Stericycle, Inc. 95 Deerhurst Drive Brampton, ON L6T 5R7 Tel.: (905) 789-6660 Fax: (905) 789-6661 NOTE TO FILE March 30, 2015 As required by Condition 95 of the Certificate of Approval A680324, we have reviewed the financial assurance evaluation below and confirm that the amounts are still correct and valid. Disposal rates at NewAlta and at Warren are still as shown below. There is therefore no need to change the amount of financial assurance for this site. Dan Kokol Environment, Health & Safety Coordinator March 18, 2014 Director Environmental Assessment and Approvals Branch Ministry of Environment 2 St. Clair Avenue West, 12th floor Toronto, Ontario M4V 1L5 Dear Director: Re: Financial Assurance Evaluation – Stericycle Brampton Site Please find below our evaluation of the amount of financial assurance required given the requested increase in the amount of waste to be stored on site. We have attached invoice copies and statements to confirm the stated rates. Assumptions: • Maximum allowable amount of waste on site: 250 m. tonnes • The waste stored on site is as follows: o 36 m. tonnes (3 bins) of incinerator ashes o 214 m. tonnes of untreated waste (all types) 1 • • All the untreated waste will be disposed of by incineration. This disposal method is acceptable for all waste types and also represents the most costly disposal alternative. Anatomical biomedical waste storage is limited to the volume (weight) that can physically be stored within the on-site refrigeration unit Disposal cost: • Incinerator ashes (36 m. tones) are sent to BFI for final disposal (landfill) o Disposal cost per m. tonne: $/tonne (36 *$95.00): o Transportation cost per bin: $ 3 bins @ $720 $3,420.00 $2,160.00 Total cost incinerator ash disposal: • Untreated waste (214 m. tones) is sent to Stericycle, Warren, OH for incineration. o A trailer can hold 10 m. tonnes of waste: 22 shipments required o Labor to load all 22 trailers: 15 man-hours to load one trailer @ $50/hour 22 * 15 * $50/hour: $16,500.00 o Disposal cost at Stericycle Warren, OH Intercompany rate is US$ /lbs 0.10 Conservative rate: CDN$ /lbs 0.20 Disposal cost (214 tonnes * 2,204lbs/tonne *$/lbs): $94,311.20 o Transportation cost to Warren 22 return trips @ $ 1,500 $33,000.00 Total cost treatable and inc. waste disposal: $143,831.20 TOTAL COST WASTE DISPOSAL: • $5,580.00 Miscellaneous labour, supervision and clean up o Supervision and securing the premises o 1000 hours @ $100/hour o Site clean up 2 $149,411.20 $10,000.00 $25,000.00 GRAND TOTAL WASTE DISPOSAL: $184,411.20 Administrative cost and contingency (20%) • $36882.24 Grand total $221,293.44 We therefore recommend that the amount of financial assurance be fixed at $225,000. I trust that this is the information required and that it meets with your approval. Should you have any questions or require additional information, please do not hesitate to contact me accordingly. Regards, Dan Kokol Environment, Safety and Health Coordinator Stericycle ULC. INTERCOMPANY INCINERATION RATE Collection Processing Sub Sub 512971 512977 512972 512978 512972 512974 512974 3 112444 112444 396983 396983 455551 455551 467661 Total Weight 229.8 45,927.1 2,058.9 243,512.1 17.0 75,643.8 24,961.2 Waste Collection Processing @ Sub $0.10 per lb 22.98 4,592.71 205.89 24,351.21 1.70 7,564.38 2,496.12 Brampton Brampton Alberta Vancouver Alberta Winnipeg Winnipeg Processing Sub Warren Warren Morton Morton StPaul StPaul KansasC Description Warren proc of Brampton Warren proc of Brampton Morton proc of Alberta Morton proc of Vancouver StPaul proc of Alberta StPaul proc of Winnipeg KansasC proc of Winnipeg
© Copyright 2026 Paperzz