Pakistan Hunting & Sporting Arms Development Company Injection Molding Unit This prefeasibility study will provide preliminary guidance to the loan beneficiary to setup a small Injection Molding Unit for plastic parts manufacturing of firearms. There are about 68 SMEs fully functional in local Peshawar cluster. About 100~150 assemblies are produced per month by each unit. The average total assemblies produced in cluster per month is about 6800 to 10200 and demands higher quantity of small parts for these assemblies. Injection molding unit by nature is a mass production process with one time investment. The major cost of installation is totally based on molding die and injection molding machine with a very lean maintenance cost. The life of molding die ranges from 20,000 to 100,000 castings depending on material’s physical & mechanical properties and working environment. It is also specialized in producing prismatic, axisymmetric and other intricate profiled parts enriched with engineering & sculptural features, relatively at a higher rate without disturbance in dimensional accuracy as a factor cannot be ignored. Like grips, butt-stocks, fore-ends, picatinny rails, handgun frames and rear sights etc. that are very difficult to be produced conventionally. CAPITAL INVESTMENT FOR THE PROJECT CAPITAL INVESTMENT AMOUNT (RS.) Renovation Cost / Rent Furniture & Fixtures Machinery & Equipment Advance Rent & Security Deposit Preliminary Expenses Total Capital Cost Initial Working Capital Total Project Cost 205,000 189,000 1,200,000 196,800 50,000 1,840,800 336,800 2,177,600 SPACE REQUIREMENT SPACE REQUIREMENT Area (Sq. Ft) Cost of Renovation (Amount) 1,200 250 600 2,050 120,000 25,000 60,000 205,000 Production Hall Office and Tool Shop Ware House Total Area MACHINERY AND EQUIPMENT DESCRIPTION Injection Molding Machine (Used) Molds (Used/provided by vendor) Total QUANTITY COST Rs. /unit TOTAL Rs. 1 1 2 900,000 300,000 900,000 300,000 1,200,000 Pakistan Hunting & Sporting Arms Development Company FURNITURE & OFFICE EQUIPMENT COST DESCRIPTION QUANTITY UNIT COST Rs. AMOUNT 1 1 2 1 1 1 10 17,000 14,000 14,000 60,000 20,000 25,000 25,00 17,000 14,000 28,000 60,000 20,000 25,000 25,000 189,000 Table and Chair Set (Owner) Table & Chair Set (Customers) Table& Chair Set (Office Staff) Air Conditioner (Split Unit) Sofa Set for Customers Curtains / Decor Waiting Chairs Total HUMAN RESOURCE REQUIREMENT DESCRIPTION No. OF EMPLOYEES MONTHLY SALARY TOTAL MONTHLY SALARY Owner Accountant Purchaser Store Keeper Production Manager Electrician Hydraulics Technician Machinist/Operator Helper Total Staff 1 1 1 1 1 1 1 3 2 12 28, 000 15,000 10,000 10,000 25,000 15,000 15,000 12, 000 10, 000 28,000 15,000 10,000 10,000 25,000 15,000 15,000 36,000 20,000 174,000 Net profit per month: PKR- 120,000 Net profit per year: PKR- 1,440,000 For details regarding each of head mentioned above, please contact through our help-desk or call within official timings on following details. PAKISTAN HUNTING & SPORTING ARMS DEVELOPMENT COMPANY (PHSADC) Address: Ground Floor, State Life Building, The Mall, Peshawar, Pakistan Tel: +92-91-9211124, 9212223 | Fax: +92-91-9210186 E-mail: [email protected]| URL: www.phsadc.org Note: All costs are assumed as per current market rates / prices and are subject to change due to change of costs in future. 90% of the total project cost will be financed through Prime Minister’s Youth Business Loan; remaining 10% will be borne by the beneficiaries themselves.
© Copyright 2026 Paperzz