Boundary conditions Work plan – Random cycle

Work plan and next steps –
RDE-LDV working group
RDE-LDV working group
11 September 2012, Brussels, EU
Pierre Bonnel
Martin Weiss
DG - Joint Research Centre (JRC)
IET - Institute for Energy and Transport
Work plan
Work plan - 20 October 2011
Work plan - 31 July 2012
1. Background and objectives
1. Background and objectives
2. Phases and timing
2. Project organization
3. Guidelines for technical activities
3. Technical elements
3.1 Boundary conditions
3.1 Boundary conditions
3.2 Methodology of generating lab
cycles
3.2 Random cycle
3.3 Guidelines for emissions testing
(lab, PEMS)
3.4 Guidelines for data evaluation
3.5 Data submission and
confidentiality
Annexes
3.3 PEMS
4.
Summary of tasks and
contributions
5.
Timing
Annexes
Work plan – 1. Background and objectives
• To conduct a technical assessment of candidate
procedures
• To develop a RDE-LDV test procedure
• To disseminate know-how
• To contribute to legislation drafting
Work plan – 1. Background and objectives
• To conduct a technical assessment of candidate
procedures
• To develop a RDE-LDV test procedure
• To disseminate know-how
• To contribute to legislation drafting
Reporting: RDE-LDV phase I
• Finished draft report
• Internal
revisions/registration
• Final report available
from Oct/Nov 2012
Work plan – 1. Background and objectives
Objectives of Phase II:
• To develop two procedures in parallel
• ACEA leads the development of the random cycle
generator
• JRC leads the development of PEMS
Work plan – 2. Project organization
Project organization – 2.4 Project deliverables
• A technical report describing the development of both
procedures
• Consolidated test protocols for random cycle and PEMS
testing
Work plan – 3. Technical elements
• Boundary conditions
• Random laboratory cycle
• PEMS
Work plan – 3. Technical elements
AUG SEP
2012
NOV DEC
JAN
FEB
2013
MAR APR JUN JUL
AUG SEP
Boundary Conditions
Task 1.1: Provision of building elements
Task 1.2: Development of ranges-values
Random Cycle Generator
Task 2.1: Specifications for the random cycle generator
Task 2.2: Software modifications
Task 2.3: Small scale trials
Task 2.4: Software modifications
Task 2.5: Pilot Phase
PEMS
Task 3.1: Vehicle selection and provision
Task 3.2 Vehicle testing (PEMS)
Task 3.3: Definition of data evaluation strategies
Task 3.4 Data consolidation
Details Task 3.2
Vehicle 1 - JRC - PEMS 1
Vehicle 1 - Site 2 - PEMS 1
Vehicle 2 - JRC - PEMS 1
Vehicle 2 - Site 3 - PEMS 1
Vehicle 3 - JRC - PEMS 2
Vehicle 3 - Site 4 - PEMS 2
Vehicle 4 - JRC - PEMS 2
Vehicle 4 - Site 5 - PEMS 2
Reserved for other
test sites
NOV DEC
Work plan – Boundary conditions
Boundary conditions
Task Leader Contributions
Task 1.1: Provision of
building elements
JRC
ALL
Task 1.2: Development of
ranges-values
JRC
ALL
Dedicated word document
Work plan – Boundary conditions
• ACEA request: Excel file with stakeholder suggestions on
boundary conditions (April 2012)
• Working document: RDE-LDV boundary conditions –
Draft 1 (July 2012)
• List of parameters and data sources
• Uploaded to Circa on 31 July 2012
• 1. Completeness of parameters
• 2. Decision on parameter values
Work plan – Boundary conditions
1. Completeness of parameters and list of reference
information
• Limited feedback
• Agreement on layout and parameter selection
Work plan – Boundary conditions
2. Decision on parameter values
• Earlier feedback (May and June 2012)
• Additional recent feedback
• Feedback should be substantiated by research and
rationale
• Principle approach for selecting values and value ranges
Work plan – Boundary conditions
Possible ways forward
• Ambient conditions: Regulation 582/2011 as basis
• Random cycle development: WLTP short trips
• Challenging parameters, e.g., road grade
• No regulation
• Selection based on expert judgment within RDE-LDV
• Selection based on the analysis of a sample of GIS data
• Comprehensive analysis of European road grad distribution
Work plan – Random cycle
Random cycle generator
Task Leader
Contributions
Task 2.1: Specifications for the
random cycle generator
ACEA
ALL
Task 2.2: Software modifications
ACEA
-
Task 2.3: Small scale trials
ACEA
Testing: TBD
Consolidation
and analysis of
results: TBD
Task 2.4: Software modifications
ACEA
-
Task 2.5: Pilot phase
ACEA
TBD
Update from ACEA
Work plan – Random cycle
3.2. Random cycle generator
• Text document could explain the design and the applied
algorithms
Work plan - PEMS
PEMS
Task Leader Contributions
Task 3.1: Vehicle selection and
provision
JRC
ACEA, Member
States
Task 3.2 Vehicle testing (PEMS) JRC
TBD
Task 3.3: Definition of data
evaluation strategies
JRC
ALL
Task 3.4 Data consolidation
JRC
TBD
Update from JRC
Work plan – Time schedule
PEMS on-road testing
Selecting and providing vehicles
Testing vehicles with PEMS
Vehicle 1 – JRC
Vehicle 1 – Site 1
Vehicle 2 – JRC
Vehicle 2 – Site 1
Vehicle 3 – JRC
Vehicle 3 – Site 2
Vehicle 4 – JRC
Vehicle 4 – Site 2
Defining methods for data evaluation
Data consolidation
Dec
Nov
Oct
Sep
Aug
Jul
Jun
May
Apr
Mar
Feb
Jan
Dec
2013
Nov
Oct
Sep
Aug
Jul
2012
Work plan - PEMS
Who is willing to contribute to PEMS testing?
• ... to provide test vehicles?
• ... to provide test sites?
• ... when?
DG - Joint Research Centre
(JRC)
IES - Institute for Energy
and Transport
Pierre Bonnel:
[email protected]
Martin Weiss:
[email protected]