BIDDER: _____________________ _____________ SCHEDULE OF QUANTITIES AND PRICES SANTA ANA Schedule 33B - City of Santa Ana, 17th Street Crossing DESCRIPTION BID ITEM 33-01570-01 MAINTENANCE AND PROTECTION OF TRAFFIC REMOVE EXISTING FENCE, POST AND FOUNDATION 33-02050-01 REMOVE EXISTING CURB AND GUTTER 33-02050-07 REMOVE EXISTING CONCRETE PAVEMENT 33-02050-09 DEMOLISH AND REMOVE EXISTING MEDIAN AND CURB 33-02050-12 SAWCUT 33-02050-13 REMOVE EXISTING K-RAIL AND RE-USE ON THE PROJECT 33-02050-14 REMOVE TREES AND SHRUBS AS REQUIRED TO IMPROVE LINE OF SIGHT 33-02100-01 BY OTHERS REHAB EXISTING GRADE CROSSING PANELS (BY OTHERS) 33-04220-01 THICKENED EDGE SIDEWALK 7" AC PAVEMENT 33-02513-04 VARIABLE A.C. PAVEMENT AT END OF CROSSING PANELS PER SCRRA STD. PLAN 2006 33-02513-05 REMOVE 8" AC PAVEMENT AND COORDINATE WITH OTHERS TO INSTALL THE RAILROAD SIGNAL CONDUCTIVE LOOPS 33-02513-06 PLACE 8" AC PAVEMENT WITH GLASS GRID PER SCRRA STD PLAN ES4001, DETAIL B. COORDINATE WITH OTHERS TO INSTALL RAILROAD SIGNAL CONDUCTIVE LOOPS. 33-02513-07 8" CURB AND GUTTER (EXCAVATION, WASTES OFFSITE, AND BACKFILL SHALL BE CONSIDERED INCIDENTAL WORK) 33-02528-01 8" FULL DEPTH CONCRETE CURB(EXCAVATION, WASTES OFFSITE AND BACKFILL SHALL BE CONSIDERED INCIDENTAL WORK) 33-02528-04 6” PCC SIDEWALK WITH #4 W.W.M. (EXCAVATION, WASTES OFFSITE, IMPORT AND GRADING SHALL BE CONSIDERED INCIDENTAL WORK) 33-02528-06 ADA WALKWAY RAMP (EXCAVATION, WASTES OFFSITE, IMPORT AND GRADING SHALL BE CONSIDERED INCIDENTAL WORK) 33-02528-10 PLACE STAMPED CONCRETE IN MEDIAN ISLAND. THE UNIT PRICE INCLUDE SAND BACKFILL AS REQUIRED TO PLACE SPECIFIED AC THICKNESS FLUSH WITH TOP OF CURB 33-02528-11 ADJUST UTILITY VAULT, MAN HOLE, VALVE, PULL BOX TO GRADE 33-02528-13 33-02580-01 SIGNING 33-02580-02 STRIPING 4’ HIGH WELDED WIRE MESH FENCE 33-02820-01 CONSTRUCT HAND RAILING PER APWA STD PLAN 606-2, TYPE B, LENGTH PER PLAN. HANDRAILS SHALL BE POWDER COATED 33-05520-01 SELF CLOSING SWING GATE ASSEMBLY INCLUDING FABRICATION, FOUNDATION, AND INSTALLATION 33-05521-01 ADA DETACTABLE WARNING SURFACE 33-09616-01 33-2890-11 TRAFFIC SIGNAL IMPROVEMENTS - E. 17TH STREET 33-8000-01 RAILROAD SIGNAL AND RR ACTIVE WARNING DEVICES – (BY OTHERS) UNIT PRICE $10,000 $30 $80 $4 $10 $6 $35 $2,500 $1,200 $20 $11 $15 BF-19 TOTAL PRICE $10,000 $600 $320 $2,064 $2,850 $906 $700 $2,500 $57,600 $500 $7,040 $1,800 SF 2,085 $3 $6,255 SF 2,085 $8 $16,680 LF 4 $70 $280 LF 121 $25 $3,025 SF 1,414 $20 $28,280 SF 250 $2,000 $500,000 SF EA LS LS LF 323 6 1 1 110 $12 $500 $5,900 $10,090 $15 $3,876 $3,000 $5,900 $10,090 $1,650 LF 170 $180 $30,600 EA SF LS LS 4 60 1 1 $4,000 $45 $200,000 $490,000 $16,000 $2,700 $200,000 $490,000 GRADE CROSSING WORK SUBTOTAL CONTINGENCY TOTAL Schedule 33B - City of Santa Ana, 17th Street Crossing IFB NO. C3101-09 UNIT QUANTITY LS 1 LF 20 LF 4 SF 516 SF 285 LF 151 LF 20 LS 1 TF 48 LF 25 SF 640 SF 120 $1,405,216 $140,522 $1,545,738 ISSUED: 9/25/2008 