POST-ASSESSMENT MODERATION REPORT RCC CIVIL PLANT OPERATION General Details Moderator Moderation Quarter Number Name: Name: Assessor or Provider Contact Email: Phone Postal: RCC Package Title: Material design ☐ Assessor ☐ Commercial ☐ Connexis ☐ Provider Pre assessment moderation and unit standard review requirements ☐ ☐ ☐ Connexis produced assessment material Evidence of Connexis Pre assessment moderation The material requires modifications (see below) Yes Yes Yes ☐ ☐ ☐ No No No Use this space to indicate areas in which modification is required Moderation Result The assessor decisions about the trainee(s) performance are supported out of Signed: Post-Assessment Moderation Report RCC CPO V1 (CMAP) Copyright © Infrastructure ITO Inc. 2014 Date: Page 1 POST-ASSESSMENT MODERATION REPORT RCC CIVIL PLANT OPERATION Moderation Decisions Trainee Samples Number of samples requested: 1 Sample identification 2 Number of samples submitted: 3 (trainee name) Assessor decision of assessed work (A or N) Moderator decision of assessed work (A or N) Sample Evidence 1 2 3 A. Entry Criteria ☐ ☐ ☐ Yes NZ Citizen documents correct ☐ ☐ ☐ Yes Permanent resident documents correct ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ 1 2 3 B. Qualifications and trade endorsements ☐ ☐ ☐ Yes ROA required and details achievement of standards listed ☐ ☐ ☐ Yes Standards listed no ROA in evidence ☐ ☐ ☐ Yes Proof of qualifications / trade endorsements documents correct ☐ ☐ ☐ No Proof of qualifications / trade endorsements 1 2 3 C. Selection of specialist strands ☐ ☐ ☐ No Strand selected ☐ ☐ ☐ Yes Equivalent qualification for theory unit selected? ☐ ☐ ☐ No Equivalent qualification for theory unit selected? 1 2 3 D. Work history ☐ ☐ ☐ No ☐ ☐ ☐ Yes Work history 5 years /proof of current employment in NZ Work history 5 years & C/V ☐ 1 ☐ 2 ☐ 3 Yes Proof of current employment in NZ correct for type of resident ☐ ☐ ☐ Yes Complete and correct ☐ ☐ ☐ No Complete and correct Proof of qualifications Yes 5 years experience in telecommunications Current employment in NZ as telecommunications technician Evidence insufficient Evidence insufficient Evidence insufficient Evidence insufficient Evidence insufficient E. Employer recommendation Post-Assessment Moderation Report RCC CPO V1 (CMAP) Copyright © Infrastructure ITO Inc. 2014 Evidence insufficient Page 2 POST-ASSESSMENT MODERATION REPORT RCC CIVIL PLANT OPERATION Yes/No 1 Sample 2 3 Section 2 Assessment task sheets does the evidence submitted by each trainee meet CRAVES? (‘No’ comment required) On job documentation: Letter of attestation Site visit (assessor discretion) Strand requirements met? Evidence of referee contact (assessor discretion) Evidence of correct PPE and hazard control procedures Post-Assessment Moderation Report RCC CPO V1 (CMAP) Copyright © Infrastructure ITO Inc. 2014 Page 3 POST-ASSESSMENT MODERATION REPORT RCC CIVIL PLANT OPERATION Yes Assessor No Evidence of professional discussion ☐ ☐ ☐ ☐ ☐ Yes Assessor documentation complete Date of contact Was the assessor contacted? Outcome of Assessor Contact Comments Compliance Issues 1 2 3 ☐ ☐ ☐ Front cover details complete? ☐ ☐ ☐ Assessor and trainee signatures on the front page? ☐ ☐ ☐ Assessor feedback to trainee noted? The following do not affect the moderation decision, Connexis will follow-up issues as required. Post-Assessment Moderation Report RCC CPO V1 (CMAP) Copyright © Infrastructure ITO Inc. 2014 Page 4
© Copyright 2026 Paperzz