H2 Layout for EMU a brief report of a couple of visits by Darin A., Jay R., and FG H2 Layout TTCmi/ex PC#1 plus add’l rack space gas pad more rack space + room for desks H2 beam dump HCAL • • • • • • ME1/ 1 magnet preferred location of CSCs Available rack space in Bats. HNA360, 363 and possibly 370 (TTC) Desk space available in Bat. HNA363 fast cables between H2 TTCmi/ex rack (HNA370) and available rack space in HNA360. Fast and wireless networks available Gas lines and hook-ups available need to add multiple concrete blocks for the CSC constellation July 2, 2004 H2 Layout for EMU 2 main CSC location an artist’s impression … concrete block cable tray need more of those … July 2, 2004 H2 Layout for EMU 3 Gas hook-ups gas pad patch panel • Available space on the mezzanine gas pad • Available (and labeled) gas lines • Patch panels in the beam area July 2, 2004 H2 Layout for EMU 4 Open Issues • ME1/1 location – directly behind HCAL • quantify punch through, but at higher rates? • timing issue? • PC location likely to be inside the beam area. – in conjunction with the other 3 chambers • similar set-up as previous EMU Slice Test • compact set-up beneficial for timing • TTC setup – install 6U crate close to TTCmi (HN370) • use fast cables – split fiber signal and install TTC crate in HN360 • Safety requirements regarding the “CSC floor” – too many concrete blocks may block access to a search box behind the beam dump July 2, 2004 H2 Layout for EMU 5
© Copyright 2024 Paperzz