£85k £500k £120k DECC funding for heat mapping and renewable heat feasability studies asterpla Low-emission transport (electric vehicle charging network) EHDC commitment 307 assessments £ Funding £3.3m t Hamps hire These op demand portunities are presente data in Figure 6.2 App d in Figure 6. 1 below Figure 6. endix A 1 Key op . These . portu ar ed eig ble heat i f i t n e a Id renew ed to three r o f s e ow sit s, nar r ies e m e h tud sc bility s i s a e f by delivering he at networ ks in East Hampshir e also pr e 5 ground source heat pumps 7 solar photovoltaics Low carbon Penns Place 80 external 5 cavity wall 50+ more efficient wall insulation boilers insulation To do list 2016/17 esented Renewable heat Electric vehicle charging network Energy services company Community energy Solar Woodfuel East Hampshire Energy Strategy The first 12 months (2015/16) A heat m predicte asterplan has be d of the de energy deman en developed fo d mand pr ofile that assessment ha r each opportun 6.2.5 s ity each pr The met oject of been undertak area. W ithin hodology fers for en to un each m Appen the deliv asterpla de for unde dix C . er n rt y of a he rtake the size ak ing the A Red, criteria and natu a at netw pr A set out ork. re in Secti mber, Green (R edicted energy D on 6.2 and inco AG) analysis demand model has lin rporated in the he been provided g is provided in at maste ag rplans pr ainst each of \\pba.in th ovided t\cbh\P in Appen e rojects\ 34707 EH dix DC Heat M apping\R eports\F inal Com plete\ 25-50 2013 2014 2015 88 84 84 100 would be typical 101-125 Electricity 80 60 2013 2014 Two EHDC vehicles are being replaced by plug-in electric vehicles The five key objectives: 34707 15 0908 Renewable energy generation Heat M asterpla n for Ea st Ham Planning Heat Energy efficiency requirements now included in planning policy for new developments 126-150 Over 150 3 Energy use at Penns Place kWh/yr/m² 100 2015 with he at Sports and leisure centres 6.2.4 0-25 76-100 n for Eas nities for Domestic retrofit (Green Deal / Cosy EH) 51-75 6.2.3 177 properties improved through scheme 130 in the pipeline £2.61m A B C D E F G p ential a m t a He ht pot Heat M pshire_F INAL.doc x 24 tudies ility s b i s a e F options for sp Reduced energy use Reduced heat demand or ts and l eisur Community energy workshop e cen Attended by 18 people from 7 community organisations The first four electric vehicle charge points commissioned in Petersfield Commercial provision ewable heat looking at ren Green economy tres
© Copyright 2026 Paperzz