ERECTION NOTES GENERAL NOTES

1146 IP's
362 IP's
77
ENLARGED DETAIL
ENLARGED DETAIL
B
D
ENLARGED DETAIL
2874
2874
65
9
15
5
219
88
1
10
54
2874
SHOP FIXED TO REAR CHUTE PLATES "WELD WASHER" METHOD
3352 IP's
2292 IP's
88
811 IP's
12
99
21
0
10
8
466
634
509
4
30°
1
087-M-2874
STANDARD DOMITE WEAR BARS
4
146
432
69
SECTION
CONV P1/P2 TRANSFER UPGRADE
TRANSFER CUTE ARRANGEMENT
K
ENLARGED DETAIL
J
6
FL
G
H
3
ENLARGED DETAIL
G
12
56
L
No
ISSUED FOR APPROVAL
DATE
REVISIONS
H&B
DRN
E.H.
E.H.
CHECKED
G.B.
CHD
APP
No
DATE
REVISIONS
DRN
CHD
APP
CONV P1 / P2 TRANSFER UPGRADE
087-M-2873
CONV. P1 HEADCHUTE ARRG'T SHT 3.
H and B
CONV P1 / P2 TRANSFER UPGRADE
087-M-2872
CONV. P1 HEADCHUTE ARRG'T SHT 2.
CONV P1 / P2 TRANSFER UPGRADE087-M-2871
ARRG'T SHT 1.
MINING SERVICES
CONV. P1 HEADCHUTE
M
-
P.O. BOX 1324
WANGARA
W.A.6065
TEL:(09)306 1662
TITLE
CLIENT
PROJECT
BHP BILLITON
PORT ORE HANDLING
CONVEYORS
DOC. NO.
REFERENCE DOCUMENTS
H&B
DRAWING TITLE
AP FOR CONST
G.B.
10
ENLARGED DETAIL
1:20
DRAWN
CONV P1 / P2 TRANSFER UPGRADE
087-M-2876
G.A. OF P2 TAIL END
6
10
PROJECT APP.
A
CONV P1 / P2 TRANSFER UPGRADE
087-M-2880
ARRANGEMENT OF DUST HOODS
54
10
DESIGN CHECK
G.B.
CONV P1 / P2 TRANSFER UPGRADE
087-M-2911
SITEWORK & ERECTION PROCEDURE
CONV P1 / P2 TRANSFER UPGRADE
087-M-2879
ARRANGEMENT OF SKIRTS
-
DESIGNED
E.H.
PL
AT
E
ENLARGED DETAIL
SCALE
ISSUED FOR CONSTRUCTION H&B
CH
UT
E
2874
2874
087-M-2877
007-M-0173
32
32
TH
K
087-M-2881
STANDARD INSPECTION DOORS
6
43
10
0
0
1
ENLARGED DETAIL
65 17
6
087-M-2874
CONV P1/P2 TRANSFER UPGRADE
P1 HEAD END MARKING PLAN
88 IP's
17
10
17
43
36
54
88 IP's
FL
G
17
7°
3
2
2874
0
10
36
10 CHUTE PLATE
20
s
P'
7I
0
3
2
GE
M FLAN
0 BOTTO
1
3
s
P'
9I
0
3
2
303 I
P'
s
E
UT
CH
ATE
HUTE PL
0C
1
3
9
10
E
AT
PL
ANGE
L
0F
1
B.H.P. IRON ORE STANDARD DOMITE WEAR BARS
SHOP BOLTED TO CHUTE WALLS WITH M20 GR 8.8 BOLTS
DOMITE BARS TYPE DLP201A U.N.O.
P
6
2
000-M-0227
SHT1
-
-
SECTION
1111 IP's
ENLARGED DETAIL
11
3352 IP's
0
1
20
CONJUNCTION WITH DRG No:PL
AT
E
10 CHUTE PLATE
1113 I/S
10
2874
2874
REFERENCE DRAWING TITLE
THIS DRAWING TO BE READ IN
CH
UT
E
CONV P1/P2 TRANSFER UPGRADE
P2 TAIL END MARKING PLAN
SECTION
45
E
0 FLANG
1
10
77
°
1
9
1
21
281 11
N
20
323
20303 I
P'
s
972 IP's
45
PLATE
20 VEE
3/DLP369
DLP201A
509
410 I
P'
s
12
1500
468 I
P'
s
1609 I
P'
s
s
P'
I
649
1
LT
641P
1
P
1630 I
P'
s
466
509
1609 I
P'
s
509
77
°
DLP343
ERECTION NOTES
DLP337
-
7
ENLARGED DETAIL
1. FOR GENERAL NOTES REFER TO DRAWING N° 087-M-2874
DLP343
°
55
DLP125
88
2874
9
GENERAL NOTES:
1. FOR GENERAL NOTES REFER TO DRAWING N° 087-M-2874
-
12 THICK ULTRA HIGH MOLECULAR POLYETHYLENE LINERS
8
6
60
B.H.P. IRON ORE STANDARD DOMITE
WEAR BARS-SHOP BOLTED TO
439 IP's
CHUTE WITH M20 GR 8.8 BOLTS
DLP337
10 CHUTE PLATE
N
-
DOMITE BARS TYPE DLP201A U.N.O.
2380 IP's
5
3
ENLARGED DETAIL
1552 IP's
964 IP's
1113 IP's
DLP125
2
6
2874
DLP125
DLP337
SHOP FIXED TO REAR CHUTE PLATES "WELD WASHER" METHOD
1609 I
P'
s
1109
SECTION
7
2874
BAR MARKS & LOCATION SEE DRAWING 087-M-2902 & 2904.