BIDDER: _____________________ _____________ SCHEDULE OF QUANTITIES AND PRICES ORANGE Schedule 3B - City of Orange, Meats Avenue Crossing DESCRIPTION BID ITEM 3-01570-01 MAINTENANCE AND PROTECTION OF TRAFFIC SAWCUT 3-02050-13 REMOVE EXISTING ASPHALT PAVEMENT (4" TO 6" THICKNESS) OTHER THAN THOSE PAVEMENT REMOVALS PAID UNDER BID ITEMS 02513-06 & 02513-09 3-02050-03 3-02050-07 REMOVE EXISTING CURB AND GUTTER DEMOLISH AND REMOVE EXISTING MEDIAN AND CURB 3-02050-12 3-02100-01 REMOVE TREES AND SHRUBS AS REQUIRED TO IMPROVE LINE OF SIGHT 7" AC PAVEMENT 3-02513-04 VARIABLE A.C. PAVEMENT AT END OF CROSSING PANELS PER SCRRA STD. PLAN 2006 3-02513-05 REMOVE 8" AC PAVEMENT AND BASE COORDINATE WITH OTHERS TO INSTALL THE RAILROAD SIGNAL CONDUCTIVE LOOPS 3-02513-06 PLACE 8" AC PAVEMENT WITH GLASS GRID PER SCRRA STD PLAN ES4001, DETAIL B. COORDINATE WITH OTHERS TO INSTALL RAILROAD SIGNAL CONDUCTIVE LOOPS. 3-02513-07 3-02513-09 3-02528-01 3-02528-03 3-02528-06 3-02528-07 3-02528-09 3-02528-10 3-02528-11 3-02528-13 3-02580-01 3-02580-02 3-02820-01 3-03300-01 3-04220-01 3-05520-01 3-05521-01 3-09616-01 3-2890-05 3-8000-01 REMOVE EXISTING PAVEMENT AND BASE AND PLACE 8" FULL DEPTH AC PAVEMENT 8" CURB AND GUTTER (EXCAVATION, WASTES OFFSITE, AND BACKFILL SHALL BE CONSIDERED INCIDENTAL WORK) 8" DOWELED CONCRETE CURB 6” PCC SIDEWALK WITH #4 W.W.M. (EXCAVATION, WASTES OFFSITE, IMPORT AND GRADING SHALL BE CONSIDERED INCIDENTAL WORK) 4” PCC SIDEWALK (EXCAVATION, WASTES OFFSITE, IMPORT, AND GRADING SHALL BE CONSIDERED INCIDENTAL WORK) PCC CURB RAMP (EXCAVATION, WASTES OFFSITE, IMPORT AND GRADING SHALL BE CONSIDERED INCIDENTAL WORK) ADA WALKWAY RAMP (EXCAVATION, WASTES OFFSITE, IMPORT AND GRADING SHALL BE CONSIDERED INCIDENTAL WORK) PLACE STAMPED CONCRETE IN MEDIAN ISLAND. THE UNIT PRICE INCLUDE SAND BACKFILL AS REQUIRED TO PLACE SPECIFIED AC THICKNESS FLUSH WITH TOP OF CURB ADJUST UTILITY VAULT, MAN HOLE, VALVE, PULL BOX TO GRADE SIGNING STRIPING 4’ HIGH WELDED WIRE MESH FENCE DEMOLISH AND REVOME AS REQUIRED TO EXTEND EXISTING CULVERT WITH CAST IN PLACE REINFORCED CONCRETE SIGNAL BOX CULVERT, HEADWALLS AND WINGS WALL INCLUDING STRUCTURAL EXCAVATION AND BACKFILL-MEATS CROSSING THICKENED EDGE SIDEWALK CONSTRUCT HAND RAILING PER A.P.W.A. STD. PLAN 606-2, TYPE B, LENGTH PER PLAN. HANDRAILS SHALL BE POWDER COATED SELF CLOSING SWING GATE ASSEMBLY INCLUDING FABRICATION, FOUNDATION, AND INSTALLATION ADA DETACTABLE WARNING SURFACE TRAFFIC SIGNAL IMPROVEMENTS - MEATS AVENUE RAILROAD SIGNAL AND RR ACTIVE WARNING DEVICES – (BY OTHERS) UNIT PRICE $10,000 $3 BF-19 TOTAL PRICE $10,000 $660 SF LF SF LS SF SF 106 16 190 1 380 85 $5 $30 $10 $1,000 $11 $15 $530 $480 $1,900 $1,000 $4,180 $1,275 SF 725 $3 $2,175 SF 725 $8 $5,800 SF 382 $15 $5,730 LF LF 16 289 $60 $18 $960 $5,202 SF 771 $20 $15,420 SF 250 $18 $4,500 EA 2 $2,000 $4,000 SF 330 $20 $6,600 SF EA LS LS LF 726 4 1 1 10 $15 $500 $4,100 $6,270 $30 $10,890 $2,000 $4,100 $6,270 $300 LS LF 1 120 $30,000 $150 $30,000 $18,000 LF 147 $60 $8,820 EA SF LS LS 4 95 1 1 $4,000 $45 $200,000 $468,000 GRADE CROSSING WORK SUBTOTAL CONTINGENCY TOTAL Schedule 3B - City of Orange, Meats Avenue Crossing IFB NO. C3101-09 UNIT QUANTITY LS 1 LF 220 $16,000 $4,275 $200,000 $468,000 $839,067 $83,907 $922,974 ISSUED: 9/25/2008 PROJECT COST ESTIMATE ORANGE Project Name: Schedule 3B - City of Orange, Meats Avenue Crossing Design Level: Last Updated: ITEM DESCRIPTION QUANTITY UNIT COST TOTAL COST MOBILIZATION DEMOBILIZATION CTO-JLP036-Rev3 Orange County Grade Crossings Safety Improvements Camera Ready 9/25/2008 NOTES Preferred $62,930 $20,977 CONSTRUCTION SUBTOTAL CONSTRUCTION CONTINGENCY (See Cost Details Page) $839,067 $83,907 SUB-TOTAL: CONSTRUCTION COSTS $1,006,880 CIVIL / STRUCTURAL ENGINEERING: GEOTECHNICAL INVESTIGATION N/A SURVEY / AERIAL MAPPING DESIGN & DESIGN SUPPORT $1,230 0.25% of Construction $46,748 9.5% of Construction $7,722 1.5% of Signal Construction SIGNALS -RR MOC COSTS SIGNAL MAINTENANCE SUPPORT $41,184 8% of Signal Construction DESIGN & DESIGN SUPPORT $48,906 9.5% of Signal Construction CONSTRUCTION INSPECTION $41,184 8% of Signal Construction RIGHT OF WAY ACQUISITION N/A ENVIRONMENTAL CLEARANCE N/A CONSTRUCTION MANAGEMENT $80,550 8% of Construction AGENCY COSTS $60,413 6% of Construction PROJECT MANAGEMENT $20,138 2% of Construction FLAGGING $70,482 7% of Construction PERMITTING/CITY REQUIREMENTS $20,138 2.0% of Construction OWNER-PROVIDED MATERIALS N/A SUB-TOTAL ENGINEERING & AGENCY COSTS $438,694 PROJECT CONTINGENCY INFLATION $72,279 Rate: # 5.50% Years: 2.00 5% of Construction, Engineering & Agency Costs $171,555 TOTAL: $1,689,408 UTILITIES (BY OCTA) GRAND TOTAL $ $1,689,408 SCRRA FORM DPM-05 PROJECT COST ESTIMATE SANTA ANA Project Name: CTO-JLP036-Rev3 Orange County Grade Crossings Safety Improvements Schedule 33B - City of Santa Ana, 17th Street Crossing Design Level: Last Updated: Camera Ready 9/25/2008 ITEM DESCRIPTION QUANTITY UNIT COST TOTAL COST MOBILIZATION DEMOBILIZATION NOTES Preferred $105,391 $35,130 CONSTRUCTION SUBTOTAL CONSTRUCTION CONTINGENCY (See Cost Details Page) $1,405,216 $140,522 SUB-TOTAL: CONSTRUCTION COSTS $1,686,259 CIVIL / STRUCTURAL ENGINEERING: GEOTECHNICAL INVESTIGATION N/A SURVEY / AERIAL MAPPING DESIGN & DESIGN SUPPORT $2,868 0.25% of Construction $108,990 9.5% of Construction SIGNALS -RR MOC COSTS $8,085 1.5% of Signal Construction SIGNAL MAINTENANCE SUPPORT $43,120 8% of Signal Construction DESIGN & DESIGN SUPPORT $51,205 9.5% of Signal Construction $43,120 8% of Signal Construction CONSTRUCTION INSPECTION RIGHT OF WAY ACQUISITION N/A ENVIRONMENTAL CLEARANCE N/A CONSTRUCTION MANAGEMENT $134,901 AGENCY COSTS $101,176 6% of Construction $33,725 2% of Construction $118,038 7% of Construction $33,725 2.0% of Construction PROJECT MANAGEMENT FLAGGING PERMITTING/CITY REQUIREMENTS OWNER-PROVIDED MATERIALS N/A