MHARNESS Wizard - Electro Magnetic Applications, Inc.

DEMA
MHARNESS Wizard
Tim McDonald, PhD
Christel Amburgey
May 1, 2014
ELECTRO MAGNETIC
APPLICATIONS, INC
DEMA
Preparation
ELECTRO MAGNETIC
APPLICATIONS, INC
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
Block Diagram of Sample Cable
Sample cable named WCM1109
connected to WCM1159 through a junction
T02
T01
W1109_J03_T02
J03W1109_J03_T03
T03
W1109_J02_J03
W1109_J01_T01
J02
J01
W1109_J01_J02
W1109_J02_T04
T04
W1109
We must create unique
names for traceability in the
analysis for segments,
junctions (J) and
terminations (T).
W1109_J01_J04
J04
W1109_J04_J05
J05
W1109_J05_T05
T05
W1109_J05_J06
W1109_J04_T06
W1109_J06_J07
J06
T06
W1159_J07_J08 W1159_J08_J09
J07
J08
J09
W1159_J09_T10
W1159
T10
W1109_J06_T07
W1159_J08_T08 W1159_J09_T09
Lengths between
connections are
not to scale
T07
T08
T09
3
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
Compile the Inner Conductor
Information
• First we compile all of the interior connection
information from relevant spreadsheets/data.
Cable Connections
4
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
Route the Inner Conductor Connections
Based on Block Diagram
Connection number
Connection type (T=TSP)
Take each connection
and trace through block
diagram segments
Gauge
Number of
wires
TSPs, etc.
5
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
Compiling Parameters
6
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
Compiling Parameters
7
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
Probes – Pin Transients
For each connection, we would like to probe the pin short circuit (SC) current
and open circuit voltage. We choose to probe at end 2 (for this case we
should have pin to pin connectivity) and we are choosing to open the circuit
at end 2 for open circuit (OC) cases. Again we choose to use the first S0
conductor in the TSP as a SC and the second for an OC.
8
DEMA
Running the Wizard
ELECTRO MAGNETIC
APPLICATIONS, INC
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
Create a Simplified Cable Model in
CADfix
• Define units corresponding
to 3D CAD (1” cells from
mesh).
• Use a short dummy length
for visualization (5”
segments).
• Define a time step.
• Construct a lattice around
model to mesh (model
must be meshed to run
MHARNESS Wizard tool).
• Place all geometry in a set
(sall, etc.) to mesh.
10
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
Check Orientation of Lines
CADfix Command
Ploc sens on
Arrow goes from end 1 to end 2
To change orientation
Orev linename
Once this is completed then put all geometry into a mesh set and mesh
11
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
Start the MHARNESS V4 Wizard
12
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
Filename
and Time
Step
value and
number
are
populated
automatic
ally but
user can
modify
Select level of
shielding – in this
case we have TSP
shielding and an
overbraid so we
have two levels of
shielding.
When using MHARNESS
Wizard with full 3D model
(not simplified cable
model) you can put the
set name of the cable you
wish to make a
MHARNESS input file for
if there are multiple
cables.
For now enter mesh set
containing all geometry.
13
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
Select all cables
Select all
terminations
Select
Boundary
Conditions for
Terminations
Note, in the wizard, we are
ignoring grounded connectors
such as J07. We will put these
in manually later.
14
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
Next the Wizard
will highlight
each segment
in the CAD and
request input
Input Segment
Name
1 mm
default
End 1 and End
2 names (Slide
11) Note enter
0 for
terminations
In general, we apply a source to all
segments (Unless they are a dummy
segment such as what is described on
slide 10.) The type of source from EMA 3D
is a Segment Current Drive from a
datafile. We generally name the source
file after the segment it is applied to.
15
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
After input each segment, you will be asked to input the total
number of level 1 (in our case TSP) cables.
16
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
Now you will be asked to route each TSP cable.
You should have the preparation material handy to help keep track
of the cables.
17
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
Select segments
cable is routed
through
Select end
points
Generally we consider
the TSPs shorted to
the overbraid and then
tied to ground.
So 1e-6 (short) or 2.5
mOhm bonding
resistance is
commonly used.
If you accidently
miscalculate the number of
cables it can be changed
by this “Change Number
S1 Conductors” button and
BACK if you make a
mistake
18
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
Next you will be prompted to enter the gauge and
cable type. Standard values will automatically
populate – these can be edited if necessary
Cable Path is
highlighted
We generally assume a
background of air and a
jacket with a dielectric of 3
– but these can be edited
19
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
Then you are asked to enter the
core wire dielectric (again default
is 3) and the boundary
conditions.
In general for lightning transient
predictions, we look at short
circuit current and open circuit
voltage. To do this we must
make two separate runs.
The short circuit run has all S0
boundary conditions shorted.
The open circuit run has end 2
open and end 1 shorted.
20
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
MHARNESS then
asks if the next
conductor has the
same routing path
(if you have 18
conductors with
the same routing
path this will save
you significant
time).
21
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
undo
Make shield larger or smaller
Navigate
back and
forth
between
segments
22
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
Additional Cable Pack Features
Visualize existing MHARNESS file
(beta)
Zoom
view
Output file
when done
23
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
• Maker sure the cables have some extra
space even though this is fictitious
(MHARNESS requires this).
Note the conductor number is
also shown - this is important
because there is some variation
in current depending upon
position within the bundle.
24
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
Consideration for Probes
For this example cable, we moved all of the probed
cables to be closest to the shield (Cable 1) for the
segment they are probed at. There is some variance due
to cable position but in general the margin applied to the
transients should account for this.
25
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
After packing the cables in Cablepack, the Wizard will
highlight each cable and populate input parameters. These
parameters should be checked against those calculated
previously.
Previously for this
segment, a resistance of
1.73 mohm/m and a
transfer imductance of
1.65 nH were assumed,
so we would need to edit
these values
26
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
We do not use connector
conductance for this case
(Shielded TSPs)
If there was a lossy material between the twisted
pairs we can chose to model this using the
connector conductance. Values are entered in
1/Ohms (i.e. 2.5 mOhms would be entered as 400
in the conductance matrix).
Depiction of Shield (Overbraid) and TSPs
Connector
Conductance
Boundary Condition
Connector
Conductance
Boundary Condition
Boundary Condition
Connector
Conductance
Boundary Condition
Connector
Conductance
27
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
Enter the number of probes:
28
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
29
DEMA
ELECTRO MAGNETIC
APPLICATIONS, INC
MHARNESS Wizard
And create your .inp file!
30