 2 kWc Planed For next Installation of Practical Courses for Engineering Students of INSA 18 months j RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program 5 WP 2.1 Electrical Network RENAISSANCE - LYON FRANCE Measurement series led on Lyon-Confluence Network Constructive data-gathering of the distribution network on the Lyon-Confluence area Planed For next Measurement Protocol definition with EDF R&D and INSA 18 months Waiting for construction of the buildings and PhotoVoltaic systems : delay in the construction schedule for blocks A, B, C => to see other place for measurements RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program 6 WP 2.2 Experience Feedback Monitoring ENERTECH RENAISSANCE - LYON FRANCE Planned Activities: Multiscale Monitoring - Global Monitoring - Detailed Monitoring - Localised Monitoring RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program 7 WP 2.2 Experience Feedback Monitoring RENAISSANCE - LYON FRANCE Global Monitoring (promoters and dealers) - Counting and sub-counting heating room and sub-station and Solar Domestic Hot Water - Counting and under counting electricity in building Detailed Monitoring (Enertech) - By housing - Followed Consumption: Cooking, lighting, washing machine - Followed thermal evolution Localised Monitoring (INSA-CETHIL) - Some residences which have been numerically modeled First contact with Inhabitants (Hespul, Promoters; INSA, Enertech) RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program 8 WP 2.2 Experience Feedback Monitoring RENAISSANCE - LYON FRANCE Detailed Monitoring (Enertech) : expected results (such as in Restart Project) RESTART Thermal Confort Confort d'été Evaluation des apports internes en juin Human thermal gain Apports humains 28,2% Apartment Electricity Electricité spécifique Use dans les logements 39,2% Apports récupérables Domestic Hotsanitaire Water Eau chaude Total : 190,5 kWh/jour soit +5,4°C par rapport à l'extérieur 5,2% Domestic HotECS Water Distribution dans distribution le logement 4,0% Electricité spécifique Common dans les Electricity services Use 17,3% généraux RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program 6,1% Cooking Cuisson ENERTECH 9 WP 2.2 Experience Feedback Monitoring RENAISSANCE - LYON FRANCE Tests of sensors accuracy (INSA-CETHIL) Wireless sensors Identification of sensors (for Air temp. and Humidity) Use of Infrared camera (inside/outside?) Garde Thermique Paroi vitrée (sud) Soufflage Local 1 Caisson climatique Local 2 Porte de séparation MINIBAT Large range of : Temp. ; sampling time ; autonomy RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program 10 WP 2.2: Quality Control and Performance Analysis RENAISSANCE - LYON FRANCE Analysis of progress - Delays in construction => delays for monitoring - Submission of a new schedule to the EC (in relation with WP 1.5) Plans for the next 6 months - Training session organized for sales agents - Plans depend on the delays of construction + possibilities to extend the contract - First data aquisition in almost one year (minima) RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program 11 WP 2.3 European Highlight RENAISSANCE - LYON FRANCE Analysis of progress - Strong points : Zaragosa and Lyon not in phase - Experiences of Zaragosa not highlighted enough for Lyon - Networking opportunities should be much more used (webcam exchange for regular exchange for specific topics (focus), …) RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program 12 WP 2.3 European Highlight RENAISSANCE - LYON FRANCE Plans for the next 6 months (end of year 3) - Lyon strategy complete definition and planning of phases Comparison with Zaragossa - Common identification of what has to be highlight ? Identification of strong/weak points on each side? Definition of a monitoring strategy referential? RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program 13 RENAISSANCE - LYON FRANCE ENERTECH Contact Christophe MENEZO [email protected] RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program 14
© Copyright 2026 Paperzz