C shower enclosure PlayTime walk-in shower www.bathstore.com Any queries? Call: 0121 553 5777 51000030700/10/20 51000030730 51000030740 51000030750 51000030760 SET 01 1x 1x* 1x 1x - SET 02 1x 2x* 2x - SET 03 1x 1x 1x SET 04 1x 2x SOL099 SOL402 (4x) SOL664 (3mm) SOL226 (3x) SOL651 (4x) SOL227 (6x) SOL653 (5x) SOL518 (4x) SOL501 (4x) SOL098 (3x) SOL501 (5x) SOL092 SOL098 SOL651 SOL653 (3x) SOL097 SOL096 SOL062 SOL101 (100cm) SOL102 (120cm) SOL103 (140cm) SOL110 SOL501 (4x) SOL061 SOL091 SOL064 SOL661 SOL664 (4mm) (3mm) 51000030700/10/20 51000030730 51000030740 51000030750 51000030760 SET 01 + side screen* (p. 4 - 7) SET 02 + side screen* (p. 8 - 11) Select your shower configuration and proceed to the corresponding pages of this manual. Check the table on the left for the required packaging units. * With SET 01 en SET 02 the side screen is optional. 64 ) SET 03 (p. 12 - 15) Max. 275cm 98 Max. 275cm 18 SET 04 (p. 16 - 19) SET 01 + Side screen* 1a SOL061 2cm 90 /1 00 0/ cm 10 1 / 20 0cm 14 1b SOL061 ma x. 1 2 00 cm 3 Ø6mm (4x) SOL501 (4x) 4 SOL651 (4x) Th scr 4 5 800mm (100cm) 1000mm (120cm) 1200mm (140cm) SOL501 Ø6mm 2050mm cm 6 7 SOL096 m 0m 20 m 0m 20 SOL227 SOL651 8 SOL227 The rubber pads SOL227 may be stacked to level the screen and overcome irregularities of the (tiled) floor. SOL062 SOL101 (100cm) SOL102 (120cm) SOL103 (140cm) 5 10 9 15 Ø3,5mm (4x) SOL402 (4x) 25mm (* 32mm) 12 11 L - 5mm L SOL092 14 13 SOL664 (3mm) SOL092 SOL099 6 * SOL661 (4mm) * 16 15 IMPORTANT: Silicone must be applied to both sides of the screen as it will be the sole means of fixation to the floor. * + Side screen *18 *17 SOL110 SOL227 250m m *19 *20 7 SET 02 + Side screen* 1a SOL227 0/ 10 / 20 1 0cm 14 m 0m 90 20 /1 00 cm m 0m 20 The scr 1b SOL227 0/ 10 / 20 1 0cm 14 20 x. 1 00 cm m 0m 20 When installing directly on to the bathroom floor there are two possibilities: 1b. Placement on the rubber pads SOL227. Silicone has to be applied to the bottom edge with this option. 1c. Placement on blocks SOL098. The bottom edge of the screen will not be sealed off (steps 10 & 11 are cancelled). A gap will remain between the floor and the screen. 8 NOTE: The blocks SOL098 are mounted to the floor with screws. In case of floor heating we strongly advise against this installation option. 1c 0/ 10 ma m 0m ma x. 1 1 / 20 0cm 14 00 cm m 0m 20 m 0m 20 2x SOL501 (2x) SOL226 SOL653 Ø6mm (2x) SOL098 2 m 200m m 200m 2050mm m SOL227 The rubber pads SOL227 may be stacked to level the screen and overcome irregularities of the (tiled) floor. 3 4 SOL501 (2x) Ø6mm (2x) m SOL651 (2x) 6 5 L - 5mm m 98 L SOL092 (2x) 9 8 7 SOL092 (2x) SOL099 (2x) SOL101 (100cm) SOL102 (120cm) SOL103 (140cm) 9 * 10 *1 IMPORTANT: Silicone must be applied to both sides of the screen as it will be the sole means of fixation to the floor. *1 SOL664 (3mm) SOL661 (4mm) 11 10 * + Side screen *12b SOL226 2x SOL653 *12a Ø6mm (2x) SOL098 SOL501 (2x) SOL227 250m 250m m m *13 *14 SOL110 (2x) *15 11 1a SET 03 SOL061 2cm Max. 275cm 90 /1 00 0/ cm 10 1 / 20 1b SOL061 ma x. 1 2 3 Ø6mm (4x) SOL501 (4x) 12 SOL651 (4x) 00 cm 0cm 14 4 m 0m 20 m 0m 20 SOL227 SOL227 cm The rubber pads SOL227 may be stacked to level the screen and overcome irregularities of the (tiled) floor. 5 6 SOL062 7 SOL101 (100cm) SOL102 (120cm) SOL103 (140cm) 32mm 8 SOL402 (4x) Ø3,5mm (4x) 13 9 1 10 h- h m 23m SOL091 SOL064 h 11 12 SOL097 mm 25 - 20 1 4x SOL091 13 14 SOL097 1 2 SOL064 Ø6mm (4x) SOL501 (4x) SOL091 14 15 SOL664 (3mm) 1 16 2 SOL653 (4x) SOL518 (4x) 17 IMPORTANT: Silicone must be applied to both sides of the screen as it will be the sole means of fixation to the floor. 15 SET 04 1a 0/ 10 mm 25 Max. 275cm SOL098 cm 40 /1 35 mm 1b 0/ 10 SOL098 When installing the screen directly on to the bathroom floor there are two possibilities: 1b. The block SOL098 is mounted with double sided adhesive tape which is already applied to the block. 1c. NOTE: The block SOL098 is screwed directly into the bathroom floor. In case of floor heating we strongly advise against this installation option. 16 0 12 In both cases the mounting of the floor block is merely an installation help to keep the profile SOL091 in place. The final fixation of the screen will be realized by the application of the silicone seal (step 17). / 20 1 0cm 14 mm 25 35 mm 1c mm 25 35 mm SOL653 SOL501 (2x) Ø6mm (2x) SOL098 2 3 mm 23 h- h SOL091 (2x) SOL064 (2x) h 4 5 SOL097 1 5mm 2 - 20 4x 2 SOL091 SOL098 6 7 SOL097 2 1 SOL064 Ø6mm (4x) SOL501 (4x) SOL091 17 8 SOL664 (3mm) 9 2 1 1 SOL227 SOL653 (4x) SOL518 (4x) 10 1 SOL101 (100cm) SOL102 (120cm) SOL103 (140cm) SOL227 The rubber pads SOL227 may be stacked to level the screen and overcome irregularities of the (tiled) floor. 11 12 SOL097 4x 1 SOL091 18 2 14 13 SOL097 SOL064 Ø6mm (4x) 1 SOL501 (4x) 2 SOL091 15 16 SOL664 (3mm) 2 SOL653 (4x) 1 SOL518 (4x) 17 IMPORTANT: Silicone must be applied to both sides of the screen as it will be the sole means of fixation to the floor. 19 s P w A v051108 SOL796 C
© Copyright 2025 Paperzz