1762 Clifton Road, Suite 1200 Atlanta, Georgia 30322 (404) 727-5922 FAX: (404) 727-9778 LABORATORY SELF-INSPECTION CORRECTIVE ACTION PLAN FORM Instructions: Complete this form electronically for each completed Lab Self-Inspection. Save the completed form as <LSI CAP_building_PI_room>. Submit the saved file to EHSO at [email protected]. Retain a copy of the completed form along with Laboratory Self-Inspection in your EHSO Lab Safety Binder for three years. INSPECTION INFORMATION Inspection Form Used (check one box): Lab Self-Inspection Lab Self-Inspection: Greenhouse Facilities, USDA/APHIS Containment, Arthropod Containment Date of Inspection: Building: Department: Principal Investigator: Room #: Conducted By: CORRECTIVE ACTIONS Are there any items marked “No” on the Self-Inspection Form? Yes – Use the table below to record corrective actions. No – You are done. Save & submit to [email protected]. Item # on SelfInspection Form List each item with a checkmark in the ‘No’ column on the SelfInspection Form Laboratory Self Inspection Corrective Action Plan_11.dot Proposed Corrective Action(s) Revision Date: 27-Nov-12 Page 1 of 2 LABORATORY SELF-INSPECTION CORRECTIVE ACTION PLAN You are done. Save & submit to [email protected]. Laboratory Self Inspection Corrective Action Plan_11.dot Revision Date: 27-Nov-12 Page 2 of 2
© Copyright 2026 Paperzz