50
DLP343
5
500
77
°
380 IP's
SECTION
DLP343
2874
35
FF
DI
M'
s AT STI
466
509
759 IP's
B.H.P. IRON ORE STANDARD DOMITE WEAR BARS SHOP
BOLTED TO CHUTE WALLS WITH M20 GR 8.8 BOLTS FOR WEAR
DLP343
-
E
PLAT
UTE
0 CH
1
3
2874
59
I
P'
s
380
THESE LINES REPRESENT B.H.P. STANDARD DOMITE WEAR BARS
FOR LOCATION & DETAILS SEE DRAWINGS 087-M-2902 & 2903
STIFF AT BTM FLANGE WHEN
INTERFERS WITH FLANGE HOLES
1
SECTION
21
0
362 IP's
-
509
509
22
0
20
0
SECTIONAL PLAN
12 THICK ULTRA HIGH MOLECULAR POLYETHYLENE LINERS
TYPICAL ENLARGED DETAIL OF
VARI
ES
625
1623
303
476
VARI
ES
4
ON
107
1004
466
20
5
ST
I
FF
31
5
VE
I
W
TOP FLANGE I.P. LINES
AND WORK POINTS
1609 I
P'
s
20
5
66
60
>
68
19
5
14
6
43
9
44
W.P.
84
4
I
P'
s
509
19
5
C
-
°
55
M
579
19
5
90x10 STIFF
B
-
s AT STI
FF
91
8 DI
M'
60
14
7
19
5
98
6
20
5
W.P.
FOR WEAR BAR MARKS & LOCATION SEE DRAWING 087-M-2904
65
°
44
14
0
20
5
111
3
235
111
3
W.P.
B.H.P. IRON ORE STANDARD DOMITE WEAR BARS
SHOP BOLTED TO CHUTE WALLS WITH M20 GR 8.8 BOLTS
BAR MARKS & LOCATION SEE DRAWING 087-M-2902 & 2903
55
28
75
ST
I
FF
93
5
>
VEE PLATE & ADJUSTABLE LINERS
OMITTED FOR CLARITY
30
60
B.H.P. IRON ORE STANDARD DOMITE WEAR BARS
SHOP BOLTED TO CHUTE WALLS WITH M20 GR 8.8 BOLTS FOR WEAR
1609 I
P'
s
L
-
W.P.
W.P.
W.P.
-
7°
F
2874
10
77
W.P.
DRG NUMBER
ENLARGED DETAIL
E
2874
90
W.P.
SECTION
811 IP's
45
ENLARGED DETAIL
C
2874
12
45
5
ENLARGED DETAIL
A
2874
ST
I
FF
10 THK CHUTE PLATE 10 FLG 10 FLG
>
ST
I
FF
1173
6
6
-
ST
I
FF
>
W.P.
A
41 49
10
114
6
11
66
0
>
55
5
964
1199
ST
I
FF
1609 I
P'
s
>
40
6
8
66
0
W.P.
50
1609 I
P'
s
5
8
10 FLANGE
45
1609 I
P'
s
30
54
9
1609 I
P'
s
259
6
1111
760 IP's
759 IP's
88
2033
10 FLANGE
1370
A1 SHEETINIT.
SIGN.
DATE
HB11
CLIENT DRG No.
007-M-2875/0
CONVEYOR P1 / P2 TRANSFER UPGRADE H & B DRG No.
TRANSFER CHUTE ARRANGEMENT- SHEET 2
REV
0
Head Office
7 Tahiti Lane, Hillarys, Perth,
Western Australia
Phone: (08) 9403 2993
Email: [email protected]
www.handbmining.com.au
H & B Mining: “The Experts in Conveyor Skirts”
H & B Mining design and supply a range of “Easy Maintenance” conveyor transfer products to the Australian
mining industry with the aim of providing a safer, easier to maintain and more efficient working environment
at conveyor transfer points.
H & B Mining was established in April 1993 with the promise of providing a standalone conveyor design
service tailored to accommodate the mines of Australia. After witnessing maintenance crews struggling to
maintain and change out poorly designed products for conveyor transfers H & B decided to expand its
portfolio by developing its own range of ‘Easy Maintenance Products’ for conveyor transfer points including:
conveyor idlers, conveyor skirting systems, hinged dust covers, conveyor guards, conveyor diversion
plough, streamline conveyor transfer design and the retractable loading boot.
The “Easy Maintenance” conveyor product range harnesses H & B’s vast experience in the field along with
the innovative design technology nurtured over the years within the H & B design team. The Australian
mining industry has benefited from H & B’s toil, witnessing enhanced overall productivity, reduced shutdown
time and improved safety whilst gaining cost effective mining conveyor operations. H & B Mining products
have been installed as mine standard by Rio Tinto, BHP Billiton, Roy Hill and FMG, amongst others.
H & B Mining has an in-house design team specialising in materials handling projects for new and/or existing
mines. The design work produced by H & B Mining incorporates mechanical, structural and civil engineering
along with drafting at competitive rates.H & B’s in-house design team have collaborated over the years and
collectively contributed to the development of the easy maintenance product range. The team specialises in
conveyor transfer upgrades and materials handling projects but have also handled numerous structural,
mechanical and civil projects over the years. Whilst being able to offer a service where design work can be
tailored to suit each clients needs, H & B can also offer their innovative development service.H & B have helped
clients develop new designs to incorporate safe and simple operation and maintenance procedures to suit the
clients required applications and on site conditions. H & B’s team are continuously reviewing existing designs that
are regarded as standards in the Australian mining industry, and exploring ways to improve, simplify and make a
safer working environment for all maintenance teams.