Proposal of Threshold Modifications of MQW and P1 and P2 MQTL BLMs in IR7 Matti Kalliokoski 18th BLM Thresholds WG Meeting 17/08/2015 Introduction • Analysis made by Alessio shows that several monitors in IR7 will surpass their thresholds with maximum intensity due to debris from collimators • The analysis was made in comparison with the thresholds that are currently in the machine • Not the new thresholds which are foreseen to be implemented around TS2 17/08/2015 Matti Kalliokoski - 18th BLM Thresholds WG Meeting 2 Comparison of Values Element MQW Old Threshold MF=1.0 [Gy/s] New Required Ratio Ratio Threshold Threshold Required / Required / MF=0.1 [Gy/s] Old New [Gy/s] 2.43E-01 1.33E-02 2.77E-01 1.14 20.8 MQTL P1 4.06E-03 9.77E-05 3.50E-03 0.86 35.8 MQTL P2 4.18E-04 9.77E-05 8.94E-04 2.14 9.15 17/08/2015 • • The analysis by Alessio was made with using current applied thresholds with MF=1.0 In the new thresholds MF=0.1 was foreseen for LS families • Seems to be too low Matti Kalliokoski - 18th BLM Thresholds WG Meeting 3 THRI_MQW vs THRI.LS_MQW 17/08/2015 Matti Kalliokoski - 18th BLM Thresholds WG Meeting 4 THRI.(IP7).LS_MQW_FT Proposal • • • Proposed thresholds will be set using MF=1.0 RS9 set to 2.77E-1, others fixed to RS9 with an ad-hoc correction Needed only for IR7? • “Standard” thresholds for IR3 with MF=1.0 Running Sum RS01 RS02 RS03 RS04 RS05 RS06 RS07 RS08 RS09 RS10 RS11 RS12 Ratio FT/Std 1 1 1 1 1 1 1 1.04 2.07 4.60 4.62 4.62 17/08/2015 Matti Kalliokoski - 18th BLM Thresholds WG Meeting 5 THRI_B1.1_MQTLH vs THRI.LS.P1_MQTL 17/08/2015 Matti Kalliokoski - 18th BLM Thresholds WG Meeting 6 THRI.IP7.LS.P1_MQTL_FT Proposal • • Proposed thresholds will be set using MF=1.0 RS9 set to 3.5E-3, others fixed to RS9 with an ad-hoc correction Running Sum RS01 RS02 RS03 RS04 RS05 RS06 RS07 RS08 RS09 RS10 RS11 RS12 Ratio FT/Std 1 1 1 1 1 1 1 1.96 3.58 9.14 13.21 13.73 17/08/2015 Matti Kalliokoski - 18th BLM Thresholds WG Meeting 7 THRI_B1.2_MQTLH vs THRI.LS.P2_MQTL • • By using MF=1.0, RS09 is ok, FT from RS10? With MF=0.1, RS9 set to 8.94E-04 Gy/s, FT correction from RS08 17/08/2015 Matti Kalliokoski - 18th BLM Thresholds WG Meeting 8
© Copyright 2026 Paperzz