When rail means service > LIEFKENSHOEK RAIL CONNECTION FINANCIAL CLOSING OF THE PUBLIC PRIVATE PARTNERSHIP 5 November 2008 LUC LALLEMAND CEO CONTENT 1. Infrabel strategy for the port of Antwerp 2. The Liefkenshoek rail connection 3. Public Private Partnership 4. Project company LOCORAIL NV 5. Conclusion & questions 20081105_Liefkenshoek Rail Connection 2 1. INFRABEL STRATEGY FOR THE PORT OF ANTWERP STEP-BY-STEP INFRABEL STRATEGY (I) Infrabel invests heavily in competitive and adapted rail infrastructure in the port of Antwerp according to the strategy of CONCENTRIC CIRCLES: 1st circle: enhance efficiency of freight traffic in the ports ex. rail infrastructure around Deurganck Dock and the Rail Link Liefkenshoek Deurganck Dock Bifurcation Schijn Rail Link Liefkenshoek Second Railway Access 2nd circle: improve access to Belgian ports ex. Ghent Curve, Bifurcation Schijn and Krijgsbaan, Second Railway Access – 3th circle: create new access axes ex. Iron Rhine (complementary to the Ghent Curve Iron Rhine Bifurcation Krijgsbaan Montzen axis) 20081105_Liefkenshoek Rail Connection 3 2. THE LIEFKENSHOEK RAIL CONNECTION SITUATION & DESCRIPTION 16.2 km direct rail connection between: – Antwerp Left Bank (Waasland Port) and – Antwerp Right Bank DOCK CHANNEL CANAL B1-B2 DOCK B1-B2 (shunting yard Antwerp North) Route: – ESCAUT SCHELDT ANVERSANTWERPNORD NORTH Siding South Beveren Tunnel Scheldt FAISCEAUSIDINGSUD SOUTH TUNNEL BEVEREN BEVEREN TUNNEL Channel Dock B1-B2 Antwerp North 20081105_Liefkenshoek Rail Connection 4 2. THE LIEFKENSHOEK RAIL CONNECTION OBJECTIVE Optimal rail connection of the Deurganck Dock AND improvement of the traffic flows in the port of Antwerp Step 1: Deurganck Dock (1st phase: 2004 – 2008 ) (2nd phase: 2008 – horizon 2020 ) – Construction of new tracks and sets of tracks (+/- 153 km extra tracks) – Expansion and modernisation of rail infrastructure on Left Bank Step 2: Liefkenshoek rail connection (2008 – 2014 ) – Faster and more efficient rail traffic between Deurganck Dock and Antwerp North – Avoid detour over busy intersections (Kennedy Tunnel, Berchem) 20081105_Liefkenshoek Rail Connection 5 2. THE LIEFKENSHOEK RAIL CONNECTION STRATEGIC CONNECTION (-) SIMULATION Situation in 2020 WITHOUT the Liefkenshoek rail connection Saturation of the Kennedy Tunnel and the axis Antwerp-Berchem – Antwerp-Schijnpoort Right Bank Left Bank Scheldt Future Liefkenshoek rail connection Antwerp-North 189 trains/day AntwerpSchijnpoort 109 trains/day 20081105_Liefkenshoek Rail Connection 6 2. THE LIEFKENSHOEK RAIL CONNECTION STRATEGIC CONNECTION (+) SIMULATION Situation in 2020 WITH the Liefkenshoek rail connection Difference of approx. 100 trains which no longer have to pass through the Kennedy Tunnel A new impulse for the Deurganck Dock and Antwerp Right Bank! Right Bank Left Bank Scheldt Future Liefkenshoek rail connection 109 trains/day 81 trains/day Antwerp-North AntwerpSchijnpoort 0 trains/day 20081105_Liefkenshoek Rail Connection 7 3. PARTENARIAT PUBLIC-PRIVÉ DESCRIPTION OF PPP Government Infrabel Structured cooperation between Private entity LOCORAIL NV Purpose = financing and accelerated execution of a key project (Liefkenshoek rail connection) creating added value for both parties DBFM agreement (Design, Build, Finance et Maintain) Creative financing mechanism for key mobility project! 20081105_Liefkenshoek Rail Connection 8 3. PUBLIC PRIVATE PARTNERSHIP ADVANTAGES OF PPP Detailed specifications for the design and the construction of the entire project Transparency and optimisation of the costs Public Private Partnership Better compliance with the imposed construction periods and the cost of construction Transfer of risks from the public to the private sector In this case: building risk and availability risk 20081105_Liefkenshoek Rail Connection 9 3. PUBLIC PRIVATE PARTNERSHIP EVOLUTION & TIMING PPP LIAISON FERROVIAIRE LIEFKENSHOEK – 18/04/06 Call for tenders for financing and construction – May '06 – Juin '08 Negotiations and refining of the project during talks with three candidate consortia – 26/05/08 Candidate consortia submit Best and Final Offer (technical aspects) – 19/06/08 Candidate consortia submit Best and Final Offer (financial aspects) – Juin – Oct.