RENEWABLE ENERGY DEPLOYMENT IN ZAMBIA A Presentation made at the Match Making Workshop held at Yulong International Hotel on 14th October 2016 MINISTRY OF ENERGY AND WATER DEVELOPMENT PRESENTATION OUTLINE Overview of the Energy Sector Policy Measures on Renewable Energy Deployment Policy Measures on Demand Side Management MiniHydro Development OVERVIEW OF ENERGY SECTOR Major source of energy in Zambia is wood fuel (i.e. firewood and charcoal), with the largest consumer group being households in both rural and urban areas; Electricity installed capacity is 2,591MW 91% large hydro, 7.7% thermal (Coal, HFO and Diesel) and 1.7% renewable comprising of small hydros “Renewable hydro” = up to 20 MW 31.4% of population have access to electricity (Urban 67.3% & Rural 4.4%) Solar potential: 5.5kwh/m2/day 6-8 hrs/day, with energy output of Power situation in Zambia Generating Station Victoria Falls Kafue Gorge Kariba Complex (i.e. Kariba North Bank and Kariba Extensin Project) Itezhi-Tezhi Small Hydros Lunzua Hydro Lunsemfwa Ndola Energy Maamba Coal Plant Total At peak Off Peak Deficit (2,019-1,479.3) Current Capacity (MW) 101 650 427 80 19 4.5 14.8 44 139 1,479.3 National Power Demand (MW) 2,019 1,900 540 Installed Capacity (MW) 108 990 1080 120 24 14.8 56 50 150 2,593 …Cont Reduced generation Capacity attributed to: low rainfall experienced during 2014/2015 and 2015/16 season Leading to low water levels in the two main station of Kariba & Itezhi-Tezhi Dams To preserve the water levels: ZRA Allocated 20 Billion cubic meters of water (shared between ZESCO and ZPC) in 2016 compared to 40 billion in 2015 For 2017, ZRA has allocated 30 billion cubic meters Mitigation Measures Importation of Emergence power Migration to cost reflective tariffs MEWD/ERB & ZESCO working on gradual migration plan. 1st tariff adjustment expected by 4th Quarter 2016 2nd tariff adjustment expected by mid 2017 Subsequent adjustments to be informed by Cost of Service Study 35th Meeting of SADC Ministers responsible for Energy held in Botswana on 20th June 2016 reaffirmed earlier decision of 34th Meeting held in South Africa on 24th July, 2015 for all SADC countries to ensure cost reflective electricity tariffs by 31st December, 2019. OVERVIEW OF ENERGY SECTOR (CONT…) CURRENT ENERGY SECTOR POLICY AND LEGAL FRAMEWORK The National Energy Policy of 2008 is the overall guide for developments in the energy sector The NEP 2008 sets out Government’s intensions aimed at ensuring that the energy sector’s potential to drive economic growth and reduce poverty is harnessed Vision: To provide well developed, managed, reliable and sustainable energy resources for the improvement of the quality of life of all Zambians Guiding Principles: Development of appropriate energy technologies and resource to enhance development CURRENT ENERGY SECTOR POLICY AND LEGAS FRAMEWORK cont… The Energy Sector is governed by the following legal and institutional frameworks; Electricity Act, Energy Regulation Act, Rural Electrification Act, Petroleum Act, Petroleum Production and Exploration Act From the various Acts was developed the: Power System Development Master Plan - increase power generation and transmission facilities in the country Rural Electrification Master Plan - to increase electrification access in rural areas POLICY MEASURES ON RENEWABLE ENERGY DEPLOYMENT Policy and project development REFIT strategy - GRZ with the help of SATH and USAID has developed a Renewable Energy Feed-in Tariff strategy (REFiT) to promote investments in Renewable Energy development. REFIT strategy aims at implementing a total of 200 MW from renewable energy in the next 3 years 100 MW from hydro – up to 20 MW 100 MW from non hydro of which 50 MW would be solar POLICY MEASURES ON RENEWABLE ENERGY DEPLOYMENT (CONT…) Under REFiT strategy standardized projects development documents have been developed e.g PPA, Connection Agreement, Connection Guidelines and Implementation Agreement. REFiT strategy is expected to be adopted by end of 2016 GETFiT Programme Based on REFIT policy, GRZ with the assistance of KFW (Germany Development Bank) is working on the development of the Global