Deliverable documents planned status 1/2 Del. no. Deliverable name WP no. Responsibilit y Reviewer Nature/disse mination Level Delivery date from Annex I (proj month) Delivered Yes/No Actual status Actual / Forecast delivery date 31/07/2013 D1.2 Quality Control Guidelines 1 SES (Cecilia) SES/MAS (Elisab/Jos) R/PP 3 Issue 1 Rejected New draft has been sent to WP1 partner D8.4 Build Secure Embedded Systems with nSHIELD v1 8 MGEP MAS R/PU 12 No Draft on Wiki D1.6 Quality Control Report 1 1 SES (Cecilia) SES/MAS (Elisab/Jos) R/PU 15 No To be started D1.7 Periodic Management Report 1 SES (Cecilia) SES R/PP 18 No Draft on Wiki (waiting for JN contribution) 3 ISD (Dramitinos) SES P,O/RE 18 Yes Waiting for reviewer 3 ISD (Dramitinos) SES R/PU 18 Yes Waiting for reviewer 4 SES (CesenaKresimir) ETH P,O/RE 18 No Available on Wiki 4 SES (CesenaKresimir) ETH R/PU 18 No 5 UNIROMA1 (SuraciFiaschetti) P,O/RE 18 No 5 SES (Morgagni) R/PU 18 No On Wiki (95%) 6 TECNALIA (Inaki) R/CO 18 No Available on Wiki D3.2 D3.3 D4.2 D4.3 D5.2 D5.3 D6.1 Preliminary SPD node technologies prototype Preliminary SPD node technologies prototype report Preliminary SPD network technologies prototype Preliminary SPD network technologies prototype report Preliminary SPD middleware and overlay technologies prototype Preliminary SPD middleware and overlay technologies prototype report Lifecycle and SPD Support Plan 15/07/2013 30/09/2013 30/06/2013 30/9/2013 30/9/2013 31/07/2013 Available on Wiki On Wiki (80%) 31/07/2013 31/07/2013 31/07/2013 UNIROMA1 30/06/2013 Deliverable documents planned status 2/2 Del. no. Deliverable name WP no. D6.2 Prototype validation and verification 6 D6.3 Prototype integration report 6 D7.1 Railways security demonstrator - integration and validation plan 7 D7.2 D7.3 D7.4 Voice/Facial Recognition demonstrator - integration and validation plan Dependable Avionic Systems demonstrator integration and validation plan Social Mobility and Networking integration and validation plan 7 7 7 Responsibility Reviewer SES (Morgagni) HAI (Nikolaos) ASTS (Flammini) MAS (Josef) SES TECNALIA (With SESASTS-ETHMas support) SES 2 Preliminary Exploitation Plan 8 INDRA (VasquezInasi) Build Secure Embedded Systems with nSHIELD v2 8 MGEP (Roberto) Periodic Annual Report 2 1 D2.6 Final System Requirements and Specifications D8.5 D8.6 R/RE 20 R/RE 22 R/CO 22 R/CO 22 R/CO 22 R/CO 22 R/PP 24 R/PU 24 R/PP 24 R/PU 24 SESM SES (Cecilia) D1.8 Delivery date from Annex I (proj month) Delivered Yes/No No MAS Actual status Available on Wiki (30%) No No ETH (Paolo) SES (Traversone Larghi) Nature/dissemi nation Level Actual / Forecast delivery date 31/08/2013 31/08/2013 Available on Wiki 30/06/2013 No 15/07/2013 No 15/07/2013 No What kind of document? No 30/09/2013 No 30/09/2013 No 30/09/2013 No 30/09/2013 Summary and Actions - Participants: Elisabetta Campaiola (SES), Andrea Morgagni(SES), Lucio Marcenaro (Unige), Mariana Esposito (ASTS), Paolo Azzoni (ETH), George Dramitinos (ISD) The first part of the meeting has been held on Webex, the second part continued on teleconference, because Lucio and Paolo were neither able to hear nor to be heard. Action D8.4(M12) and D8.6(M24): Lorena (AT), Elisabetta (SES) and Paolo (ETH) agreed with the opportunity to deliver two separate documents, as in the TA. Cecilia (SES) will ask to Josef (MAS) and Roberto (MGEP) to deliver D8.4 as soon as possible, also if in a preliminary stage. D1.6 Cecilia (SES) will prepare a draft copy of the deliverable D1.6 Elisabetta (SES) and Lorena (SES) will support and review the document D3.2 and D3.3 Cecilia (SES) will ask to M. Cesena (SES) to review the deliverables, before the updating on NEF. D4.2 and D4.3 Paolo (ETH) will be the reviewer for the D4.2 and D4.3 D6.2 and D6.3 The deliverables are on delay because the number of prototypes is higher than expected or previously documented (35 instead 12). The real number of prototypes is one of the results of the meeting of Stockholm. D7.1-D7.2-D7.3 (M22) A common «Table of contests» (partially derived from the D7.1 draft) will be proposed by SES by Friday 28th and then uploaded on Wiki. The same format could be used for the feasibility study. Mariana (ASTS) and Paolo (ETH) will adapt their deliverables to the format proposed by SES D2.6: Elisabetta (SES) and Andrea (SES) told that this deliverable is strictly connected with the D2.2 and that the only activity to be done is asking to each demonstrator leader to verify that the D2.2 includes all the requirements related to each demonstrator and, if is the case, to integrate additional requirements. Consequently the D2.6 leader should just coordinate the activities of each demonstrator leader. They suggested to ask to Inaki to accept the leadership of D2.6 Cecilia will contact Inaki by the middle of the coming week TA Cecilia (SES) will contact Josef (MAS) for T7.4 short description
© Copyright 2026 Paperzz