‘08 Talks between Infrabel and candidate consortia with best price offer – 06/10/08 Signing of agreements on environmental measures and transfer of ownership of land with Flemish Region and port authorities – 09/10/08 Establishment of LOCORAIL NV – 5/11/08 Contract closing + assignment of construction contract Financial closing of the PPP Liefkenshoek rail connection! 20081105_Liefkenshoek Rail Connection 10 3. PUBLIC PRIVATE PARTNERSHIP PLAN OF THE WORKS – – – – 20/10/08 12/11/08 Mid 2013 2012-2014 – Spring '14 – Mid 2014 20081105_Liefkenshoek Rail Connection Start nature compensation works (Rietveld Kallo) Start construction works Liefkenshoek rail connection End of construction works Works on tracks, signalling infrastructure and overhead wiring (Infrabel) Testing of new rail infrastructure + homologation Putting the Liefkenshoek rail connection into operation 11 3. PUBLIC PRIVATE PARTNERSHIP INVESTMENT LIEFKENSHOEK RAIL CONNECTION Total investment: approx. 765 million (current) euros – Infrabel: approx. 75 million (current) euros (construction of rail infrastructure) – PPS: approx. 690 million (current) euros (CAPEX) • Flemish Region: co-financing of 107 million euros * In annex you'll find a view of the different railway projects and Infrabel investments in and around the Port of Antwerp 20081105_Liefkenshoek Rail Connection 12 4. PROJECT COMPANY LOCORAIL NV PRIVATE INVESTMENT GROUP LOCORAIL NV (I) Includes: CFE NV, VINCI Consession SA, BAM PPP Investments Belgium (actors LOCORAIL) Financing resources provided by 50 % Europese Investeringsbank (EIB) 50 % ING Fortis Banco Santander Société Générale BNG (Bank Nederlandse Gemeenten) Bayerische Landesbank 20081105_Liefkenshoek Rail Connection 13 4. PROJECT COMPANY LOCORAIL NV LOCORAIL NV (II) responsible for financing and construction of the infrastructure (partly civil engineering) responsible for the costs of maintenance of the infrastructure during 38 years putstheinfrastructureatInfrabel’s disposal during this period transfers the ownership of the infrastructure to Infrabel after 38 years (2051) Locorail NV receipts: availability fee of approx. 50 million euros/year from Infrabel during 38 years! 20081105_Liefkenshoek Rail Connection 14 4. PROJECT COMPANY LOCORAIL NV LOCORAIL NV HAS OUTSOURCED CONTRUCTION ACTIVITIES TO CONSTRUCTION CONSORTIUM LOCOBOUW NV (I) THV LOCOBOUW includes: (actors LOCOBOUW) – MBG – VINCI Construction Grands Projets – CEI-De Meyer – Wayss & Freytag THV LOCOBOUW is also responsible for: - the realisation - the maintenance during 38 years 20081105_Liefkenshoek Rail Connection 15 4. PROJECT COMPANY LOCORAIL NV CONSTRUCTION CONSORTIUM THV LOCOBOUW (II) Construction of railway bed from Bundel South to the Beveren railway tunnel (1-3) Construction of two single-track bored tunnels under the Scheldt and channel dock B1-B2 (5-6) Renovation and adaptation of the existing Beveren Tunnel (3-4) Construction of an access tunnel between the Beveren railway tunnel and the tunnels to be bored (4-5) 20081105_Liefkenshoek Rail Connection Construction of closed tunnel construction and open access ramp on Right Bank (6-7) Adaptation of existing railway tunnel under the R2 (7) 16 5. CONCLUSIE CONCLUSION The Liefkenshoek rail link is the 2nd successful PPP project for Infrabel (* Diabolo and Liefkenshoek rail link projects) The investment world places tremendous trust in Infrabel The private sector is injecting around 1 billion euros* into our railway infrastructure 20081105_Liefkenshoek Rail Connection 17 QUESTIONS?
© Copyright 2026 Paperzz