1146 IP's 362 IP's 77 ENLARGED DETAIL ENLARGED DETAIL B D ENLARGED DETAIL 2874 2874 65 9 15 5 219 88 1 10 54 2874 SHOP FIXED TO REAR CHUTE PLATES "WELD WASHER" METHOD 3352 IP's 2292 IP's 88 811 IP's 12 99 21 0 10 8 466 634 509 4 30° 1 087-M-2874 STANDARD DOMITE WEAR BARS 4 146 432 69 SECTION CONV P1/P2 TRANSFER UPGRADE TRANSFER CUTE ARRANGEMENT K ENLARGED DETAIL J 6 FL G H 3 ENLARGED DETAIL G 12 56 L No ISSUED FOR APPROVAL DATE REVISIONS H&B DRN E.H. E.H. CHECKED G.B. CHD APP No DATE REVISIONS DRN CHD APP CONV P1 / P2 TRANSFER UPGRADE 087-M-2873 CONV. P1 HEADCHUTE ARRG'T SHT 3. H and B CONV P1 / P2 TRANSFER UPGRADE 087-M-2872 CONV. P1 HEADCHUTE ARRG'T SHT 2. CONV P1 / P2 TRANSFER UPGRADE087-M-2871 ARRG'T SHT 1. MINING SERVICES CONV. P1 HEADCHUTE M - P.O. BOX 1324 WANGARA W.A.6065 TEL:(09)306 1662 TITLE CLIENT PROJECT BHP BILLITON PORT ORE HANDLING CONVEYORS DOC. NO. REFERENCE DOCUMENTS H&B DRAWING TITLE AP FOR CONST G.B. 10 ENLARGED DETAIL 1:20 DRAWN CONV P1 / P2 TRANSFER UPGRADE 087-M-2876 G.A. OF P2 TAIL END 6 10 PROJECT APP. A CONV P1 / P2 TRANSFER UPGRADE 087-M-2880 ARRANGEMENT OF DUST HOODS 54 10 DESIGN CHECK G.B. CONV P1 / P2 TRANSFER UPGRADE 087-M-2911 SITEWORK & ERECTION PROCEDURE CONV P1 / P2 TRANSFER UPGRADE 087-M-2879 ARRANGEMENT OF SKIRTS - DESIGNED E.H. PL AT E ENLARGED DETAIL SCALE ISSUED FOR CONSTRUCTION H&B CH UT E 2874 2874 087-M-2877 007-M-0173 32 32 TH K 087-M-2881 STANDARD INSPECTION DOORS 6 43 10 0 0 1 ENLARGED DETAIL 65 17 6 087-M-2874 CONV P1/P2 TRANSFER UPGRADE P1 HEAD END MARKING PLAN 88 IP's 17 10 17 43 36 54 88 IP's FL G 17 7° 3 2 2874 0 10 36 10 CHUTE PLATE 20 s P' 7I 0 3 2 GE M FLAN 0 BOTTO 1 3 s P' 9I 0 3 2 303 I P' s E UT CH ATE HUTE PL 0C 1 3 9 10 E AT PL ANGE L 0F 1 B.H.P. IRON ORE STANDARD DOMITE WEAR BARS SHOP BOLTED TO CHUTE WALLS WITH M20 GR 8.8 BOLTS DOMITE BARS TYPE DLP201A U.N.O. P 6 2 000-M-0227 SHT1 - - SECTION 1111 IP's ENLARGED DETAIL 11 3352 IP's 0 1 20 CONJUNCTION WITH DRG No:PL AT E 10 CHUTE PLATE 1113 I/S 10 2874 2874 REFERENCE DRAWING TITLE THIS DRAWING TO BE READ IN CH UT E CONV P1/P2 TRANSFER UPGRADE P2 TAIL END MARKING PLAN SECTION 45 E 0 FLANG 1 10 77 ° 1 9 1 21 281 11 N 20 323 20303 I P' s 972 IP's 45 PLATE 20 VEE 3/DLP369 DLP201A 509 410 I P' s 12 1500 468 I P' s 1609 I P' s s P' I 649 1 LT 641P 1 P 1630 I P' s 466 509 1609 I P' s 509 77 ° DLP343 ERECTION NOTES DLP337 - 7 ENLARGED DETAIL 1. FOR GENERAL NOTES REFER TO DRAWING N° 087-M-2874 DLP343 ° 55 DLP125 88 2874 9 GENERAL NOTES: 1. FOR GENERAL NOTES REFER TO DRAWING N° 087-M-2874 - 12 THICK ULTRA HIGH MOLECULAR POLYETHYLENE LINERS 8 6 60 B.H.P. IRON ORE STANDARD DOMITE WEAR BARS-SHOP BOLTED TO 439 IP's CHUTE WITH M20 GR 8.8 BOLTS DLP337 10 CHUTE PLATE N - DOMITE BARS TYPE DLP201A U.N.O. 2380 IP's 5 3 ENLARGED DETAIL 1552 IP's 964 IP's 1113 IP's DLP125 2 6 2874 DLP125 DLP337 SHOP FIXED TO REAR CHUTE PLATES "WELD WASHER" METHOD 1609 I P' s 1109 SECTION 7 2874 BAR MARKS & LOCATION SEE DRAWING 087-M-2902 & 2904. 50 DLP343 5 500 77 ° 380 IP's SECTION DLP343 2874 35 FF DI M' s AT STI 466 509 759 IP's B.H.P. IRON ORE STANDARD DOMITE WEAR BARS SHOP BOLTED TO CHUTE WALLS WITH M20 GR 8.8 BOLTS FOR WEAR DLP343 - E PLAT UTE 0 CH 1 3 2874 59 I P' s 380 THESE LINES REPRESENT B.H.P. STANDARD DOMITE WEAR BARS FOR LOCATION & DETAILS SEE DRAWINGS 087-M-2902 & 2903 STIFF AT BTM FLANGE WHEN INTERFERS WITH FLANGE HOLES 1 SECTION 21 0 362 IP's - 509 509 22 0 20 0 SECTIONAL PLAN 12 THICK ULTRA HIGH MOLECULAR POLYETHYLENE LINERS TYPICAL ENLARGED DETAIL OF VARI ES 625 1623 303 476 VARI ES 4 ON 107 1004 466 20 5 ST I FF 31 5 VE I W TOP FLANGE I.P. LINES AND WORK POINTS 1609 I P' s 20 5 66 60 > 68 19 5 14 6 43 9 44 W.P. 84 4 I P' s 509 19 5 C - ° 55 M 579 19 5 90x10 STIFF B - s AT STI FF 91 