SUB-TOTAL ENGINEERING & AGENCY COSTS $678,953 PROJECT CONTINGENCY $118,261 INFLATION 8% of Construction Rate: # 5.50% Years: 2.00 5% of Construction, Engineering & Agency Costs $280,694 TOTAL: $2,764,167 UTILITIES (BY OCTA) GRAND TOTAL $ $2,764,167 SCRRA FORM DPM-05 CROSSINGS SURVEY CONTROL HORIZONTAL AND VERTICAL CONTROL RAILROAD ACTIVE WARNING DEVICES HORIZONTAL AND VERTICAL CONTROL RAILROAD ACTIVE WARNING DEVICES ENGINEERED FOUNDATION TO MITIGATE FOR UTILITIES IN CONFLICT WITH NEW RAILROAD SIGNAL FOUNDATION RAILROAD SIGNAL FOUNDATION INSTALLED ON CONCRETE BOX CULVERT PEDESTRIAN TREATMENT PROVIDED IN ACCORDANCE WITH SCRRA STANDARDS ADDITIONAL PANELS TO ACCOMMODATE NEW SIDEWALK TREATMENT SQUARE OFF TRACKSIDE MEDIAN ISLAND PEDESTRIAN TREATMENT ADJACENT TO RAILROAD STATION DOUBLE YELLOW STRIPING TO PROHIBIT U-TURN ON RAILRAOD TRACKS ADVANCE RAILROAD CROSSING WARNING SIGNS TRIM TREES TO CLEAR LINE OF SIGHT FOR SIGNAGE UPDATE RAILROAD CROSSING STRIPING IF SO REQUIRED FENCE AND GATE INSTALLED TO SEAL RAILROAD CORRIDOR FENCE AND GATE INSTALLED TO SEAL RAILROAD CORRIDOR PEDESTRIAN TREATMENT PROVIDED IN ACCORDANCE WITH SCRRA STANDARDS PEDESTRIAN TREATMENT ADJACENT TO RAILROAD STATION PEDESTRIAN TREATMENT ADJACENT TO RAILROAD STATION ADDITIONAL PANELS TO ACCOMMODATE NEW SIDEWALK TREATMENT MEDIAN ISLAND INSTALLED TO PROHIBIT DRIVING AROUND THE RAILROAD ENTRANCE GATE REHAB GRADE CROSSING IF SO REQUIRED PEDESTRIAN TREATMENT PROVIDED IN ACCORDANCE WITH SCRRA STANDARDS CLOSE DRIVEWAY TO PROHIBIT TRUCKS MAKING DIAGONAL MOVEMENTS ACROSS THE TRACKS SQUARE OFF TRACKSIDE MEDIAN ISLAND MEDIAN ISLAND INSTALLED TO PROHIBIT DRIVING AROUND THE RAILROAD ENTRANCE GATE ADVANCE RAILROAD CROSSING WARNING SIGNS UPDATE RAILROAD CROSSING STRIPING IF SO REQUIRED DOUBLE YELLOW STRIPING TO PROHIBIT U-TURN ON RAILRAOD TRACKS FENCE AND GATE INSTALLED TO SEAL RAILROAD CORRIDOR FENCE AND GATE INSTALLED TO SEAL RAILROAD CORRIDOR PEDESTRIAN TREATMENT PROVIDED IN ACCORDANCE WITH SCRRA STANDARDS CLOSE DRIVEWAY TO PROHIBIT TRUCKS MAKING DIAGONAL MOVEMENTS ACROSS THE TRACKS RELOCATE DRIVEWAY TO PROHIBIT DIAGONAL MOVEMENT ACROSS THE RAILROAD TRACKS MEDIAN ISLAND INSTALLED TO PROHIBIT DRIVING AROUND THE RAILROAD ENTRANCE GATE ADDITIONAL PANELS TO ACCOMMODATE NEW SIDEWALK TREATMENT PEDESTRIAN TREATMENT PROVIDED IN ACCORDANCE WITH SCRRA STANDARDS SQUARE OFF TRACKSIDE MEDIAN ISLAND EXIT GATE WITH LOOPS TO PROHIBIT DRIVING AROUND THE RAILROAD GATES DOUBLE YELLOW STRIPING TO PROHIBIT U-TURN ON RAILRAOD TRACKS UPDATE RAILROAD CROSSING STRIPING IF SO REQUIRED ADVANCE RAILROAD CROSSING WARNING SIGNS ADVANCE RAILROAD CROSSING WARNING SIGNS UPDATE RAILROAD CROSSING STRIPING IF SO REQUIRED PEDESTRIAN TREATMENT PROVIDED IN ACCORDANCE WITH SCRRA STANDARDS FENCE AND GATE INSTALLED TO SEAL RAILROAD CORRIDOR ADA RAMPS TO ACCOMMODATE STEEP GRADES RELOCATE DRIVEWAY TO PROHIBIT DIAGONAL MOVEMENT ACROSS THE RAILROAD TRACKS
© Copyright 2026 Paperzz