filtration system questionnaire

FILTRATION SYSTEM QUESTIONNAIRE
The information provided on this form will be used to generate your proposal. Please provide accurate
information. Please contact your sales representative if you have any questions.
Company:
From:
Phone:
Fax:
Address:
Email:
Application:
Due Date:
Space Limitations: Length:
Width:
Height:
Ft
In
m
FLUID CHARACTERISTICS
Name of Liquid:
Composition of Liquid:
Density:
Lb/ft3
Viscosity:
Kg/m3,
Pressure:
PSI
Bar, pH:
Operating Temperature:
cps, Temperature:
°C
°F
Room Temperature:
cps, Temperature:
°C
°F
Manufacturer/ Part Number/ Other:
Flow Rate:
GPM
Operating time:
Process:
LPM,
Constant
Variable, Describe:
Hrs/ day
Continuous
Days/ week
Batch, If Batch, Volume:
Gal
Weeks/ month,
L, QTY Per
EXISTING FILTRATION SYSTEM
Make:
Type:
Model:
DE
Filter Aid:
Solids:
Cellulose
Yes
Total
Activated Carbon
Cartridge,
No Specifications:
Suspended, per hour by: Weight:
Other
PSID Existing Cake: Pressure Drop
% or
PPM or
PSID
Gal
L
Composition of Solids:
Cake Washing, Purity, Disposal:
JLM: July 27, 2010
Page 1 of 4
ELECTRICAL CONTROLS
Controls required:
Yes
No,
Level of Automation:
Available Power
V
Hz, Control Voltage
Manual,
Automatic
V
Hz
Requirements:
THERMAL CHARACTERISTICS
Ambient air temperature
Cooling required:
Yes
min,
No,
max
°C
Cool-down Time
°F
Hour
Desired Coolant Temperature
min,
max
°C
°F
Minimum Coolant Temperature
min,
max
°C
°F
°C
°F
Coolant:
Chilled water
Heating required:
Yes
Glycol (attach data sheet), Temperature
No,
Heat up time
Hour
Desired temperature
min,
max
°C
°F
Maximum temperature
min,
max
°C
°F
°C
°F
Source:
Hot Water Temperature
Steam, Line Size
In
m, Pressure
PSI
Bar
Other/ Requirements
TANKAGE
Above Grade:
Below Grade:
JLM: July 27, 2010
On Floor
Sump
At Every Machine on Floor
Overhead Drain Piping
In Pit
Floor
In Pit Shared for Several Machines
Trench in Floor – Gravity Drain To Tank
Page 2 of 4
PROCESS MACHINE
Manufacturer
Type
Quantity
Number of Grinding Spindles
Total Grinding Spindle Power
Grinder: Drain to Floor
In
m, Drain Elevation
Swarf: Loading
Lb
Upstream Separation Required:
Yes
Kg,
KW
In
per
Hr
m
Day
Week
PSI
Bar
No, If yes, describe:
Machining Process:
Milling
Type of Grinding:
Cylindrical
Face
Super Finishing:
Polishing
Honing
Material:
Steel
Clean Pumps: QTY
HP
Turning
Drilling
Flute
EDM
Hardened steel
Deep Drilling, Other:
External V Gear, Other:
ECM, Other:
Cast iron
, Flow Rate:
Balance Pressure Relief Valve
Carbide, Other:
GPM
LPM, Pressure:
VFD
Stand-By
NOTES:
JLM: July 27, 2010
Page 3 of 4
JLM: July 27, 2010
Page 4 of 4