8 DI M' 60 14 7 19 5 98 6 20 5 W.P. FOR WEAR BAR MARKS & LOCATION SEE DRAWING 087-M-2904 65 ° 44 14 0 20 5 111 3 235 111 3 W.P. B.H.P. IRON ORE STANDARD DOMITE WEAR BARS SHOP BOLTED TO CHUTE WALLS WITH M20 GR 8.8 BOLTS BAR MARKS & LOCATION SEE DRAWING 087-M-2902 & 2903 55 28 75 ST I FF 93 5 > VEE PLATE & ADJUSTABLE LINERS OMITTED FOR CLARITY 30 60 B.H.P. IRON ORE STANDARD DOMITE WEAR BARS SHOP BOLTED TO CHUTE WALLS WITH M20 GR 8.8 BOLTS FOR WEAR 1609 I P' s L - W.P. W.P. W.P. - 7° F 2874 10 77 W.P. DRG NUMBER ENLARGED DETAIL E 2874 90 W.P. SECTION 811 IP's 45 ENLARGED DETAIL C 2874 12 45 5 ENLARGED DETAIL A 2874 ST I FF 10 THK CHUTE PLATE 10 FLG 10 FLG > ST I FF 1173 6 6 - ST I FF > W.P. A 41 49 10 114 6 11 66 0 > 55 5 964 1199 ST I FF 1609 I P' s > 40 6 8 66 0 W.P. 50 1609 I P' s 5 8 10 FLANGE 45 1609 I P' s 30 54 9 1609 I P' s 259 6 1111 760 IP's 759 IP's 88 2033 10 FLANGE 1370 A1 SHEETINIT. SIGN. DATE HB11 CLIENT DRG No. 007-M-2875/0 CONVEYOR P1 / P2 TRANSFER UPGRADE H & B DRG No. TRANSFER CHUTE ARRANGEMENT- SHEET 2 REV 0 Head Office 7 Tahiti Lane, Hillarys, Perth, Western Australia Phone: (08) 9403 2993 Email: [email protected] www.handbmining.com.au H & B Mining: “The Experts in Conveyor Skirts” H & B Mining design and supply a range of “Easy Maintenance” conveyor transfer products to the Australian mining industry with the aim of providing a safer, easier to maintain and more efficient working environment at conveyor transfer points. H & B Mining was established in April 1993 with the promise of providing a standalone conveyor design service tailored to accommodate the mines of Australia. After witnessing maintenance crews struggling to maintain and change out poorly designed products for conveyor transfers H & B decided to expand its portfolio by developing its own range of ‘Easy Maintenance Products’ for conveyor transfer points including: conveyor idlers, conveyor skirting systems, hinged dust covers, conveyor guards, conveyor diversion plough, streamline conveyor transfer design and the retractable loading boot. The “Easy Maintenance” conveyor product range harnesses H & B’s vast experience in the field along with the innovative design technology nurtured over the years within the H & B design team. The Australian mining industry has benefited from H & B’s toil, witnessing enhanced overall productivity, reduced shutdown time and improved safety whilst gaining cost effective mining conveyor operations. H & B Mining products have been installed as mine standard by Rio Tinto, BHP Billiton, Roy Hill and FMG, amongst others. H & B Mining has an in-house design team specialising in materials handling projects for new and/or existing mines. The design work produced by H & B Mining incorporates mechanical, structural and civil engineering along with drafting at competitive rates.H & B’s in-house design team have collaborated over the years and collectively contributed to the development of the easy maintenance product range. The team specialises in conveyor transfer upgrades and materials handling projects but have also handled numerous structural, mechanical and civil projects over the years. Whilst being able to offer a service where design work can be tailored to suit each clients needs, H & B can also offer their innovative development service.H & B have helped clients develop new designs to incorporate safe and simple operation and maintenance procedures to suit the clients required applications and on site conditions. H & B’s team are continuously reviewing existing designs that are regarded as standards in the Australian mining industry, and exploring ways to improve, simplify and make a safer working environment for all maintenance teams.
© Copyright 2026 Paperzz