IESOTP 223-2a To: Technical Panel From: John Boudreau, Market Rules Date: March 24, 2009 Re: MR-00348: Enhanced Day-Ahead Commitment Process (EDAC): 24 Hour Optimization and 3-part Offers Attached for Technical Panel consideration is amendment submission MR-00348-Q00 (IESOTP 223-2b). Background At its meeting on February 24, 2009 the Technical Panel was provided with a presentation on the Enhanced Day-Ahead Commitment (EDAC) Design and on the scope and workplan for the EDAC market rule amendments. The EDAC Design has been approved by the IESO Board and as discussed at the last Panel meeting MR-00348-Q00 represents the first package of EDAC market rule amendments. For further information on the EDAC design please refer to: http://www.ieso.ca/imoweb/consult/consult_se21.asp. Additionally, for further information on the development of the EDAC detailed design please refer to: http://www.ieso.ca/imoweb/consult/consult_se73.asp. Recommendation – Warrants Consideration The IESO recommends that the Technical Panel determine that the amendment MR-00348-Q00 warrants consideration as it meets the following criteria for such a determination: It identifies means to better enable the market to satisfy the market design principles. The EDAC Design provides a solution that enhances the efficiency of the current Day-Ahead Commitment Process for the scheduling and commitment of resources required to provide electricity supply on a daily basis. Public Page 1 of 2 IESOTP 223-2a Recommendation - Priority The IESO recommends that the Technical Panel assign a high priority to the development of the EDAC market rules. The EDAC design addresses a need for the IESO’s efficient integration and optimization of Ontario’s changing electricity generation infrastructure. A high priority in regards to MR-00348 would mean discussion and review of the amendment proposal at the following Technical Panel meetings [April 22, May 26, and June 23 (request to post for comments)], and culminating in a request for a vote of recommendation to the IESO Board at the panel’s meeting on August 18. Recommendation – Stakeholder Consultation The IESO recommends that stakeholders be asked to comment on the amendment proposal when it is available in accordance with the normal practices of the Technical Panel. Recommendation – Cost-Benefit Analysis The EDAC design has already undergone a cost-benefit analysis and therefore an additional one is not required as part of the justification for the proposed changes. Yours truly, John Boudreau Attach. Public Page 2 of 2
© Copyright 2026 Paperzz