geurts_H2layout

H2 Layout for EMU
a brief report of a couple of visits
by Darin A., Jay R., and FG
H2 Layout
TTCmi/ex
PC#1 plus
add’l rack space
gas pad
more rack space
+ room for desks
H2 beam
dump
HCAL
•
•
•
•
•
•
ME1/
1
magnet
preferred location
of CSCs
Available rack space in Bats. HNA360, 363 and possibly 370 (TTC)
Desk space available in Bat. HNA363
fast cables between H2 TTCmi/ex rack (HNA370) and available rack space in HNA360.
Fast and wireless networks available
Gas lines and hook-ups available
need to add multiple concrete blocks for the CSC constellation
July 2, 2004
H2 Layout for EMU
2
main CSC location
an artist’s impression …
concrete block
cable tray
need more of those …
July 2, 2004
H2 Layout for EMU
3
Gas hook-ups
gas pad
patch panel
• Available space on the mezzanine gas pad
• Available (and labeled) gas lines
• Patch panels in the beam area
July 2, 2004
H2 Layout for EMU
4
Open Issues
• ME1/1 location
– directly behind HCAL
• quantify punch through, but at higher rates?
• timing issue?
• PC location likely to be inside the beam area.
– in conjunction with the other 3 chambers
• similar set-up as previous EMU Slice Test
• compact set-up beneficial for timing
• TTC setup
– install 6U crate close to TTCmi (HN370)
• use fast cables
– split fiber signal and install TTC crate in HN360
• Safety requirements regarding the “CSC floor”
– too many concrete blocks may block access to a search box behind the
beam dump
July 2, 2004
H2 Layout for EMU
5