Energy Transfer Feed-in Tariff (GET FiT) mechanism, to leverage tariffs for projects to be developed under the REFiT strategy POLICY MEASURES ON RENEWABLE ENERGY DEPLOYMENT (CONT…) The Government is development On-grid Solar Power Projects, with a total of 300 MW: Allocation of 250 MW under the Scaling Up Solar Programme by the IDC, with the support of the World Bank Group; (development of 2x50 MW solar plants underway) Allocation of 50 MW under the GetFit Zambia Programme with the assistance of the Germany Government Studies underway to assess RE absorption in the Grid (ZESCO with support of Power Africa) Government is Promoting Off-Grid RE projects (viable option to increase Access). China- Zambia South to South Cooperation of Renewable Energy Technology Transfer With the assistance of Danish Government, UNDP China and UNDP Zambia are providing technical support for the creation of an enabling environment for renewable energy deployment by removing market barriers. POLICY MEASURES ON RENEWABLE ENERGY DEPLOYMENT(CONT…) SE4ALL Initiative Aimed at increasing share of RE in the country Country Action Agenda & Investment Prospectus underway Renewable Energy Resource Map GRZ with support from World Bank is developing a resource map indicating the country’s solar and wind resource potential to guide investments on suitable locations POLICY MEASURES ON RENEWABLE ENERGY DEPLOYMENT (CONT…) Revision of Electricity and Energy Regulation Acts Reviews of Electricity and Energy Regulation Acts are on-going to take account of emerging issues in the energy sector Scaling Up Renewable Energy Program for Low Income Countries (SREP) US$40 million available for Zambia to assist private sector power project financing US$18 million-Grant & US$22 million-Concessional loans Preparation of Investment plan underway POLICY MEASURES ON RENEWABLE ENERGY DEPLOYMENT (CONT…) EU – Technical Assistance Facility Under the EU Technical Assistance Facility the following projects are being implemented: Energy Efficiency Quick Wins Actions; investments in both public and private sectors; Long Term Renewable Energy Targets: Guidance manual for prospective IPPs and review or REA mandate POLICY MEASURES ON DEMAND SIDE MANAGMENT DEMAND SIDE MANAGEMENT Tax waivers have been introduced on importation of energy efficient equipment including solar accessories, through SI No. 32 & 33 of 2008 GRZ is in the process of banning the Importation and local manufacturing of incandescent bulbs through an SI. An allowance will be given for the traders to clear the old stock Energy saving awareness campaigns, e.g. commemoration of annual energy Week. MEWD and ZESCO limited are currently working on a process to procure LEDs for free distribution across the country. with a view to save about 200MW. MEASURES ON HYDRO DEVELOPMENT Identification of Small Hydro Sites GRZ and ZESCO are currently undertaking a country wide identification exercise of small hydropower sites for exploitation. So far indication of a huge potential: many potential sites have been discovered in the Northern, Central and North Western Region. ZESCO Uprating Small Hydro Power Plants ZESCO is currently undertaking a programme of uprating and rehabilitating it’s already existing small power projects; Lusiwasi (12MW to 86MW) Chishimba Falls (6MW to 14.5MW) Musonda Falls (5MW to 10MW) OPPORTUNITIES IN RENEWABLE ENERGY SUB- SECTOR Low level of electrification rate -31.4% Rural 4.4%. Urban 67.3%. Abundant Resources Solar:6-8hrs./day, with energy output of 5.5kwh/m2/day Abundant potential Mini-hydro sites Biomass – 498MW (Irena Report 2014) Geothermal – 80 Hot Springs available for exploration On going Resource Map for wind and Solar, indicates wind speeds of above in parts of the country. OPPORTUNITIES IN RENEWABLE ENERGY SUB- SECTOR Enabling environment for private sector investment Reviewing of policies and Legislation Number of initiatives being implemented : South to South technology transfer, Target setting , S4ALL, etc. Fiscal Incentives Tax waivers introduced on importation of energy efficient equipment including Solar equipment through SI No. 32 & 33 of 2008 ZDA provides