renaissance lyon - Renaissance Project

RENAISSANCE
- LYON FRANCE
RENAISSANCE LYON
WP Progress and Plans
WP 2: Monitoring and Analysis
Christophe Ménézo
Professor University of Savoy / LOCIE
Invited by INSA Lyon-CETHIL
[email protected]
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program
1
WP 2.1 Electrical Network
RENAISSANCE
- LYON FRANCE
Planned Activities:
- Platform of measurements of the impact of the
PV on the electrical distribution networks (at INSA
of Lyon)
- Measurements of the impact of PV systems
installed in Lyon-Confluence Area on the
distribution network
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program
2
WP 2.1 Electrical Network
RENAISSANCE
- LYON FRANCE
Measurement Platform at INSA
Electricity quality evaluation produced by standard EN 50-160 inverter
Done
Site : Electrical Engineering Dpt
Definition of platform objectives and design
Supplier (Tenesol)
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program
3
WP 2.1 Electrical Network
RENAISSANCE
- LYON FRANCE
Measurement series led on Lyon-Confluence
Network
Project Submission to the National Research
Agency (ANR)
Done
Agreement between EDF R&D, INES RDI,
Transénergie and INPGrenoble
Contact with INSA School of Electrical Engineering
Master student subject
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program
4
WP 2.1 Electrical Network
RENAISSANCE
- LYON FRANCE
Measurement Platform at INSA
Electricity quality evaluation produced by standard EN 50-160 inverter
Definition of the measurements protocol
Done
Installation of the platform : 2 kWc
Planed
For next
Installation of Practical Courses for
Engineering Students of INSA
18 months
j
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program
5
WP 2.1 Electrical Network
RENAISSANCE
- LYON FRANCE
Measurement series led on Lyon-Confluence
Network
Constructive data-gathering of the distribution
network on the Lyon-Confluence area
Planed
For next
Measurement Protocol definition with EDF R&D and
INSA
18 months
Waiting for construction of the buildings and
PhotoVoltaic systems : delay in the construction
schedule for blocks A, B, C => to see other place
for measurements
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program
6
WP 2.2 Experience Feedback Monitoring
ENERTECH
RENAISSANCE
- LYON FRANCE
Planned Activities:
Multiscale Monitoring
- Global Monitoring
- Detailed Monitoring
- Localised Monitoring
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program
7
WP 2.2 Experience Feedback Monitoring
RENAISSANCE
- LYON FRANCE
Global Monitoring (promoters and dealers)
- Counting and sub-counting heating room and sub-station and Solar
Domestic Hot Water
- Counting and under counting electricity in building
Detailed Monitoring (Enertech)
- By housing
- Followed Consumption: Cooking, lighting, washing machine
- Followed thermal evolution
Localised Monitoring (INSA-CETHIL)
- Some residences which have been numerically modeled
First contact with Inhabitants
(Hespul, Promoters; INSA, Enertech)
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program
8
WP 2.2 Experience Feedback Monitoring
RENAISSANCE
- LYON FRANCE
Detailed Monitoring (Enertech) : expected results (such as in Restart Project)
RESTART
Thermal
Confort
Confort
d'été
Evaluation des apports internes en juin
Human
thermal
gain
Apports
humains
28,2%
Apartment
Electricity
Electricité
spécifique
Use
dans les logements
39,2%
Apports
récupérables
Domestic
Hotsanitaire
Water
Eau chaude
Total : 190,5 kWh/jour soit
+5,4°C par rapport à
l'extérieur
5,2%
Domestic
HotECS
Water
Distribution
dans
distribution
le logement
4,0%
Electricité spécifique
Common
dans les Electricity
services
Use
17,3%
généraux
RENAISSANCE : a CONCERTO project financed by the European Commission on the
six framework program
6,1%
Cooking
Cuisson
ENERTECH
9
WP 2.2 Experience Feedback Monitoring
RENAISSANCE
- LYON FRANCE
Tests of sensors accuracy (INSA-CETHIL)
Wireless sensors
Identification of sensors (for Air temp. and
Humidity)
Use of Infrared camera (inside/outside?)
Garde Thermique
Paroi vitrée (sud)
Soufflage
Local 1
Caisson climatique
Local 2
Porte de séparation
MINIBAT
Large range of :
Temp. ; sampling time ;
autonomy
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program
10
WP 2.2: Quality Control and
Performance Analysis
RENAISSANCE
- LYON FRANCE
Analysis of progress
- Delays
in construction => delays for monitoring
- Submission of a new schedule to the EC (in relation with WP
1.5)
Plans for the next 6 months
- Training session organized for sales agents
- Plans depend on the delays of construction + possibilities to
extend the contract
- First data aquisition in almost one year (minima)
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program
11
WP 2.3 European Highlight
RENAISSANCE
- LYON FRANCE
Analysis of progress
- Strong points : Zaragosa and Lyon not in phase
- Experiences of Zaragosa not highlighted enough for Lyon
- Networking opportunities should be much more used
(webcam exchange for regular exchange
for specific topics (focus), …)
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program
12
WP 2.3 European Highlight
RENAISSANCE
- LYON FRANCE
Plans for the next 6 months (end of year 3)
- Lyon strategy complete definition and planning of phases
Comparison with Zaragossa
- Common identification of what has to be highlight ?
Identification of strong/weak points on each side?
Definition of a monitoring strategy referential?
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program
13
RENAISSANCE
- LYON FRANCE
ENERTECH
Contact
Christophe MENEZO
[email protected]
RENAISSANCE : a CONCERTO project financed by the European Commission on the six framework program
14