Work plan and next steps – RDE-LDV working group RDE-LDV working group 11 September 2012, Brussels, EU Pierre Bonnel Martin Weiss DG - Joint Research Centre (JRC) IET - Institute for Energy and Transport Work plan Work plan - 20 October 2011 Work plan - 31 July 2012 1. Background and objectives 1. Background and objectives 2. Phases and timing 2. Project organization 3. Guidelines for technical activities 3. Technical elements 3.1 Boundary conditions 3.1 Boundary conditions 3.2 Methodology of generating lab cycles 3.2 Random cycle 3.3 Guidelines for emissions testing (lab, PEMS) 3.4 Guidelines for data evaluation 3.5 Data submission and confidentiality Annexes 3.3 PEMS 4. Summary of tasks and contributions 5. Timing Annexes Work plan – 1. Background and objectives • To conduct a technical assessment of candidate procedures • To develop a RDE-LDV test procedure • To disseminate know-how • To contribute to legislation drafting Work plan – 1. Background and objectives • To conduct a technical assessment of candidate procedures • To develop a RDE-LDV test procedure • To disseminate know-how • To contribute to legislation drafting Reporting: RDE-LDV phase I • Finished draft report • Internal revisions/registration • Final report available from Oct/Nov 2012 Work plan – 1. Background and objectives Objectives of Phase II: • To develop two procedures in parallel • ACEA leads the development of the random cycle generator • JRC leads the development of PEMS Work plan – 2. Project organization Project organization – 2.4 Project deliverables • A technical report describing the development of both procedures • Consolidated test protocols for random cycle and PEMS testing Work plan – 3. Technical elements • Boundary conditions • Random laboratory cycle • PEMS Work plan – 3. Technical elements AUG SEP 2012 NOV DEC JAN FEB 2013 MAR APR JUN JUL AUG SEP Boundary Conditions Task 1.1: Provision of building elements Task 1.2: Development of ranges-values Random Cycle Generator Task 2.1: Specifications for the random cycle generator Task 2.2: Software modifications Task 2.3: Small scale trials Task 2.4: Software modifications Task 2.5: Pilot Phase PEMS Task 3.1: Vehicle selection and provision Task 3.2 Vehicle testing (PEMS) Task 3.3: Definition of data evaluation strategies Task 3.4 Data consolidation Details Task 3.2 Vehicle 1 - JRC - PEMS 1 Vehicle 1 - Site 2 - PEMS 1 Vehicle 2 - JRC - PEMS 1 Vehicle 2 - Site 3 - PEMS 1 Vehicle 3 - JRC - PEMS 2 Vehicle 3 - Site 4 - PEMS 2 Vehicle 4 - JRC - PEMS 2 Vehicle 4 - Site 5 - PEMS 2 Reserved for other test sites NOV DEC Work plan – Boundary conditions Boundary conditions Task Leader Contributions Task 1.1: Provision of building elements JRC ALL Task 1.2: Development of ranges-values JRC ALL Dedicated word document Work plan – Boundary conditions • ACEA request: Excel file with stakeholder suggestions on boundary conditions (April 2012) • Working document: RDE-LDV boundary conditions – Draft 1 (July 2012) • List of parameters and data sources • Uploaded to Circa on 31 July 2012 • 1. Completeness of parameters • 2. Decision on parameter values Work plan – Boundary conditions 1. Completeness of parameters and list of reference information • Limited feedback • Agreement on layout and parameter selection Work plan – Boundary conditions 2. Decision on parameter values • Earlier feedback (May and June 2012) • Additional recent feedback • Feedback should be substantiated by research and rationale • Principle approach for selecting values and value ranges Work plan – Boundary conditions Possible ways forward • Ambient conditions: Regulation 582/2011 as basis • Random cycle development: WLTP short trips • Challenging parameters, e.g., road grade • No regulation • Selection based on expert judgment within RDE-LDV • Selection based on the analysis of a sample of GIS data • Comprehensive analysis of European road grad distribution Work plan – Random cycle Random cycle generator Task Leader Contributions Task 2.1: Specifications for the random cycle generator ACEA ALL Task 2.2: Software modifications ACEA - Task 2.3: Small scale trials ACEA Testing: TBD Consolidation and analysis of results: TBD Task 2.4: Software modifications ACEA - Task 2.5: Pilot phase ACEA TBD Update from ACEA Work plan – Random cycle 3.2. Random cycle generator • Text document could explain the design and the applied algorithms Work plan - PEMS PEMS Task Leader Contributions Task 3.1: Vehicle selection and provision JRC ACEA, Member States Task 3.2 Vehicle testing (PEMS) JRC TBD Task 3.3: Definition of data evaluation strategies JRC ALL Task 3.4 Data consolidation JRC TBD Update from JRC Work plan – Time schedule PEMS on-road testing Selecting and providing vehicles Testing vehicles with PEMS Vehicle 1 – JRC Vehicle 1 – Site 1 Vehicle 2 – JRC Vehicle 2 – Site 1 Vehicle 3 – JRC Vehicle 3 – Site 2 Vehicle 4 – JRC Vehicle 4 – Site 2 Defining methods for data evaluation Data consolidation Dec Nov Oct Sep Aug Jul Jun May Apr Mar Feb Jan Dec 2013 Nov Oct Sep Aug Jul 2012 Work plan - PEMS Who is willing to contribute to PEMS testing? • ... to provide test vehicles? • ... to provide test sites? • ... when? DG - Joint Research Centre (JRC) IES - Institute for Energy and Transport Pierre Bonnel: [email protected] Martin Weiss: [email protected]
© Copyright 2025 Paperzz