for incentives for electricity generated from Renewable Energy (Section 56 ZDA Act). SI No. 15 of 2011 – Power Stations and Generation of Power (Section 56 ZDA Act). Tax exemptions on solar equipment and other equipment for generation of power from renewable energy. Section 57 ZDA Act Provides for Duty Exemption for Machinery and Equipment for Enterprises Investing in Rural Areas. CONCLUSION Government is undertaking consented efforts to diversify the power sector to include renewable energy by ensuring that appropriate policies and legal frameworks are in place. To achieve this the Private Sector and the Cooperating part will play a very critical role. THANK YOU FOR YOUR ATTENTION CHINA-ZAMBIA SOUTH-SOUTH COOPERATION ON RENEWABLE ENERGY TECHNOLOGY TRANSFER PROJECT Project Update Dr. Lloyd Ngo – Project Manager Presentation Outline • Project General Overview • Project Objectives • Project Outcomes • Planned activities and Progress –2016 • Challenges and lessons learnt • Partnerships • Planned activities for 3rd and 4th Quarters 2016 Key actions planned for the next [two weeks] Legend: On Schedule Delayed Project General Overview • This is a 4-year (Started 2015) project that aims to support the access to electricity for rural communities in Zambia. • It will do so through the creation of an enabling environment for renewable energy technology deployment by removing market barriers. Key actions planned for the next [two weeks] • And through the strengthening of Cooperation between Zambia and China. Legend: On Schedule Delayed South-South Project General Overview • The project is being implemented by: • Ministry of Energy and Water Development - DoE, Zambia • Ministry of Science and Technology, China. Key actions planned for the next [two weeks] • UNDP China and UNDP Zambia are providing substantial implementation, procurement and administration support and technical expertise • The project is funded by the Danish Government • Budget: USD 2,624,400 Legend: On Schedule Delayed Project Objectives • The project’s overall objective is: To improve energy access and living conditions in rural Zambia through South-South Cooperation. Key actions planned for the next [two weeks] • The project has two specific objectives: • To promote electrification of rural communities in Zambia. • To strengthen China’s capacity for South-South Cooperation Legend: On Schedule Delayed Outcomes Key actions planned for the next [two weeks] Legend: On Schedule Delayed Planned activities and Progress 2016 Activity Status: Status Key actions planned for the next [two weeks] Progress and Comments • Second Draft was submitted and reviewed by DoE. To be submitted to ACCA21 for comments • This activity is delayed starting from lengthy recruitment process and also delays by the consultant • Final draft to be ready end of 3rd Quarter • Activity 1.1.1 is dependent on the completion of the first activity Legend: On Schedule Delayed Project Work Plan and Progress 2016 Activity Status: Comments Key actions planned for the next [two weeks] Progress and Comments • • • • EIZ and ERB have been approached to host this online forum on their websites Two senior staff members from University of Zambia were trained in China Two MoUs were negotiated with ISEC and Poly Solar with UNZA but yet to be signed Rural health centre to used for demonstration of energy by UNZA has been selected in Chongwe district (Initial load assessment has been done). In addition, • Terms of reference for the procurement of equipment and services to be published by ACCA21.This activity has limited funding. Department of Physics has been allocated land • With regard to training UNZA will focus on training Trainers of Trainers Legend: On Schedule Delayed Activity Status: Katoba Health Centre Key actions planned for the next [two weeks] Details • • • • • Located 50 Km from Lusaka city on Leopards Hill road. The facility has two buildings with 10 rooms in total. 