laboratory self-inspection corrective actions plan

1762 Clifton Road, Suite 1200
Atlanta, Georgia 30322
(404) 727-5922
FAX: (404) 727-9778
LABORATORY SELF-INSPECTION CORRECTIVE ACTION PLAN FORM
Instructions:
 Complete this form electronically for each completed Lab Self-Inspection.
 Save the completed form as <LSI CAP_building_PI_room>.
 Submit the saved file to EHSO at [email protected].
 Retain a copy of the completed form along with Laboratory Self-Inspection in your EHSO Lab
Safety Binder for three years.
INSPECTION INFORMATION
Inspection Form Used (check one box):
Lab Self-Inspection
Lab Self-Inspection: Greenhouse Facilities, USDA/APHIS Containment, Arthropod Containment
Date of Inspection:
Building:
Department:
Principal Investigator:
Room #:
Conducted By:
CORRECTIVE ACTIONS
Are there any items marked “No”
on the Self-Inspection Form?
Yes – Use the table below to record corrective actions.
No – You are done. Save & submit to [email protected].
Item # on SelfInspection Form
List each item with a
checkmark in the ‘No’
column on the SelfInspection Form
Laboratory Self Inspection Corrective Action Plan_11.dot
Proposed Corrective Action(s)
Revision Date: 27-Nov-12
Page 1 of 2
LABORATORY SELF-INSPECTION CORRECTIVE ACTION PLAN
You are done. Save & submit to [email protected].
Laboratory Self Inspection Corrective Action Plan_11.dot
Revision Date: 27-Nov-12
Page 2 of 2