Virtual World Asset Management – The Journey So Far NIA SPEN 0002 VWAM Project Introduction Virtual World Asset Management Key Outputs Year 1 Updated Benefits Case Year 2 Programme Integrating VWAM into existing corporate systems & policies www.spenergynetworks.co.uk LCNI 2016 Virtual World Asset Management - Introduction Project Funded by NIA LCNI 2016 Virtual World Asset Management - Introduction Register April 2015 and expected to last 34 months ~ £3.5M Primary objective is to quantify the benefits of using VWAM compared to conventional programmes Key aim is to reduce costs and improve network resilience through the development of 3D virtual Model. (Network Innovation Allowance) www.spenergynetworks.co.uk Developed by Ergon Energy to capture and efficiently process the OHL network across its Australian Distribution Network Raw Data ~30% of network 2 x Data Capture (2015 & 2016) Original aim to deliver a Virtual World of North Wales and Dumfries districts OHL network www.spenergynetworks.co.uk LCNI 2016 ROAMES – Remote Observation - Automated Modelling - Economic Solution www.spenergynetworks.co.uk LCNI 2016 Virtual World Asset Management – Year 1 Key Outputs Virtual World Asset Management – Year 1 Key Challenges Prove ROAMES OHL Capture Completeness Asset Matching Accuracy Identification of New Asset Information Identification of Areas for Improvement Identification of Benefits Case for BaU Adoption Year 2 www.spenergynetworks.co.uk LCNI 2016 www.spenergynetworks.co.uk LCNI 2016 1 Virtual World Asset Management – Year 1 Key Outputs Good accuracy of network modelled for higher voltages Virtual World Asset Management – Year 1 Key Outputs Less accurate at lower voltages 132kV 33kV 11kV LV Main LV Service SPEN (km) 643 1,211 8,241 2,511 979 ROAMES (km) 649 1,211 8,278 2,459 257 Accuracy ~100% ~100% ~100% ~98% ~26% www.spenergynetworks.co.uk Pole location verified using Camera Imagery layer ‘H’ and ‘Steel Tower’ poles counted as two separate assets Errors in pole location with internal records Different network topography Improved QA process required www.spenergynetworks.co.uk LCNI 2016 Virtual World Asset Management – ROAMES VWAM LiDAR High accuracy for Higher Voltages Low accuracy for LV Services High confidence in the ability to model network High confidence in the overall accuracy of VWAM Virtual World Asset Management – Year 1 Key Outputs SP Energy Networks OHL Network is in good shape – low levels of defects identified Internal GIS pole locations Improved QA process required Several benefits identified Conclusion from Year 1 Errors in LiDAR data which need to be improved to allow for BaU adoption Improved QA process required Currently not an option for the 100% detection of LV Service Wire Vegetation Management Intrusions linked to SPEN data Categorised intrusions ETR 132 Data easy to interrogate Year 1 Findings 100+ raster layers in Google Earth Easy and simple to use www.spenergynetworks.co.uk Spans with Vegetation Clear Spans 40% ~ 5m 15% ~ 3m www.spenergynetworks.co.uk www.spenergynetworks.co.uk LCNI 2016 LCNI 2016 Virtual World Asset Management – Year 1 Key Outputs Virtual World Asset Management – Year 1 Key Outputs Dumfries LCNI 2016 Can LiDAR be used for to predict when vegetation management is required? North Wales Spans with Vegetation LiDAR Clear Spans 70% ~ 5m 17% ~ 3m LCNI 2016 Detailed and accurate 3D model Vegetation intrusions Audit tool Safety issues highlighted Multiple flights ay be required Reviewed past learning Internal knowledge Alternative contracts investigated Annual growth will not always reduce clearance SPEN www.spenergynetworks.co.uk Year 1 Year 2 Year 3 Year 4 LCNI 2016 2 Virtual World Asset Management – Vegetation Management VWAM LiDAR High levels of accuracy detecting intrusions Analytic spreadsheets provide fast and effective way to audit circuits High confidence in the ability to model and visually show intrusions SP Energy Networks Vegetation impact the networks to a greater extent in SPM Cost per SPAN contract rates is unlikely to achieve savings and may lead to increased cost Effective audit tool Year 1 Findings Virtual World Asset Management – Year 1 Key Outputs ESQCR Programmes Conclusion from Year 1 Limited benefit pursuing growth rates in the context of this project VWAM unlikely to determine tree species or localised factors Will not remove the need to complete onsite survey Unlikely that Growth Rates will be determined in the short term www.spenergynetworks.co.uk Identification of safety issues Pole lean link to SPEN assets Low Ground Clearance Road Crossings Data easy to interrogate Resources sent to site with tools www.spenergynetworks.co.uk LCNI 2016 LCNI 2016 Virtual World Asset Management – Year 1 Key Outputs Virtual World Asset Management – Year 1 Key Outputs Line Heightsmeasures ground clearance Accurately VWAM Examples Data Network in general performing well Botwnnog Primary, MW 83601 Will not be able to completely replace manual ESQCR inspections Line Heights / Pole Lean Linked to SPEN ID Reference Easy to identify in analytics Easy to verify in Google Earth Leaning Poles Attachment heights Safety issues highlighted Road or critical crossing heights Single Point in time survey Network conditions www.spenergynetworks.co.uk Poorly performing circuit with multiple transient faults recorded during first half of year LCNI 2016 Virtual World Asset Management – ESQCR Programmes www.spenergynetworks.co.uk LCNI 2016 Virtual World Asset Management – Benefits Case VWAM LiDAR Provides a detailed and accurate ‘network MOT’ Will not replace manual inspections High confidence in measurement reported Will provides greater knowledge on how assets change over time Soft Benefits Operations Connections Wayleaves Vegetation Management SP Energy Networks Single point in time survey Important to ensure internal policy are in place to mitigate volume of data Network is generally in a good shape Conclusion from Year 1 Improved QA process required to removed LiDAR errors Improvements in LV Service Wires required to identify all network issues Further improvement required for automatic road crossing heights Future proposed developments will enhance the solution www.spenergynetworks.co.uk Year 1 Findings LCNI 2016 Hard Benefits Improved Fault Performance Inspection Policy Annual Biennial 3 year www.spenergynetworks.co.uk 4 year 6 year 8 year LCNI 2016 3 Virtual World Asset Management – Benefits Case Virtual World Asset Management – Year 2 Variation Why? Proposed Flight Plan • • • • 3 year cycle covering equal network length Growth rates Requirement to collect 100% asset base from one flight Limited additional learning Regional network topography difference What Changed? • • • Line Heights Vegetation and Construction work audit Connections Improved data and location accuracy Work prioritisation Flying different areas of similar size Using different flight patterns and improved QA process Networks coverage rather than districts What’s the aim? • • • www.spenergynetworks.co.uk LCNI 2016 Expected improvements www.spenergynetworks.co.uk www.spenergynetworks.co.uk LCNI 2016 Virtual World Asset Management Virtual World Asset Management – Year 2 To validate the changes and determine whether it will be possible to gather 100% network coverage Establish whether VWAM can cope with varying network topography Spread learning across multiple work centres to ensure business buy in and smoother integration into BaU For further information please contact Improve conductor capture Improve pole matching H poles Poles on wrong side of road or boundary ETR132 compliance – model and heat map of circuits [email protected] LCNI 2016 www.spenergynetworks.co.uk LCNI 2016 4
© Copyright 2026 Paperzz