slideshow from the CFLRP field trips in July 2013 in PowerPoint

Landscape Restoration Team Field Trips:
July 9, 2013: Red Feather Lakes area
July 11, 2013: Rampart Range area
We very much thank the organizers
of the field trips, Dick Edwards on
the AR and Jeff Underhill on the
Pike, and all of their staff members
who contributed their time and
expertise on the various projects.
Both field trips were very
informative for understanding
treatment histories and objectives.
The first stop on the AR, Red Feather 1 Unit 16 (just off the Lady Moon trailhead).
The first stop on the AR, Red Feather 1 Unit 16 (this is also where
the first picture of this slide show was taken).
Red Feather 2; active restoration site
Front Range Forest Reconstruction Network, Red Feather 58 - South
The group at the first stop on the Pike, Messenger Gulch post-treatment site.
Messenger Gulch post-treatment; note that this was a leave-tree marking.
Pike, near Messenger Gulch in older treatment.
The last stop on the Pike, Catamount 1 post-treatment.
Note the large openings and landscape context of treatments between ridges.
The group on the second trip to the Pike.