3 staff houses (4 rooms each) There is an admission ward and labour ward. This facility provides service to about 11,000 people. Legend: On Schedule Delayed Project Work Plan and Progress 2016 Activity Status: Status Progress and Comments Key actions planned for the next [two weeks] • Two on-site capacity building workshops have been conducted with 16 key stakeholders trained • Initial 8 potential sites were proposed by ZESCO • An initial assessment was done to reduce the sites to 3 • Chipota Falls was selected as the most suitable site • Detailed survey has been done for Chipota Falls • Feasibility report expected in September 2016 Legend: On Schedule Delayed Site Selection Consideration Details • The following were considered for site selection • Estimated potential – From head and flow rate • Availability and distance of the load centre • Rough cost estimate • Environmental issuesKey actions planned for the next [two weeks] • Chilambwe Falls was ranked highly but was eliminated since it a heritage site • Chipota Falls was ranked 2nd as suitable site • Nyinaluzi was ranked 3rd due to the cost as it would require damming Legend: On Schedule Delayed Potential Sites: Nyinaluzi Activity Status: Key actions planned for the next [two weeks] Details • • • • • Located in Chief Mpande’s area in Mbala with estimated population of 20,000 The site is accessible by road up to the Falls. There is rural health centre and school about 3 km from the Falls. There is also a mission school, health centre and church about 20 Km from the site. Estimated potential - 200 kW Legend: On Schedule Delayed Potential Sites: Chilambwe Falls Activity Status: Key actions planned for the next [two weeks] Details • Located 75 Km from Kasama, Chalambwa Falls is under the National Heritage • The nearest growth centre is about 2.5 Km from the site • Estimated potential of 1 MW Legend: On Schedule Delayed Potential Sites: Chipota Falls Activity Status: Key actions planned for the next [two weeks] Details • • • • The falls is about 14 Km from the nearest growth Centre in Chief Kabamba’s area Estimated population of 15,000 people. The School with an estimated 900 pupils Health centre are located about 3 Km from the Great North Road. Estimated potential of about 300 kW. Legend: On Schedule Delayed Project Work Plan and Progress 2016 Time schedule for feasibility Study Key actions planned for the next [two weeks] Legend: On Schedule Delayed Activity Status: Project Work Plan and Progress 2016 Activity Status: Activity 2.1.1 Output 4.2 • Project Coordination established Structures • Create project coordination management structure and •Key achievements in the last [week] • Status [Detail the key achievements in the last period] • Global Steering Committee Meeting was held in January in Beijing China Key actions planned for the next [two weeks] • PSC meeting was held in August 2016 • Coordination meetings are held every fortnightly with UNDP China and ACCA21 Comments • Communication has been a challenge between IPs since Skype has been unreliable • Telephone line has been installed for easy communication with a possibility of using the line for teleconferencing Legend: On Schedule Delayed Project Work Plan and Progress 2016 Challenges lessons learnt • Limited budget on key outputs •Key achievements in the [week]and construction of the transmission lines • No budget forlast survey • [Detail the key achievements in the last period] • No budget for access road • Limited budget for Environmental Impact Assessment Key actions planned for the next [two weeks] • Discuss with Rural Electrification Authority and ZESCO to fund this activity • Ownership of the power plant • KGRTC has expressed interest to operate the power plant • Need for professional interpreters during training as some key Chinese experts have limited knowledge of English. • On-site training is better conducted in smaller groups Legend: On Schedule Delayed Partnerships/Networking •Key achievements in the last [week] • [Detail the key achievements in the last period] Key actions planned for the next [two weeks] Legend: On Schedule Delayed Planned activities for 3rd and 4th Quarters •Key achievements in the last [week] • [Detail the key achievements in the last period] Key actions planned for the next [two weeks] Legend: On Schedule Delayed Thank You
© Copyright 2026 Paperzz